ML19320C573

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept PRD-80/26 Re Defective GE SB-12 Switches,Orginally Reported 800512.Rept on Applicability of 10CFR21 Will Be Submitted Upon Completion of Evaluation
ML19320C573
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 07/10/1980
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19320C574 List:
References
AECM-80-152, NUDOCS 8007170396
Download: ML19320C573 (1)


Text

"

e y a

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. D. B O X 16 4 0. J A C K S O N MI S SIS S I P PI 31: 205 NUCLEAR PRoouCDoN DEPARTMENT July 10, 1980 Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Director ,

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 I Docket Nos.. 50-416/417 )

File 0260/15525/15526  ;

PRD-80/26, Final Report, Defective i SB-12 Switches (Ref.: AECM-80/

128, June 12, 1980)

AECM-80/152 ,

On May 12, 1980, Mississippi Power & Light Company notified Mr. M. Hunt of your office of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GGNS) construction site.

The deficiency concerns GE Type SB-12 switches.

We have since determined this deficiency to be reportable with-in the meaning of 10CFR50.55(e). Details are described in the at-tached final report. We are evaluating the applicability of 10CFR21 and will submit a report upon completion.

Yours truly, W

/

[pr J. P. McGaughy, Jr. i Assistant Vice President, l

Nuclear Production l l

ATR:mt Attachment cc: Mr. N. L. Stampley Mr. Victor Stello. Directo Mr. R. B. McGehee Division of Inspection & Enforcement Mr. T. B. Conner U. S. Nuclear Regulatory Commission Washington, D.C. 20555 l

60/9 5 '

. soesiro39; .. .. . - . -

ij