Attachm:nt b TXX 93292 Pago 9 cf 11 COM ANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT REV.3 DOCKET NO: N UNIT: CPSES 1 DATE: August 11,1993 COMPLETED BY: Janet Hughes TELEPHONE: 817-897-5331 OPERATING STATUS

1. Reporting Period: JANUARY 1993 Gross hours in reporting period: 2M
2. Currently authorized power level (MWI): 3111 Max. depend, capacity (MWe-Net): 1E Design Electrical Rating (MWe-Net): 1S
3. Power level to which restricted (if any) (MWe-Net): NONE
4. Reasons for restriction (if any):

m!S MCNTH YRTODATE CUMULATIVE 704.4 704.4 16,223

5. Number of hours reactor was critical 39.6 39.6 2,298 2
6. Reactor reserve shutdown hours 688 3 6883 15,847.3
7. Hours generator on line 0 0 0
8. Unit reserve shutdown hours 1,950,103 1,950,103 49,245,930
9. Gross thermal energy generated (MWH)

G67,267 667,267 16,302,432

10. Gross electrical energy generated (MWH)
11. Net electrical energy generated (MWH) 61 633,961 15,476,337
12. Reactor Service factor 94.7 94.7 74.9
13. Reactor availability factor 100.0 100.0 85.5
14. Unit service factor 92.6 92.6 73.2
15. Unit availability factor 92.6 92.6 73 2 74.1 74.1 62.1
16. Unit capacity factor (Using MDC) 74.1 74.1 62.1
17. Unit capacity factor (Using Design MWe)
18. Unit forced outage rate 7.4 74 7.9
19. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
20. If shutdown at end of report period, estimated date of startup:
21. Units in test status (prior to commercial operation): ACHIEVED Commercial Operation 900813 Estimated 9308180157 93081o n JANUARY 1993 REVISION 3 00000$f