I COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 a
. NRC MONTHLY OPERATING REPORT -
DOCKETNO:
N I
UNIT:
CPSES 1.
j DATE:
. August 11,1993 j
COMPl.ETED BY:
- Janet Hughes i
TELEPHONE:
- 817-897 5331,
-l OPERATING STATUS j
1.
Reporting Period: JULY 1993 Gross hours in reporting period:
ZM 2.
Currently authorized power level (MWt):
M11 Max. depend.' capacity (MWe-Net): it'iQ * ~ Design Electrical Rating (MWe-Net):
1150-l 3.
Power level to which restricted (if any) (MWe-Net):
NONE 4.
Reasons for restriction (if any):
j
~
THISMONTH YRTODATE - CUMULATIVE ~
744-
- 5,022-20,540 -
]
5.
Number of hours reactor was critical O
E5 2,324.
]
6.
Reactor reserve shutdown hours 744 4,998' 20,156:
7.-
. Hours generator on line.
O O
O l
8.
Unit reserve shutdown hours 1
~
3' 9.
Gross thermal energy generated (MWH) :
846,814 5.4 7,683 21,082.848 10.
Gross electrical energy generated (MWH) 810,578 5,210,937 20,053,3131
]
~ 11. ' Net electrical energy generated (MWH).
~ 12.
Reactor Service factor 100.0 98.7 79.0
- 13. Reactor availability factor 100.0 100.0:
87.9 -
- 14. ~ Unit service factor 100.0 98.3
'773 100.0 98.3 L775
,15.
Unit availability factor 94.7 89.1
' 67.1 16.
Unit capacity factor (Using MDC)
M.7 89.1 67.1.
'.17..
Unit capacity factor (Using Design MWe) 0 1.8 6.4.
18.
Unit forced outage rate 19.'. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):. Refueling Outage Number,
l 3 is scheduled to begin October 8,' 1993, with a norninal duration of 70 days.'
'i 20.
If shutdown at end of report period, estimated date of'startup:
1
- 21.
Units in test status (prior to commercial operation):
. ACHIEVED j
' CommercialOperation
'900813 i
-i Estimated :
j 9308100152 930810 fj DR ADOCK 0500 5
T gj g
c-
-e p-a
+ '
- Attachment to TXX-93292 Page 2 of 11 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
N UNIT:
CPSES 1 DATE:
August 11,1993 COMPLETED BY:
Janet Hughes TELEPHONE:
817-897-5331 MONTH: JULY 1993
-DAY AVERAGE DA!LY POWER LEVEL
[RY AVERAGE DA!LYPOWER LEVEL (MWe-Net)
(MWe-Net) 1 1113 17 1092 2
1102 18 1090 3
1102 19 1089 T
4 1102 20 1089' 5
1N 21 1087 6
1096 22 1087 7
1095 23 1080 8
1096 24 1008 9
1091 25 1086 10 1059 26 1087 11 1093 27 1087 12 1095
.28 1088-13 1086 29 1092 14 1101 30 1083 15 1W 31 1087 16 1093
i
?-Attachm:nt to.TXX-93292
. Page 3 of 11
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKETNO:
50445
-l UNIT:
CPSES 1 i,
' DATE:
- August 11 - 1993
~ COMPLETEDBY:
Janet Hughes
-l TEEPHONE:
817 @ 74331' i
t MONTH: JULY 1993
.j 0701 0000 Unit started month in MODE 1.
i
. 07/31 2400 Unit ended month in MODE 1.
{
- 5 t
s l
5 5
k G
I i
Y t
I a
P P
Attachment.to TXX-93292' Page 4 of 11 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO:
N UNIT:
CPSES 1 DATE:
August 11,1993.
COMPLETED BY:
Janet Hughes REPORT MONTH JULY 1993 METHODOF TWE SHUTTNG DOWN Ff0RCED DURATION THEREACTOROR N1 DATE SSCHEDULED fHOURS)
REASON REDUCH3 POWER CORRECTIVE ACTIONSCOMMENTS 1)
FEASON
- 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN).
E. OPERATORTRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINTORTEST
' F: ADMINISTRAT1VE 2: MANUALSCRAM C: REFUEUNG
- G OPERATIONALERROR(EXPLAIN) 3: AUTOMATIC SCRAM D: REGLA.ATORYHwiHCuCN H: OTHER(EXPLAIN) 4: OTHER(EXPLAIN)
Attichm:nt to TXX-93292 Pags 5.~of 11
-):i COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKETNO:
50446 UNIT:
CPSES 2 l
DATE:
August 11,1993 COMPLETED BY:
Janet Hughes
.l TELEPHONE:
817-897-5331 3
OPERATING STATUS 1.
Reporting Period: JULY 1993 Gross hours in reporting period:
244 2.
Currently authorized power level (MWt):
3411 Max, depend. capacity (MWe-Net): 1HiQ
- Design-Electrical Rating (MWe-Net):
1150 3.
Power level to which restricted (if any) (MWe-Net):
80112 4.
Reasonsforrestriction(if any):
f TrilSMONTH YRTODATE CUMULATIVE
- l 628 1,M
_1,462 5.
Number of hours reactor was critical 116 1R 6.'~
Reactor reserve shutdown hours 1
1,355 W
- 7... Hours generator on line 0
0
.i
' 8.
Unit reserve shutdown hours 1,2,238 2,563,325 2,563 2 l
9.
Gross thermal energy generated (MWH)
G,120 m,E
.mM 10.
Gross electrical energy generated (MWH) e,120 689 W 689,907
- 11. Net electrical energy generated (MWH) 12.
Reactor Service factor NA NA NA NA NA NA
- i 13.
Reactor availability factor NA-NA NA 14.
Unit service factor NA NA NA
- 15. Unit availability factor NA NA NA
- 16. Unit capacity factor (Using MDC)
NA NA-
.NA
'17.
Unit capacity factor (Using Design MWe)
NA NA-N A'~
18.
Unit forced outage rate 19.
Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
None-l,'!;
- 20. If shutdown at end of report period, estimated date of startup:
- 21.. Units in test status (prior to commercial operation):
FORECAST.
ACHIEVED f
Initial Criticality.
930320
- 930324-Initial Electricity 930330 930409-i Commercial Operation 930801 930803 Estimated '
I P
V
.r.
m
" Attachment J to TXX-93292 Page 6 of 11 -
-l AVERAGE DAILY UNIT POWER LEVEL DOCKETNO:
M
. UNIT:
CPSES.2 -
,j DATE:
August 11,1993
-l COMPETEDBY:
Janet Hughes -:
TELEPHONE:
817-8974331
.l MONTH: JULY 1993
- DAY AVERAGE DAILYPOWERLEVEL DAY AVERAGEDAILYPOWER LEVEL (MWe-Net)
(MWe-Net)
- 1 0
17 1025
.f 2
0 18 1100 1
3 0
39 747.
4 0
20 667 -
f 5
0 21' 974 f.
6 0
22 1102
]
7
'O 23
- 1102-
~'
8 202 24 1102:
9' 637 25 1104-a 919 10 833 26 11-842 27 9 61 12 844 28-0.-
]
13 831
. 29
.O 14-838-30
- 14' 341
.15 873 31_
16 L987 i
Ij i'
. i.,
'Attachm:nt to TXX-93292
' Papa 7 of 11
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO:
50446 UNIT:
CPSES 2 DATE:
Augu<f 11,1993 COMPLETED BY:
_ Janet Hughes TELEPHONE:
817-897 6 331 MONTH: JULY 1993 0701 0000 Unit started month in MODE 3. Retuming from outage for Major Surveillance Testing.
07/03 1557 Unit entered MODE 2.
1630 Reactoris critical.
07/07 1000 Unit entered MODE 1.
1681 Unit synchronized to the grid.
07/15 1230 Performed CE.lorimetric and recommenced initial Startup Testing.
07/18 2241 Excessive pressure drop across Heater Drain Pump Suction Strainer as a result of startup debris. Strainer was cleaned and Heater Drains retumed to service.
07/26 1000 50% Load Reduction Test conducted trom 100% Rated Thermal Power.
07/27 0019 Restored to 100% power.
2055 100% Load Rejection Test. Unit entered MODE 3 following manual reactor trip.
07/29 2332 Unit entered MODE 2.
07/30 0003 Reactoris critical.
1217 Unit entered MODE 1.
1300 Unit synchronized to the grid.
07/31 2400 Unit ended month in MODE 1.
i
_ m m
-.,g
'rd:.h.
t _'
. Attachment 110' TXX-2292
, ~
' Page 8 of 11 UNIT SHUTDOWNS AND POWER REDUCTIONS DCCKET NO:
N UNIT:
CPSES 2 DATE:
Agust 11,1993 '
COMPLETED BY:
Janet Hughes REPORT MONTH JULY 1993 METHODOF TYPE.
SHUTTING DOWN F; FORCED DURATION THEREACTOROR NQ.
DATE SSCHEDULED fBQUBS REASON REDUCINGPOWER CORRECTIVEACTIONS/ COMMENTS 10.
930701 S
160.68 B
1 Major SurveiHance Testing.
- 11 930718 F
0 A
4 Excessive pressure drop across Heater Drain Pump Suction Strainer as a result of startup debris. Strainer was cleaned and Heater Drains -
returned to service.
12 930726.
S 0
B 4
50% Load Reduction Test from 100% Power -
Plateau.
- 13, 930727' S-64.08
- B
'.1 100% Load Rejection Test from 100% Power
- Plateau.
- 2)- METHOD 1)
FEASON A: EQUIPMENT FAILURE (EXPLAIN)
E. ; OPERATOR TRAINING AND UCENSE EXAMNATION 1: MANUAL-B: MAINTORTEST F: ADMNSTRATNE 2: - MANUAL SCRAM C: FEFUEUNG G: OPERATIONALERROR(EXPLAIN) 3: AUTOMATICSCRAM D: FEGULATORYRESTRC110N
. H: OTHER(EXPUWN) 4: OTHER(EXPLAIN) t'--t'r'-@
'e-er e 9e *
+-t A n
4m-
'Wwwee e ' Weav9 W-d=t 94#'W'-'"%'+4'"
"E9F**4%
- TP'"fM*4-r
- FT '41%4 T'M MV
&*W"f
T**M
"-'-1MW"Wt*"W W#' " ' '
'**rt't"9'"* FWD M4'"4 YTS#k'OM'OD44'8*4 e-
'4'.=W4''E DW'MwNW's'-
w M
- Mww*
ma'e wDearw'OL.w-ww-
'w me" at1ir e1mw-Nnt-.inAm-c s TW