Forwards Interim Deficiency Rept Re GE Failure to Provide Qualified Instrumentation in safety-related Sys
ML19320A773
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 06/13/1980
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19320A774 List:
References
AECM-80-129, NUDOCS 8007020601
Download: ML19320A773 (2)


Text

. .

l MISSISSIPPI POWER & LIGHT COMPANY  !

]

EdhhihimenE Helping Build Mississippi P. O. B OX 164 0. J AC K S O N, MIS SIS SIP PI 3 9 2 0 5 JWlli C :

nacovenou os arutur June 13, 1980 Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 3100 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Director

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 file 0260/15526 PRD-79/21, Interim Report #3 Failure to Provide Qualified Instrumentation in Safety Related Systems AECM-80/129

, On December 5, 1979, Mississippi Power & Light Company notified Mr. J. K. Rausch of your office of a potentially reportable deficiency at the Grand Gulf Nuclear Station construction site. The deficiency concerns General Electric's failure to provide seismically and environmentally qualified instruments for use in nuclear safety systems in the Balance of Plant (BOP) Power Generation Control Complex (PGCC).

We have determined that this matter constitutes a reportable condition under 10CFR50.55(e). Furthermore, we have concluded that this condition is also required to be reported under 10CFR21. This letter to you, with Interim Report Number 3 attachment and previous submittals constitutes our required reporting of this matter under both 10CFR50.55(e) and 10CFR21 for the information which is now available.

Mr. W. E. Edge of MP&L notified Mr. F. Cantrell of your office by telephone of the reportability under 10CFR21 on June 12, 1980, and confirmed 10CFR50.55(_e) time requirements apply.

A final report with corrective actions will be submitted to you by January 10, 1981.

Yours trul,, ,

f f I 1

. P. McCaug y Jr. 08 I

, Assistant Vice President j t

Nuclear Proudction WEE:lb

Attachment:

(Continued on following page)

/ 3 l

~~ l 0FFICIAL COPY mmw me S uth utmeies system r 8 0070 2 0(p0 / S

MISSISSIPPI POWER O LI7eHT CCMPANY Office of Inspection & Enforcement AECM-80/129 U. S. Nuclear Regulatory Commission Page 2

Attachment:

Interim Report #3 cc: Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner

. File Mr. Victor Stello,Jr. ,' Director (w/3 copies + attachments)

Division of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 4

4 0

S e -

4

%mm -_ #, , . . . . . . . * . w- . e a-..,. ee. - -. - 4. - -

. , <,9 ,, -

e > + - - - -.y .

9 _