Forwards Supplemental Response to NRC 791207 Telcon Re IE Insp Rept 50-416/79-21 on 790821-0907.Installation of LPCS Globe Valve F012 Checked by Bechtel Project Engineering. Installation Will Not Affect Sys Function or Operability
ML19290C257
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/19/1979
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
79-144, NUDOCS 8001100431
Download: ML19290C257 (2)


Text

-

- i MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 16 4 0. J A C K S O N, MI S S I S S I P PI 39205 PRCOUCTION OEPaRTMENY December 19, 1979 Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W., Suite 3100 Atlanta, Georgia 30303 ,'

ATTENTION: Mr. J. P. O'Reilly, Director

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station File 0260/0266/!5521 NRC Inspection Report of August 21 - September 7, 1979 Inspection - Supplemental Re-sponse AECM-79/144 .

The attached is supplemental information submitted in response tc your Mr. J. D. Wilcox's telephone request of December 7,1979.

This information supplements our response (AECM-79/138) of November 30, 1979, with regard to your IE Inspection Report for August 21 - September 7, 1979.

Yours truly, M"

L. F. Dale Nuclear Project Manager JRF/JDR:pa Attachment cc: Dr. D. C. GMs cc: Mr. N. L. Stampley Mr. R. B. McGehee Mr. A. Zaccada Mr. J. N. Ward Mr. T. B. Conner Str . R. L. Scott Mr. Victor Steilo, Jr. , Director 4 THl3 COPfir.'b. M. Lake Division of Inspection & Enforcement Mr. J. P. McGaughy, Jr.

U. S. Nuclear Regulatory Commission Mr. W. L. Sail Washington, D. C. 20555 Mr. T. E. Reaves Sr. C. K. McCoy File g(

1727 228 Member Middle South Utilities System

ATTACHMENT TO AECM-79/144 SUPPLEMENTAL INFORMATION A. NRC ltem 416/79-21-01 "LPCS Clobe Valve F012 Incorrectly Installed" Bechtel Project Engineering evaluated the installation of valves QAE12-F011A, Q1E12-F011B, Q1E21-F012 in the " normal valve position" (packing gland on downstream side of valve disc) and determined that the installation will not affect system safety function or operability. t For most LOCA operation any postulated valve stem leakage would be into the Auxiliary Building, which is served by the Standby Gas Treatment System (SGTS). The SGTS collects and processes post LOCA containment leakage to ensure 10 CFR, Part 100 dose limits are met.