IR 05000413/1982010

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-413/82-10 & 50-414/82-04 on 820326-0425. Noncompliance Noted:Failure to Follow Procedures for Document Control & for Corrective Action Re Class a Pressurizer Relief Valves
ML20062J383
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/14/1982
From: Bryant J, Van Doorn P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20062J162 List:
References
50-413-82-10, 50-414-82-04, 50-414-82-4, NUDOCS 8208160349
Download: ML20062J383 (6)


Text

. .

  1. UNITED STATES o,,

8 g NUCLEAR REGULATORY COMMISSION e REGION 11

$

Q 101 MARlETTA ST N.W., SUITE 3100 s ATLANTA, GEORGIA 30303

%*****o[

Report Nos. 50-413/82-10 and 50-414/82-04 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Facility Name: Catawba Docket Nos. 50-413 and 50-414 License Nos. CPPR-116 and CPPR-117 Inspection at Catawba site near Rock Hill, South Carolina Inspector: [/ d_ c[ng/ m, f 5 Da e gned P. K. Va ,Doorn' g /

amu h

'

Approved by: z/. __5/j_i/g2 J . C . B r,@ n t , ton Chief Divij'sion of Date S1gned Projedt and R ident Programs SUMMARY Inspection on March 26 - April 25,1982 Areas Inspected This routine, announced inspection involved 102 resident inspector-hours on site in the areas uf reactor coolant pressure boundary piping-observation of welding

,

activities (Unit 2); fire prevention / protection (Units 1 and 2); safety-related l piping-observation of welding activities (Unit 2); safety-related piping support and restraint systems (Units 1 and 2)- electrical (components and systems) -

observation of work (Units 1 and 2); electrical (cables and terminations) -

observations of work and work activities (Units 1 and 2); review of corrective action and followup of NRC identified items (Units 1 and 2).

Results l

'

Of the eight areas inspected, no violations or deviations were identified in six areas; two violations were found in two areas (failure to follow procedure for document control paragraph 9.c; and, failure to follow procedure for corrective action concerning Class A pressurizer relief valves paragraph 6).

~

8208160349 820802 PDR ADOCK 05000413

,

O PDR E

.

.

DETAILS Persons Contacted Licensee Employees

  • J. C. P.ogers, Project Manager S. W. Dressler, Senior Construction Engineer
  • W. O. Henry, QA Manager, Technical Services T. H. Robertson, Construction Engineer, Civil / Welding R. A. Morgan, Project QA Engineer
  • J. C. Shropshire, QA Supervisor H. D. Mason, QA Supervisor J. E. Cavender, level III Inspector Other licensee employees contacted included construction craftsmen, engineers, technicians, cnd of fice personne * Attended exit interview Exit Interview The inspection scope and findings were summarized on April 23, 1982, with those persons indicated in paragraph I abov The unresolved item and violations described in paragraphs 5.c. , 6, and 9.c. , were discussed in detai . Licensee Action on Previous Inspection Findings Not inspecte . Unresolved Items Unresolved items are matters about which more information is required to determine whether they are acceptable or may involve violations or devia-tions. A new unresolved item identified during this inspection is discussid in paragraph . Independent Inspection Ef forts (Units 1 and 2) , The inspector conducted general inspection of site work andc work activities; observed protection and storage of mechanical equipmer.t, electrical equipment, electrical cables, instrumentation and piping; and observed housekeepin The inspections were performed in the auxiliary building, containment buildings, pipe fabrication shop and storage area *

~

. .

.

2 (Closed) Inspector Followup Item (413, 414/82-06-02) Verification of improved mechanical QC inspector qualification program. The inspector verified that the licensee has implemented an improved program. The new program includes specific categorization of inspector The inspector noted on April 7, 1982 that extensive water and mineral seepage was occurring into the auxiliary building at elevation #52 Discussions with the licensee revealed that this seepage had been evaluated in 1977 and documented by letter from M. C. Green to 0. Beam dat rd October 6,1977. However, based on the irispector's review of the 1 censee's documentation it appears that this evaluation only addressec additional water inventory caused by the seepage and did not address corrosive effects on installed equipmen The licensee indicated that further evaluation would be performe This is an Unresolved Item (413/82-10-01, 414/82-04-01 - Evaluation of ground water seepage into auxiliary building).

No violations or deviations were identifie . Nonconforming Item Reports Review The inspector reviewed numerous nonconforming item reports (NCI's) to determine if requirements were met in the ares of documentation, approvals, evaluation, justification, and corrective actio On April 8,1982 the inspector noted that the disposition / evaluation of NCI No.13,781 appeared to be inadequate. This NCI documents discrep-ancies found on Class A pressurizer relief valves caused by the vendo The NCI identifies defects, e.g. slag on welds and cracks which are rejectable to the applicable Code (ASME III, 77S78). The initial licensee evaluation dated February 11, 1982 indicated that the defects were acceptable to the code requirement The licensee indicated verbally that they felt that the cracks were not present in the valves, however, one area was being further evaluated. This further evaluation is described in the licensee's second evaluation dated March 12, 198 The first evaluation was not rescinde In addition, licensee Vendor Surveillance Report dated February 11, 1982 states that "the problems as noted on the NCI do exist." No evaluation is identified concerning the vendor. This evaluation is necessary since the required liquid penetrant inspection could not have been properly performed by the vendor with slag on the weld Slag on the welds is a Code rejectable defec Licensee Construction Quality Assurance Program Procedure 01, Control of Nonconforming Items, Rev.16 requires dis-position / evaluations of NCI's to be clear, complete and contain proper technical content. The above NCI is in noncompliance with this procedure in that the disposition / evaluation appears to accept Code rejectable defects and no evaluation of the vendor is specified. This is a Violation (413/82-10-02, 414/82-04-02 failure to follow procedure for corrective action concerning Class A pressurizer relief valves).

% ,-

'

- ,

,y ,

. j

/ 1

-

-

,

'

.

.,!

< 3 l

,  !

, s

' s' .

'- ,.

No otner vic'ations! or , deviations, -except as identified abcve' were identifii '

s

' . Safety-Relat?d Pipe Support and Restraint Systems (Unity 1 and 2)

>

.

.

'. . /

The apolicable code .for 1 safety-related pipe support pid restraint ; systems installation is the ASME Boiler and Pressure Vessel Code,Section III, ~

Subsection NF,1974' Edit l'on plus addenda through summer 1975. The inspector observed installation in pregress for Class A snubber rastraint 1-R-Hi 1353 -

,

for 'ccaformance to requirements in the areas of use of'specified materials, conformhnce to drawing, inspections, and in pro:eis documentaticn. .In -

addition. t'he inspector observed welding in prog'rbss' for class NF Weld .,-

No. 2NI 15-i7 for conlormance to Code and procedure requirement

p / '

/ ,

No violations or deviations were identifie '

j j i; Fire Prevention / Protection - Observation of Worr ard Work Activities / .

(Units 1 and 2) - ,

The- inspector observed fire prevention / protection prma0res and co5trols for adequacy in preventing damage to safety related itedis., Areds Feviewed ~

incluced control of combustible solids and liquids, control of construction processes such as welding and heat treating, cf.mtrol of _ smoking,;hause-keeping practices, control of fire suppressicr' couipment, and provisionk for fire drill ,

, / / , /

,

'

_

No violations or dev'ations were identified.' J ,7 ,' Electrical (Cabl es . .and Terminations) - Chservation of Worl'ad! Work Activities (Un'ts 1 and 2) y ,

,

,

,

, . Requirements for c5h!e terminations are delineated in va rious y DPC D specifications drawingst and site procedures. The.inspectoeobserved ,e inspection of completed ' cable tray supports HR2234 at azimuth 63 45'

. for conformance to procedure dhawing and specification irequirement g Areas reviewed included use of; 14teg approved ,d cuments,y 3 use, cf -

speci fied material, dir<ensions and 'configuratien,' anchorage, location, and weldin y ,

e .n

.-

The inspector observed irstalied' cables,in various areas in both units

^ for protection of cable and cac~le trays from construction activities, securing of coiled cable, protection'of cable ends, support of cable, and debris in cable trays. - ~ On April 8, 1982 the inspector noted that electrical QC inspectors had in their possession copies of selected pages of specification CNS 1390.01-00-0083, " Cable Tray and Hanger Inspection Tolerances."

Cons.truction QA Procedure G-1, Document Control, Rev.16 requires

'

s

, ~Z w- . ,,

.. .

.

\

V, 4

.

uncontrolled documents to be marked " Uncontrolled not for Construc-tion," Therefore, possession of the above described copies did not conform with procedural requirements and constitutes a violation

-

(413/82-10-03, 414/82-04-03 - failure to follow procedure for document control).

'

~

This finding was brought to the licensee's attention in which further

'

, review by the licensee indicates that the problem was isolated only to

./

the electrical inspectors and that no out-of-tolerance installations had occurred as a result of the uncontrolled copies. Furthermore,the

-

licensee retrained all QC inspectors concerning document control as a

- -

result of this ite <

No violations or deviations, except as identified in paragraph 9.c., were identified.

'

1 Electrical (Components and Systems) - Observation of Work Activities (Units 1 and 2)

^[ Electrical equipment is being installed in accordance with various DPC specifications and procedure CQAP-M41. The inspector observed protection of installed electrical equipment and equipment in storage. The inspector also observed installation in progress of electrical cabinet 2EATC21 for

"7 ._^

_

conformance to requirements in the areas of installation location, con-

.,

- figuration, anchorages, documentation, and inspectio s' No violations or deviations were identifie . Safety-Related Piping (Welding) - Observation of Work and Work Activities (Unit 2)

,y  ! The applicable code for installation of safety-related piping is the ASME

~

' '

/ Boiler and Pressure Vessel Code,Section III,1974 Edition plus addenda through summer 1975. The inspector observed in process welds at various

, ,( j ? stages of completion and reviewed records for conformance to code and 4 procedure requirements in the areas of documentation of pertinent infor-mation and QC signoffs via a weld traveler, availability of pertinent instructions, use of appropriate qualified weloing procedure, provisions for weld repair provided, certification of filler materials, verification of base material certification, control of welding parameters, verification of welder qualification, use of specified shielding and purge gas, condition of

, welding equipment, provisions for voltage and amperage checks, verification

'

of proper fitup, control of preheat and interpass temperature, condition of weld and base metal surfaces, and verification that appropriate inspections

,

were being performed. The following welds were observed:

m F

.,

-

i .

.- .-

.. .

,

Weld N Size (Inch Dia.) Stage of Welding 00 served 2NS9-;S 9 Intermediate 2NS 102-2 1 Fitup 2FW 48-4 12 Fitup 2FW 48-13 12 Final 2NV 471-21 2 Fitup plus visual inspection of fitup 2NV 471-22 2 Fitup plus visual inspection of fitup 2NV 471-23 2 Fitup plus visual inspection of fitup 2NV 471-24 2 Fitup plus visual inspection of fitup No violations or deviations were identifie . Reactor Coolant Pressure Boundary Piping - Observation of Work and Work Activities (Unit 2)

The applicable code is delineated in paragraph 11. The inspector observed handling and protection of piping for fitup of weld 2NC46-5 for conformance to procedure and code requirements in the areas of control of tools for grinding, brushing and filing, use of appropriate handling and rigging equipment and control of cleanlines No violations or deviations were identifie I v