Text
.
Attachm nt to TXX-93292 Page 10 cf 11 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT REV.2 i
DOCKET NO:
50446 UNIT:
CPSES 2 DATE:
August 11,1993
]
COMPLETED BY:
Janet Hughes TELEPHONE:
817497-5331 4
OPERATING STATUS 1.
Reporting Period: MAY 1993 Gross hours in reporting period:
2.41 2.
Currently authorized power level (MWt):
3411 Max. depend. capacity (MWe-Net): 1150
- Design 1
Electrical Rating (MWe-Net):
1150 3.
Power level to which restricted (if any) (MWe-Net):
220 4.
Reasons for restriction (if any):
THIS MONTH YRTODATE CUMULATIVE 5.
Number of hours reactor was critical 326 834 834 418 418 418 6.
Reactor reserve shutdown hours 328.1 836 2
7.
Hours generator on line 0
0 0
8.
Unit reserve shutdown hours 499,853 1,165,087 1,165,087 9.
Gross thermal energy generated (MWH) 152,610 320,680 320,680 10.
Gross electrical energy generated (MWH) 129,268 2 2,787 268,787 11.
Net electrical energy generated (MWH) 12.
Reactor Service factor NA NA NA NA NA NA 13.
Reactor availability factor 14.
Unit service factor NA NA NA NA NA NA 15.
Unit availability factor NA NA NA 16.
Unit capacity factor (Using MDC)
NA NA NA 17.
Unit capacity factor (Using Design MWe)
NA NA NA 18.
Unit forced outage rate 19.
Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
20.
If shutdown at end of report period, estimated date of startup:
21.
Units in test status (prior to commercial operation):
FORECAST ACHIEVED Initial Criticality 930320 930324 Initial Electricity 930330 930409 Commercial Operation 930801 Estimated MAY 1993 9308180165 930810
~