Monthly Operating Repts for Jul 1993 for CPSES Units 1 & 2
ML20056D849
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/31/1993
From:
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20056D795 List:
References
NUDOCS 9308180152
Download: ML20056D849 (8)


Text

.

J

Attachm:nt toLTXXJ93292

? Pags 1.of 11, i

I COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 a

. NRC MONTHLY OPERATING REPORT -

DOCKETNO:

N I

UNIT:

CPSES 1.

j DATE:

. August 11,1993 j

COMPl.ETED BY:

Janet Hughes i

TELEPHONE:

817-897 5331,

-l OPERATING STATUS j

1.

Reporting Period: JULY 1993 Gross hours in reporting period:

ZM 2.

Currently authorized power level (MWt):

M11 Max. depend.' capacity (MWe-Net): it'iQ * ~ Design Electrical Rating (MWe-Net):

1150-l 3.

Power level to which restricted (if any) (MWe-Net):

NONE 4.

Reasons for restriction (if any):

j

~

THISMONTH YRTODATE - CUMULATIVE ~

744-

5,022-20,540 -

]

5.

Number of hours reactor was critical O

E5 2,324.

]

6.

Reactor reserve shutdown hours 744 4,998' 20,156:

7.-

. Hours generator on line.

O O

O l

8.

Unit reserve shutdown hours 1

~

3' 9.

Gross thermal energy generated (MWH) :

846,814 5.4 7,683 21,082.848 10.

Gross electrical energy generated (MWH) 810,578 5,210,937 20,053,3131

]

~ 11. ' Net electrical energy generated (MWH).

~ 12.

Reactor Service factor 100.0 98.7 79.0

13. Reactor availability factor 100.0 100.0:

87.9 -

14. ~ Unit service factor 100.0 98.3

'773 100.0 98.3 L775

,15.

Unit availability factor 94.7 89.1

' 67.1 16.

Unit capacity factor (Using MDC)

M.7 89.1 67.1.

'.17..

Unit capacity factor (Using Design MWe) 0 1.8 6.4.

18.

Unit forced outage rate 19.'. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):. Refueling Outage Number,

l 3 is scheduled to begin October 8,' 1993, with a norninal duration of 70 days.'

'i 20.

If shutdown at end of report period, estimated date of'startup:

1

- 21.

Units in test status (prior to commercial operation):

. ACHIEVED j

' CommercialOperation

'900813 i

-i Estimated :

j 9308100152 930810 fj DR ADOCK 0500 5

T gj g

c-

-e p-a

+ '

- Attachment to TXX-93292 Page 2 of 11 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

N UNIT:

CPSES 1 DATE:

August 11,1993 COMPLETED BY:

Janet Hughes TELEPHONE:

817-897-5331 MONTH: JULY 1993

-DAY AVERAGE DA!LY POWER LEVEL

[RY AVERAGE DA!LYPOWER LEVEL (MWe-Net)

(MWe-Net) 1 1113 17 1092 2

1102 18 1090 3

1102 19 1089 T

4 1102 20 1089' 5

1N 21 1087 6

1096 22 1087 7

1095 23 1080 8

1096 24 1008 9

1091 25 1086 10 1059 26 1087 11 1093 27 1087 12 1095

.28 1088-13 1086 29 1092 14 1101 30 1083 15 1W 31 1087 16 1093

i

?-Attachm:nt to.TXX-93292

. Page 3 of 11

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKETNO:

50445

-l UNIT:

CPSES 1 i,

' DATE:

- August 11 - 1993

~ COMPLETEDBY:

Janet Hughes

-l TEEPHONE:

817 @ 74331' i

t MONTH: JULY 1993

.j 0701 0000 Unit started month in MODE 1.

i

. 07/31 2400 Unit ended month in MODE 1.

{

5 t

s l

5 5

k G

I i

Y t

I a

P P

Attachment.to TXX-93292' Page 4 of 11 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO:

N UNIT:

CPSES 1 DATE:

August 11,1993.

COMPLETED BY:

Janet Hughes REPORT MONTH JULY 1993 METHODOF TWE SHUTTNG DOWN Ff0RCED DURATION THEREACTOROR N1 DATE SSCHEDULED fHOURS)

REASON REDUCH3 POWER CORRECTIVE ACTIONSCOMMENTS 1)

FEASON

2) METHOD A: EQUIPMENT FAILURE (EXPLAIN).

E. OPERATORTRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINTORTEST

' F: ADMINISTRAT1VE 2: MANUALSCRAM C: REFUEUNG

- G OPERATIONALERROR(EXPLAIN) 3: AUTOMATIC SCRAM D: REGLA.ATORYHwiHCuCN H: OTHER(EXPLAIN) 4: OTHER(EXPLAIN)

Attichm:nt to TXX-93292 Pags 5.~of 11

-):i COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKETNO:

50446 UNIT:

CPSES 2 l

DATE:

August 11,1993 COMPLETED BY:

Janet Hughes

.l TELEPHONE:

817-897-5331 3

OPERATING STATUS 1.

Reporting Period: JULY 1993 Gross hours in reporting period:

244 2.

Currently authorized power level (MWt):

3411 Max, depend. capacity (MWe-Net): 1HiQ

  • Design-Electrical Rating (MWe-Net):

1150 3.

Power level to which restricted (if any) (MWe-Net):

80112 4.

Reasonsforrestriction(if any):

f TrilSMONTH YRTODATE CUMULATIVE

l 628 1,M

_1,462 5.

Number of hours reactor was critical 116 1R 6.'~

Reactor reserve shutdown hours 1

1,355 W

7... Hours generator on line 0

0

.i

' 8.

Unit reserve shutdown hours 1,2,238 2,563,325 2,563 2 l

9.

Gross thermal energy generated (MWH)

G,120 m,E

.mM 10.

Gross electrical energy generated (MWH) e,120 689 W 689,907

11. Net electrical energy generated (MWH) 12.

Reactor Service factor NA NA NA NA NA NA

i 13.

Reactor availability factor NA-NA NA 14.

Unit service factor NA NA NA

15. Unit availability factor NA NA NA
16. Unit capacity factor (Using MDC)

NA NA-

.NA

'17.

Unit capacity factor (Using Design MWe)

NA NA-N A'~

18.

Unit forced outage rate 19.

Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):

None-l,'!;

20. If shutdown at end of report period, estimated date of startup:
21.. Units in test status (prior to commercial operation):

FORECAST.

ACHIEVED f

Initial Criticality.

930320

- 930324-Initial Electricity 930330 930409-i Commercial Operation 930801 930803 Estimated '

I P

V

.r.

m

" Attachment J to TXX-93292 Page 6 of 11 -

-l AVERAGE DAILY UNIT POWER LEVEL DOCKETNO:

M

. UNIT:

CPSES.2 -

,j DATE:

August 11,1993

-l COMPETEDBY:

Janet Hughes -:

TELEPHONE:

817-8974331

.l MONTH: JULY 1993

- DAY AVERAGE DAILYPOWERLEVEL DAY AVERAGEDAILYPOWER LEVEL (MWe-Net)

(MWe-Net)

- 1 0

17 1025

.f 2

0 18 1100 1

3 0

39 747.

4 0

20 667 -

f 5

0 21' 974 f.

6 0

22 1102

]

7

'O 23

1102-

~'

8 202 24 1102:

9' 637 25 1104-a 919 10 833 26 11-842 27 9 61 12 844 28-0.-

]

13 831

. 29

.O 14-838-30

- 14' 341

.15 873 31_

16 L987 i

Ij i'

. i.,

'Attachm:nt to TXX-93292

' Papa 7 of 11

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO:

50446 UNIT:

CPSES 2 DATE:

Augu<f 11,1993 COMPLETED BY:

_ Janet Hughes TELEPHONE:

817-897 6 331 MONTH: JULY 1993 0701 0000 Unit started month in MODE 3. Retuming from outage for Major Surveillance Testing.

07/03 1557 Unit entered MODE 2.

1630 Reactoris critical.

07/07 1000 Unit entered MODE 1.

1681 Unit synchronized to the grid.

07/15 1230 Performed CE.lorimetric and recommenced initial Startup Testing.

07/18 2241 Excessive pressure drop across Heater Drain Pump Suction Strainer as a result of startup debris. Strainer was cleaned and Heater Drains retumed to service.

07/26 1000 50% Load Reduction Test conducted trom 100% Rated Thermal Power.

07/27 0019 Restored to 100% power.

2055 100% Load Rejection Test. Unit entered MODE 3 following manual reactor trip.

07/29 2332 Unit entered MODE 2.

07/30 0003 Reactoris critical.

1217 Unit entered MODE 1.

1300 Unit synchronized to the grid.

07/31 2400 Unit ended month in MODE 1.

i

_ m m

-.,g

'rd:.h.

t _'

. Attachment 110' TXX-2292

, ~

' Page 8 of 11 UNIT SHUTDOWNS AND POWER REDUCTIONS DCCKET NO:

N UNIT:

CPSES 2 DATE:

Agust 11,1993 '

COMPLETED BY:

Janet Hughes REPORT MONTH JULY 1993 METHODOF TYPE.

SHUTTING DOWN F; FORCED DURATION THEREACTOROR NQ.

DATE SSCHEDULED fBQUBS REASON REDUCINGPOWER CORRECTIVEACTIONS/ COMMENTS 10.

930701 S

160.68 B

1 Major SurveiHance Testing.

- 11 930718 F

0 A

4 Excessive pressure drop across Heater Drain Pump Suction Strainer as a result of startup debris. Strainer was cleaned and Heater Drains -

returned to service.

12 930726.

S 0

B 4

50% Load Reduction Test from 100% Power -

Plateau.

- 13, 930727' S-64.08

- B

'.1 100% Load Rejection Test from 100% Power

- Plateau.

- 2)- METHOD 1)

FEASON A: EQUIPMENT FAILURE (EXPLAIN)

E. ; OPERATOR TRAINING AND UCENSE EXAMNATION 1: MANUAL-B: MAINTORTEST F: ADMNSTRATNE 2: - MANUAL SCRAM C: FEFUEUNG G: OPERATIONALERROR(EXPLAIN) 3: AUTOMATICSCRAM D: FEGULATORYRESTRC110N

. H: OTHER(EXPUWN) 4: OTHER(EXPLAIN) t'--t'r'-@

'e-er e 9e *

+-t A n

4m-

'Wwwee e ' Weav9 W-d=t 94#'W'-'"%'+4'"

"E9F**4%

    • TP'"fM*4-r
  • FT '41%4 T'M MV

&*W"f

T**M

"-'-1MW"Wt*"W W#' " ' '

'**rt't"9'"* FWD M4'"4 YTS#k'OM'OD44'8*4 e-

'4'.=W4''E DW'MwNW's'-

w M

  • Mww*

ma'e wDearw'OL.w-ww-

'w me" at1ir e1mw-Nnt-.inAm-c s TW