Rev 2 to MOR for May 1993 for Cpses,Unit 2
ML20056D855
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/31/1993
From:
TEXAS UTILITIES CO.
To:
Shared Package
ML20056D795 List:
References
NUDOCS 9308180165
Download: ML20056D855 (1)


Text

. Attachm nt to TXX-93292 Page 10 cf 11 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 ,

NRC MONTHLY OPERATING REPORT REV.2 i DOCKET NO: 50446 UNIT: CPSES 2 DATE: August 11,1993

]

COMPLETED BY: Janet Hughes TELEPHONE: 817497-5331 4

OPERATING STATUS

1. Reporting Period: MAY 1993 Gross hours in reporting period: 2.41 l
2. Currently authorized power level (MWt): 3411 Max. depend. capacity (MWe-Net): 1150
  • Design 1 Electrical Rating (MWe-Net): 1150 l
3. Power level to which restricted (if any) (MWe-Net): 220
4. Reasons for restriction (if any):

THIS MONTH YRTODATE CUMULATIVE

5. Number of hours reactor was critical 326 834 834 418 418 418
6. Reactor reserve shutdown hours
7. Hours generator on line 328.1 836 2 0 0 0  :
8. Unit reserve shutdown hours 499,853 1,165,087 1,165,087
9. Gross thermal energy generated (MWH) 152,610 320,680 320,680
10. Gross electrical energy generated (MWH)
11. Net electrical energy generated (MWH) 129,268 2 2,787 268,787
12. Reactor Service factor NA NA NA
13. Reactor availability factor NA NA NA
14. Unit service factor NA NA NA
15. Unit availability factor NA NA NA
16. Unit capacity factor (Using MDC) NA NA NA 17.

NA NA NA Unit capacity factor (Using Design MWe)

18. Unit forced outage rate NA NA NA
19. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
20. If shutdown at end of report period, estimated date of startup: ,
21. Units in test status (prior to commercial operation): FORECAST ACHIEVED Initial Criticality 930320 930324 Initial Electricity 930330 930409 Commercial Operation 930801 Estimated

~

MAY 1993 9308180165 930810 PDR ADOCK 05000445  ; ,_ REVISION .3 R