Text
_
2 FLORIDA POWER & LIGHT COMPANY August 15, 1983 PflS-L1-83-551 Director, Office of Resource fianagement U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Sir:
Attached are the July,1983, Operating Status Reports and Operating Summary Reports for Turkey Point Units Nos. 3 and 4 and St. Lucie Units Nos. I and 2.
Very truly yours, I
J. W. Williams, Jr.
Vice President Nuclear Energy JWW/NWG/mpc Attachment cc: J. P. O'Reilly, Region II 50"L5[
8309080172 830815 l PDR ADOCK 05000250 R PDR PEOPLE. . SERVING *EOPLE
AVElt AGE DAILY UNIT POWER LEVEL I'
,D'OCKET NO. 50-250 UNIT Turkey Point Unit DA1E - 8/15/83 COMPLETED tty - N. W. Grant TELEPflONE "(305) 552-3675 i
MONTH July,1983 .
DAY AVERAGE DAILY POWER LEVEL~
' DAY AVER AGE DAILY POWER LEVEL IMWe Net) -(MWe-Net ) ,-
g _ 6,6_7_ _
g7 671 ,
670 665 2 18 .
669 ~
3 19 663 671 4 20 666 ..,
670 5 21 668 667 6 22 665 669 7 664 23 672
.c
' - 660 8 24 .
9 675 25 656 to 674 655 26
. 673 655
.gg 27 662 .
12 673 28 oog -
676 13 29 070 14 30 613
674 15 486 31 a 16 671 l
l INSTRUCTIONS On this formar. list the average daily unit power lesel in Mwe.yet for each day in the reporting month. Compute to the nearest whole megawait.
I .
(9/771
8 OPERATING DATA REPORT
"'mE @&-
COMPLETED IlY _N. W. Grant TELEPHONE (305) 552-3675 OPERATING STATUS
- 1. Unit Name: Turkey Point Unit 3 Notes Unit 3 operated at essentially full power
- 2. Reporting Period: .bl y , 14R'1 2200 except for a power reduction
- 3. Licensed Thermal Power (MWt): as discussed in the Unit
- 4. Nameplate Rating (Gross MWe): 760 693 Shutdown Report.
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependabic Capacity (Gross MWe): 700
- 7. Maximum Dependable Capacity (Net MWe): 666
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Level To Which Restricted,if Any (Nei MWe):
- 10. Reasons For Restrictions.If Any: __
This Month Yr to-Date Cnmulative
- 11. Hours In Reporting Period 744 5,087 93,392.6
- 12. Number Of Hours Reactor Was Critical 744.0 5,039.7 65,840
- 13. Reactor Reserve Shutdown Hours 0 ' ! 0 ' 844.4
- 14. Hours Generator On.Line 744.0 4,955.0 64,460.1
- 15. Unit Reserve Shutdown Hours 0 0 121.8
- 16. Gross Thermal Energy Ge'nerated (MWH) 1,627,091 10,866,725 .132,284,.637 '.
- 17. Gross Electrical Energy Generated (MWH) 516,160 _ 3,535,925 42,197,915
- 18. Net Electrical Energy Generated (MWH) '
491.484 3.370.028 39'.957.580 ,
- 19. Unit Service Factor 100.0 97.4 69.0 '
- 20. Unit Avalfability Factor 100.0 97.4 69 2
- 21. Unit Capacity Factor (Using MDC Net) -
99.2 101.5 66 2 '
- 22. Unit Capacity Factor (Using DER Net) 95.3 95.6 61.7.
- 23. Unit Forced Outage Rate 0 2.1 5.4'
- 24. Shutdowns Scheduled Over Next 6 Months (T3 pe.Date.and Duration of Each): '
Refueling, October,1983, 2 months
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior Io Commercial Operation): Forecast Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCI AL OPER ATION .
?
(9/77 )
h- .
s DOCKET NO. 50-250 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turkey PoinU 3 DATE 8/15/03 COMPLETED BY N. W. Grant REPORT MONTH ilul y . 1491 (305) 552-3675 TELEPHONE
-. .5? Y Licensee ,E r, feo Cause & Corrective No. Date c- jg5 H
3s j Event p7 o3 Action to
$E E j di g Report = rE C fO Prevent Recurrence d
8 830730 F 0.0 A 5 HA HTEXCH Power was reduced for repairs to the turbine cooling water heat exchanger.
The unit then returned to full power.
i 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions S. Scheduled A.Lyuipment Failure (Explain) 1-Manual for Preparation of Data
[1-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Esent Report (LER) File (NUREG-D.Regularory Restriction 9-Other (Explain) 0161)
E-Operator Trainirig & License Examination
, F-Ad ministrative p ,
5 G Opeiational Error (Fsplain) s _ / o a a 4 4 eve.;,..ct Exhibit I . Same Source (9/77) Il-Ot her ( E xplain)
SUMMARY
OF OPERATING EXPERIENCE i DOCKET NO. 50-250 Ut{IT Turkey Point 3 DATE August 15, 1983 COMPLETED BY P. L. Pace TELEPIIONE (305) 552-3654 REPORT MONTII Jul v. 1983 Unit 3 operated at essentially full power for the entire month.
Major safety related maintenance activities included:
An area radiation monitor detector was replaced.
A leak on a charging system valve weld was repaired.
The B charging pump was overhauled and all valves replaced.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company comitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
f
e AVElt AGE DAILY UNIT POWER LEVEL E'
,D'OCKET NO. 50-251 gg,7 Turkey Point Unit
- 4 DA1E _ 8/15/83 l l
COMPLETED BY - N. W. Grant TELEPilONE (305)552-3675 i
)
MONm July, 1983 .
- I DAY AVER ACE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL
- ~
IMWe Net) -'MWe Net) 665 1 37 652 665 2 g3 . 655 3 667 .- 662*
4 20 666 ,
5 379 21 665 6
664 .,) 664 007 666 7
r 675 .. 653 3 24 677 '
9 658 33 677 .657 10 ,6
~
671 660 Il 27 3 ~, 674 667 28 677 13 29 667 667 667
, 14 39 653 668 15 3 652 16 4 e INSTRUCTIONS
- On this fonnat. list the aver.ege daily unit isower lesel in MWe-Net for each day in the reporting month. Compute to the nearest whofe megawatt.
(9/77) g- --
, - - , w- w vm-y . - ~ - - - -. - - - -- e,- -
w----.-r- ,, - - --
~
OPERATING DATA REPORT DOCKET NO. 50-251 DATE 8/15/83 COMPLETED IlY F. ' W. Grant TELEPHONE (.3nn 552-3675 OPERATING STATUS
- 1. Unit Name: Turkey Point 4 -
Notes Unit 4 operated at
- 2. Reporti~ng Period:
July, 1983 essentially full power 2200 except as noted in the
- 3. Licensed Thennal Power (MWt): Unit Shutdowns and Power.
- 4. Nameplate Rating (Gross MWe): 760 Reductions Report.
- 5. Design Electrical Rating (Net MWe): 693
- 6. Maximum Dependable Capacity (Gross MWe): 700
- 7. Mninwm Depcndable Capacity (Net MWe): 666
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasons:
- 9. Power Level To Which Restricted,1f Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
. This Month Yr. to-Date . Cumulative I14 Hours In Reporting Period 744 5,087 87,120
- 12. Number Of Hours Reactor Was Critical 740.0 1,847.3 61,702.6
- 13. Reactor Reserve Shutdown Hours ~0 0*' ' 166.6
- 14. Hours Generator On-Line 736.9 1,670.1 59,566.1
- 15. Unit Reserve Shutdown Hours 0 0 31.2
- 16. Gross Thennal Energy Ge'nerated (MWH) 1.610.351 3.495.131 125.413.375 -
- 17. Gross Electrical Energy Generated (MWH) 512 ._8 6.D _ _. 1.103'.380 39.878.892
- 18. Net Electrical Energy Generated (MWH) 488,067 1,042,038 37'767,211 99.0 32.8 68.4
- 19. Unit Service Factor
- 20. Unit Availability Factor 99.0 32.8 68.4 .
- 21. Unit Capacity Factor (Using MDC Net) -
98.5 31.4 67.1 m
- 22. Unit Capacity Factor (Using DER Net) 94.7 29.6 62.6
- 23. Unit Forced Outage Rate _ _.
1.0 7.6 4.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each): "
- 25. If Shut Down At End Of Report Pes:od. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMM ERCIAL OPERATION (9/77 l
~. .
i
=se UNIT SilUTDOWNS AND POWER REDUCTIONS ey Point #4 N ME DATE 0/ D/ D3 COMPLETED BY N. W. Grant REPORT MONDI July' 1983 TELEPHONE (305) 552-3675
- E c
, !E 3i; *Y5 Lisensee E t, o Cause & Correetive No. Date H
i 3g 2s& Event g?
mO
{"3 gO Action to yE E 5e g =j Report a ue Prevent Recurrence C
12 830705 F 7.1 A 1 250-83-10 SF ACCUMU Unit removed from service as re-quired by Technical Specifications due to low pressure in accumulator.
Unit thenreturned to service. .
~
I 2 3 4 f: Forced Reason: Method: Exhibit G-Instructions S. Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 9-Other ( E-plain ) 0161) li-Operator Training & License Examination
, F-Administrative p ,
5 G-Operational Error (E xplain) c /.o ao aseve.i..# Estubit I - Same Sourec (9/77) Il-Ot her (Explain)
SUMMARY
OF OPEIU1 TING EXPERIENCE i DOCKET NO. 50-251 UNIT Turkey Point 4 DATE ,Augus_t_15. 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT liONTH July, 1983 Unit 4 operated at power except as noted in the Unit Shutdowns Report.
Other maior safety related maintenance activities included:
A boric acid heat tracing circuit was reapired.
An accumulator nitrogen vent valve was replaced.
Inspections and requirements of IE Bulletins and flVREG-0737 are continuing.
Florida Power & Light Company Commitments for fluREG-0737 implementation are continuing. Refer to correspondence between FPL and flRC for additional information.
I
, . ~
~
t AVERAGE DAILY UNIT POWER LEVEL
- - . s DOCKETNO. 50-335-
'. ugir St. Lucie Unit #1 I) ATE 8/15/83 COMPLETED liY ^Ib W. Grant ,
TELEPilONE' (305). 552-3675' -
I MONm July, 1983 .
DAY ,
AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWEk LEVEL (MWe Net) .(MWe Net) ,
I gj ..
y 3 19 4 . 20 '
6 22 y ...
,,, g s
24 9 ;25
~~
! 10 26
-~ '
.lg 37
~.
~~
12 28 _
13 29 4 34 30 -.
15 x 33 ,,
16 .
~
INSTRUCTIONS On this formai. list the average daily unit liower lesel in MWe Net.for each day in the reporting nninth'. Compute !o the nearest whole megawatt.
(9/77) '
h
.\
/
, , . , . - . . , - , , c_ _ . . _ _ . _- -. - , . . . -, ._ . - - , _ . . . . , r _ --
8 opt.RATlkG DATA REPORT -
DOCKET NO. 50-335
- DATE _.8/15/83 COMPLETED BY . fttant g7_552-3675
- s TELE!' HONE OPERATING STATUS
~ ~
N 5
~ Unit remained out of-St. _Lucie Unit 1
- l. Unit Name:
- 2. Reporti'ng Period: July. 1983 service for refueling and 2700 scheduled maintenance. .
- 3. Licensed Thennal Power (MWt):
- 4. Nameplate Rating (Gross MWe): 890 . ~
. 5. Design Electrical Rating (Net MWe)': 830 .
6.' Mcximum Dependable Capacity (Gross MWe): 867
- 7. Maximum Dependable Capacity (Net MWe): 822
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
',9. Power Level To Which Restricted,if Any (Net MWe):
10; Reasons For R.estrictions. If Any: '
.This Month Yr..to Date Cmuulative i
y iIc flours In Reporting Period 744 5.087 57.935
_ ' :12. Number Of Hours Re' actor Was Critical 0 1,366.9 44,466.1
- 13. Reactor Reserve Shutdown Hours - '
0 -
0 -
205.3
- 14. Hours Generator On-Line 0 1,350 7 43,576.2
- 15. Unit Reserve Shutdown Hours D '
0 0 39.3 *
'5 16. Gross Thermal Energy Genented (MWil) 0 3,352,422 .108,667,938 .
17, Gross Electrical Energy Generated (MWH) 0 1,1603 280 _ 35,373,875
- 18. Net EIcetrical Energy Generated (MWH)
-3,204 _, 1,086,469 _ , 33,350,660-
- D*2 '
U :ZD D l 19. Unit Senice Factor L 20. Unit Availability Factor 0 26.6 75.3 q 21. Unit Capacity Factor (Using MDC Net) -
0 26.1 73.2 *
~
~
x 22. Unit Capacity Factor ('Using DER Net) 0 25.7 71.2
- 23. Unit Forced Outa'ge Rate 0 1.1 4.6'
- 24. Shutdowns Scheduled Oser Next 6 Months (T3 pe. Date.and Duration of Each): '
-~
l 25. If Shst Down At End Of R'eport Period.Estirnated Date of Startup: October,1983 -~
, 2tu Units in Test Status (Prior to Cornmercial Operation): Forecast Achiesed ,
A a.
^ .
~
^
f INITIA L CRITICA LITY
.m
'lNITIA L ELECTRICITY . *
- COMM ERCIA L OPERATION
-}. '
(9/77I s . . ,
. , , . , . ,. - _ . _ - . - - . - ,. . ~ . - , -_. ,
~"
UNIT SHUTDOWNS AND POWER REDUCTIONS . DOCKET NO. 50-335
- UNIT NAME St. Lucie #1 DATE R/15/83 COMPLETED BY N W rsrant REPORT MONTil Julv. 1983 TELEPilONE (305) 552-3675
~'
l "*
4 ri 3 =o r .
Licensee -
5*
, s 7 .s X c v. c o Cause & Corrective No. Date g, }l @ ,g g 5 Event 57 83 Action to uhU
'I 4
,. i E 55j e ;
Report a /f '
////g)/i/?
- 19. Unit Service Factor 48.5
- 20. Unit Availability Factor 48.5 .
- 21. Unit Capacity Factor (Using MDC Net) - NA _
- 22. Unit Capacity Factor (Using DER Net) NA
- 23. Unit Forced Outage Rate 9.5
- 24. Shutdowns Scheduled Over Next 6 Months (T3 pe Date.and Duration of Each): '
- 25. If Shut Down At End Of Report Period.Estircated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY 5/27/83 o _6/2/83 INITIA L ELECTRICITY 6/83 6/13/83 COMM ERCI AL OPER ATION Late July, 1983- 8/8/83
. (9/77 )
. 1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-389 UNIT NAME St. Lucie 112 DATE 8/15/83 REPORT MONTH Jul y, 1983 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 n.
No. Date i
.$j 3g
}; [h 2 ;; a:
Licensee Event h
uy 4
- c. ?
Cause & Corrective Action to H 5 Report # rE U 0
$ j di Prevent Recurrence C
12 830622 S 298.9 B 4 HC llTEXCH Unit removed from service to clean condensate pump strainers. Outage extended to repair reactor coolant pump seal injection'. .
13 830725 S 28.0 B 3 XX XXXXXX Conducted unit trip for power ascension testing. Unit remained off line for other testin'g and maintenance.
14 830726 F 3.7 A 3 HA TURBIN Unit tripped on high steam generator level. Unit returned to service.
15 830726 F 34.1 A 3 EG INSTRU Unit trip due to loss of a power panel. Outage extended for repair of condenser tube.
16 830728 S 18.3 B 2 XX XXXXXX Unit tripped for power ascension test.
I 2 3 4 F: Forced Reason: Method: Exhibit G . Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance vi Test 2-Manua scram. Entry Sheets for Licensee C. Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction QOther (Explain) 0161) 1:-Operator Training & License Examination F Administratise
, 5 G-Operational Er ror (Fsplain) s _ / o ,,o n o w .w .cl Exhibit I . Same Source (9/77) Il-Ot her ( E xplain )
P
SUMMARY
OF OPERATING EXPERIENCE i DOCKET NO. .
50-389 _
UNIT St. Lucie Unite 2 DATE August 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH Julv 1983 Unit 2 conducted power ascension testing during the month.
See the Unit Shutdowns and Power Reductions report for details on unit outages.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
In accordance with requirements of NUREG-0737 Item II.K.3.3., there were no challenges to PORV or safety valves during the report month.
. . _ _