ML20058G073

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-413/82-14 & 50-414/82-11 on 820608-11.No Noncompliance Noted
ML20058G073
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/08/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20058G078 List:
References
NUDOCS 8208030192
Download: ML20058G073 (2)


See also: IR 05000413/1982014

Text

"

w .

,

^

July 8, 1982 N 6\d

l

l

.

I

Duke Power Company

ATTN: Mr. W. O. Parur, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

Subject: Report No. ,50-414/82-11

This refers to the routine safety inspection conducted by Mr. A. B. Ruff of this

office on June 8-11, 1982, of activities authorized by NRC Construction Permit

Nos. CPPR-116 and CPPR-117 for the Cat:vba facility and to the discussion of our

findings held with Mr. S. Dressler, Senior Construction Engineer, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of '

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

..

Within the scope of this inspection, no violations or deviations were disclosed.

4

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

j be placed in the NRC's Public Document Room unless you notify this office, by

j telephone, within ten days of the date of this letter and submit written

i application to withhold information contained therein within thirty days of the

,

date of this letter. Such application must be consistent with the requirements

j of 10 CFR 2.790(b)(1). *

Shouid you have any questions concerning this letter, we will be glad to' discuss

thein with you.

]

J

j Sincerely,

'

.

i

." hance," "

! . ief

Reactor Projects Branch 2

l

l Division of Project and

j Resident Programs

4

! Enclosure (See Page 2)

i m

J  :

l lggeSD0 0 $

G

i-

. - - . -

T Eol

. -- -

T

'

.

' July 8, 1982

-

Duke Power Company 2 -

.

Enclosure:

Inspection Report Nos. 50-413/82-14, '

50-414/82-11

cc w/ encl:

J. W. Hampton, Station Manager ,

J. C. Rogers, Project Manager

bcc w/ encl:

Document Management Branch

State of South Carolina

NRC Resident Inspector

.

.

.

9

RII RII./?, RII RII

6A

ABRuff:es T Co on

06(

ARHerdt

OA f_

AJIgndtonis

RING

HCDance

7/A/82 y/f /82 }/S/82 /7

/82 6 /82