Rev 1 to MOR for June 1993 for Cpses,Unit 2
ML20056D857
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/30/1993
From:
TEXAS UTILITIES CO.
To:
Shared Package
ML20056D795 List:
References
NUDOCS 9308180166
Download: ML20056D857 (1)


Text

_

  1. Attachm:nt t) TXX-93292 1 Pagt 11 ef 11 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT REV.1 DOCKETNO: 50 446 UNIT: CPSES 2 DATE: August 11,1993 COMPLETED BY: Janet Hughes .

TELEPHONE: 817-897-5331 OPERATING STATUS

1. Reporting Period: JUNE 1993 Gross hours in reporting period: 220

- 2. Currently authorized power level (MWt): 3111 Max depend. capacity (MWe-Net): 1150

  • Design-Electrical Rating (MWe-Net): 1150
3. Power level to which restricted (if any) (MWe-Net): D
4. Reasons for restriction (if any):

THISMONTH YRTODATE CUMULATIVE-0 834 834

5. Number of hours reactor was critical
6. Reactor reserve shutdown hours M 1,138 1,138 0 836 836
7. Hours generator on line 0 0 0
8. Unit reserve shutdown hours 0 1,165,087 1,165,087 -
9. Gross thermal energy generated (MWH) 0 320,680 -320,680 '
10. Gross electrical energy generated (MWH) .

0 268,787 268,787

11. Net electrical energy generated (MWH)

~

12. Reactor Service factor NA NA NA
13. Reactor availability factor NA NA- NA
14. Unit service factor NA NA NA
15. . Unit availability factor NA' NA NA-
16. Unit capacity f' actor (Using MDC) NA NA NA NA. NA- NA
17. Unit capacity factor (Using Design MWe)
18. Unit forced outage rate NA NA NA
19. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):

20; if shutdown at end of report period, estimated date of startup:

21. Units in test status (prior to commercial operation): FORECAST ACHIEVED initial Criticality 930320 930324 Initial Electricity 930330 930409 Commercial Operation 930801 Estimated JUNE 1993 9308180166 930810 5 g REVISION 1 DR ADOCK 0500