ML17347A971
ML17347A971 | |
Person / Time | |
---|---|
Site: | Saint Lucie, Turkey Point, 05000000 |
Issue date: | 01/31/1989 |
From: | Bonett D, Conway W FLORIDA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
L-89-51, NUDOCS 8902230427 | |
Download: ML17347A971 (32) | |
Text
A.C CELE RATED D1SI 3t 'TI ON 7 SYH'EM DEMONSTRATE)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)
ACCESSION NBRc8902230427 FACXL:50.<<000 Generic Docket DOC DATE 8~9 ~t NOTARIZED: NO DOCKET 05000000 50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 50-335 .St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335
'50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION R BONETT,D.M. Florida Power & Light Co.
CONWAY.,W.F. Florida Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts for Jan 1989 or Turkey Point Units 3 & 4 & St.Lucie Units 1 & 2 W/89 ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Spec L)
ENCL SIZE:
NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 5 5 EDISON,G 1 0 NORRIS,J 1 -
0 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 ARM TECH ADV 2 2 NRR/DLPQ/PEB 1 1 1 1 NRR/DOEA/EAB 11 1 1
/.D /RPB 10 1 1 NUDOCS-ABSTRACT 1 1 REG FIL 01 1 1 RGN2 1 1 EXTERNAL: EG&G SIMPSON,F 1 1 EG&G WILLIAMS,S 1 1 LPDR 2 2 NRC PDR 1 1 NSIC 1 1 S
A NCTE TO ALL "RZDS" RECZPEEN1S:
PLEASE HELP US 'IO REZXJCE HASTE! CONZACZ KSE DOCUMEÃZ CXNZRtDL DESK, ROOM Pl-37 (EXT. 20079) KO EIJ2GKLTE KRR NME FRY DXSTRZK7ZZON LISTS FOR DOCUMENTS YOU DON'T NEED)
TOTAL NUMBER OF COPIES REQUIRED: LTTR 34 ENCL 31
0 1i AP AY+BE DAILY UNIT PURER LEVEL DOCKET NO. 50-250 UNIT Turkey Point S3 DATE Februar 15 1989 CONPLETED BY D. H. Bonett TELEPHONE 407 694-4432 NNTH Januar 1989 DAY AVERAGE DAILY POMER LEVEL (1 lk-Net) 1/ 1/89 -16 1/ 2/89 -18 1/ 3/89 18 1/ 4/89 -17 1/ 5/89 -16 1/ 6/89 -18 1/ 7/89 -18 1/ S/89 -18 1/ 9/89 -17 1/10/89 -17 1/11/89 -19 1/12/S9 -22 1/13/8'9 -17 1/14/89 17 1/15/89 -21 1/16/89 -18 1/17/89 -12 1/18/89 -12 1/19/89 -11 1/20/89 -10 1/21/S9 -10 1/22/89 -5 1/23/89 5 1/24/89 -5 1/25/89 5 1/26/89 -5 1/ 7/89 -15 1/28/8'9 -18.
1/29/89 -16
.1/30/89 -16 1/31/89 -18 8902230427 890131 PDR ADOCK 05000250 PDC
4l
'E
OPERATING DATA REPORT DOCKET HO 5e 25e DATE 2/ 9/89 COMPLETED BY Do M+ BOHETT TELEPHONE 407/694/4432 OPERATING STATUS 1 o UHXT HAME o TURKEY POIHT UHIT 3
- 2. REPORTIHG PERIOD t JANUARY 1989 3+ LXCEHSED THERMAl POWER (MWT): 2200 4, NAMEPLATE RATING <GROSS MWE>; 760 5+ DESIGN,ELECTRXCAL RATING (HET MWE) l 693 6i MAXXMUM DEPENDABLE CAPACITY (GROSS MWE>o 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWF>: 666 Bi IF CH*HGES OCCUR IN CAPACITY RATIHGS (ITEMS,HUMBER 3 THROUGH 7)
SXNCE LAST REPORT ~ GIVE REASONS+
POWER LEVEL TO WHICH RESTRICTED'F AHY (HET MWE) iei REASOHS FOR RESTRICTIONS'F AHY'ONTHLY
- YTD- CUMULATIVE if+ HOURS IH REPORT PERIODS 744 744 141657+6 12+ NUMBER OF HOURS REACTOR WAS CRITICAL 0+0 Oi0 93383i7 13'EACTOR RESERVE SHUTDOWN HOURS OoO OiO 844o4
- 14. HOURS GEHERATOR ON-LINE e,e OoO 92157i4
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0..0 121 i8 16+ GROSS THERMAL ENERGY GENERATED (MWH) 0 0 191193749 17'ROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 61262526 18'ET ELECTRXCAL ENERGY GENERATED (MWH) -11527 -11527 57919017 19 i UNIT SERVICE FACTOR 0+8 e,e 65+1 20 i UNXT AVAILABILITYFACTOR OiO 0+0 65' 21+ CAPACITY FACTOR <USING MDC NET) OiO e,e 62+7 22'APACITY FACTOR (USING DER NET) OiO 0 i0 59iO
- 23. UNIT FORCED OUTAGE RATE 100+0 ice,e 13+3 24, SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
- 25. XF SHUT DOWN AT EHD OF REPORT PERIOD~ ESTXMATED DATE OF STARTUPi 02/03/89
41 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNITNAME Turke Point Unit f3 COMPLETED BY D. N. Bonett REPORT MONTH Januar 1989 -<<2 Method of Shutting Licensee Cause &Corrective Down Event System Component Action to Date Type'uration (Kours) Reason~ Reactor Code4 Codes Prevent Recurrence No. Reports 12 881230 744 PIPEXX Continued ICM f1ange repairs. The outage was further extended for Emergency Diese1 Generator Preventive Maintenance and other repairs.
3 4 F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NUREG4161)
E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) 5 G - Operational Error (Explain) Exhibit1-Same Source H - Other (Explain)
DOCKET NO. '50-250 UNIT Turke Point Unit 83 DATE . Februar lg 1989 COMPLETED BY D. H., Bonett TELEPHONE 407 '94-4432 REPORT MONTH Januar 1989 See the "Unit'hutdowns and Power Reductions" sheet for Unit f3.
Cl AVIATE RAIL'Y UNIT POWER LEVEL DOCKET gp. 50-251 NIT . Turkey Point g4 DATE Februar 15 1989 CONPLETED BY D. H. Bonett TELEPHONE 407 .694-4432 NNTH .Januar 1989 DAY AVERAGE DAILY PSKR LEVEL (N Ne-Net) 1/ 1/89 0 i/ 3/89 2/89'l 0
0 il 5/89 4/89'/
0 0
1/ h/89 0 1/ 7/89 0 1/ 8/89 0 1/ 9/8'9 0 1/1'0/89 0 1/11/89 0 1/12/89 0 1/13/89 0 1/14/89 0 1/15/89 0 1/16/89 0 1/17/89 0 1/18/89 -1 1/19/89 0 1/20/89 0 1/21/S9 0 1/22/89 0 1/23/89 0 1/24/89 0 1/25/89 0 1/26/89 0 1/27/89 0 1/28/89 -1 1/29/S9 -1 1/30/89'/31/89 -1
OF'ERATIHG DATA REPORT DOCKET HO 50 251 DATE 2/ 9/89 COMPLFTED BY D. M. BQNETT TELEF'HONE 407/694/4432 OPERATXNG STATUS 1 UHIT HAME TURKEY POIHT UHIT
- 2. REPORl'ING PERIOD 7 JANUARY 1989 3+ L1CEHSED THERM*L POWER (MHT): 2200 NAMEF'LATE RATING <GROSS MWE)o 768 5i DESIGN ELECTRICAL RATING <HET MME): .. 693 6+ MAXIMUM DEF'EHDABLE CAF'ACITY (GROSS MME): 699
- 7. M*XIMUM DEPENDABLE CAF'ACITY (NET MWE): . 666 8, 1F CH*NGES OCCUR 1N CAF'ACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SIHCE LAST REPORT r GIVE REASONS+
9+. POHER LEVEL TO WHICH RESTRICTED~ IF ANY'NET MME)
'i8i REASOHS FOR RESTRICTIONS.~ IF ANY+
MOHTHLY - YTD- CUMULATIVE 11 i I-IQURS IH REF'ORT F'ERIQD: 744 744 13538'9.0 12+ H MBER OF HOURS REACTOR HAS CRITICAL 8+0 8+8 98236+6
'I,3e REACl'OR RESERVE SHUTDQHN HOURS 8i8 8.0 166+6 14 i HOURS GENERATOR QH-LINE 8i8 8<8 87194 i 1
- 15. UNIT RESERVE SHUTDOHH HOURS 8i8 8+8 32+ 1 16+ GROSS THERMAL ENERGY GENERATED (MHIR) 8 0 184082420 17 o GROSS ELECTR1CAL EHERGY GEHERATED (MHH) 0 8 58748882 I.8. NET ELECTRICAL EHERGY GENERATED (MHH) -909 -909 55582350 UNIT SL'RVXCL FACTOR 8i8 8.0 64+4
- 28. UHIT AVAILABILITYFACTOR 8+8 8+8 64i4 Zi, CAPACITY FACTOR (USlNG MDC NET) 8i8 F 8 62+9 CAPACITY FACTOR ( USING DER HET ) 8+8 8i8 59 t 2 23'NIT FORCED OUTAGE RATE 8i8 8i8 11.4 24+ SIHUTDOHHS SCHEDULED OVER NEXT 6 MONTHS
- 25. IF SHUT DOWN AT END OF REPORT PERIOD ~ ESTIMATED DATE QF STARTUF" 03/27/89
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
H COMPLETED BY D. N. Bonett REPORT MONTH nuar 1989 ~CI 69 Method of Shutting Licensee Cause 8 Corrective Down Event System Component Action to No. Date Type'uration (Hours) Reason~ Reactor Reports Code4 Codes PreventRecurrence 13 880920 744 C RC FUELXX Unit 84 remained shutdown for refueling and scheduled maintenance.
F Forced Reason Method Exhibit G- instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2- ManualScram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4 - Continued (NUREG4161)
E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other(Explain)
G - Operational Error (Explain) Exhibit1-Same Source H - Other(Explain)
il
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turkey Point. Unit f4 DATE February 15. 1989 COMPLETED 8Y D. H. Bonett TELEPHONE (407) 694-4432 REPORT MONTH Januar 1989 Unit 84 remained shutdown for. refueling and scheduled maintenance.
0 i~
I
AVOIEE DAILY"UNIT PRNER. LEVEL ~,
DOCKET NO. 50-335 UNIT St Lucie Pl DATE Februar CONPLETED BY D. N.- Bonett TELEPHONE 407 694-4432 NNTH Januar . 1989 DAY
~t)
AVERAGE DAILY (N
PNER LEVEL 1/ 1/89 872 1/ 2/89 371 1/ 3/89 869 1/ 4/89 870 1/ 5/89 873 1/ 6/89 871 1/ 7'/89 870 1/ 8/89 870 1/ 9./S9 869 1/10/89 868 1/11/89 ,867 1/12/S9 867 1/13/89 868 1/14/89 867 1/15/89 867 1/1'6/89 866 1/17/89 864 1/18/89 861 1/19/89 864 1/20/89 864 1/21/89 838 1/22/89 865 1/23/89 850 1/24/89 716 1/25/89 718 1/26/89 753 1/27/89 858 1/28/89 ,872 1/29/89 872 1/30/89 871 1/31/89 '870
4l OPERATING DATA REPORT DOCKET NQ 50 33b DATE 2/ 9/89 COMPLETED BY D+ Mi BONETT TELEPHONE 487/694/4432 OPERATING STATUS 1, UNXT NAME: ST, LUCXE UNIT 2 + REPORTXNG PERI QD + JANUARY 1 989 3+ LXCENSED THERMAL POWER (MWT)+ 2700 NAMEPLATE RATING (Gl'OSS MWE): 858 5i DESIGN ELECTRICAL RATING (NET MWE) + . 830 6+ MAXIMUM DEPEND*BLE CAPACITY (GROSS MWE): 872 7+ MAXIMUM DEPENDABLE CAPACXTY (NET MWE): 839 8i XF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SXNCE LAST REPORT r GIVE REASONS'9
. POWER LEVEL TO WHICH RESTRICTED r IF *NY (NET MWE) iei .REASONS FOR RESTRICTXONSr XF ANY+
MONTHLY - YTD- CUMULATIVE HOURS IN REPORT PERIOD i 744 744 ie620e.e 12+ NUMBER OF HOURS REACTOR WAS CRITIC*L 744iO 744+0 79842+6
- 13. REACTOR RESERVE SHUTDOWN HOURS eiO 0.0 205i3 HOURS GENERATOR ON-LINE 744+0 744+0 79123.3 15m UNIT RESERVE SHUTDOWN HOURS 0+0 ewe 39+3
- 16. GROSS THERMAL ENERGY GENFRATED (MWH) 1977328 1977328 282998515 17'ROSS ELECTRICAL ENERGY GENERATED (MWH) 667828 667828 66786415 18, NET ELECTRICAL ENERGY GENERATED (MWH) 634583 634583 63086113 19+ UNIT SERVICE FACTOR 100+0 100iO 74.5 20, UNIT AVAILABILITY.FACTOR 100iO 100' 74+5 21+ CAPACITY FACTOR (USING MDC NET) 101 i7 101+7 73+9 22'APACITY FACTOR (USXNG DER NET) ]02 8 102i8 7207
- 23. UNIT FORCED OUTAGE RATE OiO OiO 307 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 25 IF SHUT DOWN AT END OF REPORT PERIOD r ESTIMATED DATE OF STARTUP '
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNlT NAME DATE Februar 15 1989 COMPLETED SV D. N. Burnett REPORT MONTH JggQ 9 -<<>>
Method of Shutting Licensee Cause &Corrective Down Event System Component Action to Date Type'uration (Kours) Reason~ Reactor Report¹ Code4 odes Prevent Recurrence Unit fl operated at essentia11y fu11 power and had no shutdowns or significant power reductions.
F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram EntryScheetsUcensee C - Refueling 3 - Automatic Scram EventReport(LER)File D - Regulatory Restriction 4 - Continued (NUREG%161)
E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)
G - Operational Error (Explain) Exhibit1-Same Source H - Other (Explain)
II l
i
SUMMARY
OF OPERATING EXPERIENCE i
DOCKET NO. 50-335 UNIT St. Lucie Unit 81 DATE ,Februar 15. 1989 COMPLETED BY D. N. Bonett TELEPHONE (407) 694-4432 REPORT MONTH Januar 1989 St. Lucie Unit 81 operated at essentially .full power and had no shutdowns or significant, power reductions.
In accordance with requirements of Technical Specification 6.9.1.6..there were no challenges to PORV or safety valves during the report period.
0
.~
A 6E DAILY UNIT POMER LEVEL DOCKET NO.50-38g UNIT St. Lucre II2 DATE ebruar CONPLETED BY D. N. Bonett
'TELEPHONE 432 DAY AVERAGE DAILY PNER LEVEL (N We-Net) 1/ 1/89 853 1/ 2/89 838, 1/ 3/89 850 1/ 4/89 854 1/ 5/89 856 1/ 6/89 856 1/ 7/89 855
'1/ 8/89 854 1/ 9/89 851 1/10/89 852 1/il/89 852 1/12/89 853 1/13/S9 854 1/14/89 853 1/15'/89 853 1/16/89 852 1/17/89 852 1/18/89 849 1/19/89 851 1/20/$ 9 851'51 1/21/89 1/22/89 850.
1/23/89 852 1/24/89 853 1/25/89 853 1/26/89 852 1/27/89 S49 1/28/89 845 1/29/89 843 1/30/89 837 1/31/89 716
0
~ I OF'ERATXNG DATA REF'ORT DOCKET HO 58 389 DATE 2/ 9/89 COMPLETED BY Di Mi BOHETT TELEPHONE 407/694/4432 OPERATING STATUS 1
2i
+ UNIT HAME o ST+ LUCIE REPORTIHG PERIOD:
3+ LICENSED THF RMAL POHER ( MHT 4 NAMEF'I ATE RATIHG (GROSS MRE) 5i DESXGH ELECTRICAL R*TING (HET MHE)'i
'58 UHXT 2 J*NUARY 1989
):
6i MAXIMUM DEPENDABLE CAPACITY (GROSS MME) I 7+ MAXIMUM DEPEHDABLE CAPACITY (NET MME):
2780 830 882 839 8, IF CH*NGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SIHCE LAST REPORT r GIVE,REASONS+
POHER LEVEL TO WHICH RESTRXCTED IF ANY (NET MHE)-
'ei REASONS FQR RESTRICTIQHSe IF AHY'ONTHLY
- YTD- CUMULATIVE 11 HOURS IH REF'ORT PERIOD: 744 744 48897+8 12 NUMBER OF HOURS REACTOR HAS CRITXCAL 742o4 742+4 42284i4
'3 I REACTOR RESERVE SHUTDOHN HOURS eie 8 i8 0.8 14 HOURS GENERATOR ON-L1NE 742+1 742 41563.7
'5 UH1T RESERVE SHUTDOWN HOURS eie 8 i8 8+8
'6+
GROSS THERM*L ENERGY GENERATED (MHH) 2001851 2001851 108485521 i7t GROSS ELECTRICAL ENERGY GENERATED (MWH) 664180 664180 36161020 i8i NET ELECTRICAL ENERGY GENERATED ( MMH ) 629716 629716 34204689 19+ UNIT SERVICE FACTOR 99i7 99+7 86 I 4 28+ UNIT *VAILABILITY,FACTOR 99' 99+7 86+4 21+ CAPACITY FACTOR .(USING MDC NET) 188+9 188+9 86 i 8 22 I CAPACITY FACTOR ('SING DER NET) iezie iezoe 86' 23 t UHXT FORCED OUTAGE- RATE e,e e,e 517 24+ SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS +
25, IF SHUT DOWN *T EHD OF REF'ORT PERIOD ESTIMATED D*TE OF STARTUP: 04/25/89
it Ik
'P
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME DATE Feb rug r 15 1989 COMPLETED BY REPORT MONTH . Januar 1989 ~II7 69 Method of Shutting Licensee Cause & Corrective Down Event System Component Actionto Date Type'uration (Hours) Reason~ Reactor Report¹ Code4 Codes PreventRecurrence 01 890131 S 1.9 RC FUELXX Unit 82 was shutdown for refueling and scheduled maintenance.
F Forced Reason Method Exhibit G-instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4 - Continued (NUREG%161)
E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other(Explain)
G - Operational Error (Explain) Exhibit1-Same Source H - Other (Explain)
Ik 0
~l f
~
SUMMARY
OF OPERATING'EXPERIENCE
~
DOCKET NO.
UNIT St..Luc'ie"~Unit 0'2 DATE Februar 15 1989
'COMPLETED 'BY D. I1. Bonett TEL'EPHONE 407 694-4432 REPORT MONTH Januar. 1989 St. Lucie Unit 82 was shutdown for refueling and scheduled maintenance.
In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report period.
<~ ~
~~
P.O.Box14 00,Juno Beach,FL 33408-0420 FEBRUARY 1 5 1SSS L-89-51 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the January 1989 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Units 3 and 4, and St. Lucie Units 1 and 2.
Very truly yours, W. . Co y Senior V e President Nuclear WFC/DMB Attachments cc: Malcolm L. Ernst, Acting Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant an FPL Group company
0 7 1
g ~
A J 1I v
r ~