ML17345A685

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1989 for Turkey Point Units 1 & 2 & St Lucie Units 1 & 2.W/890515 Ltr
ML17345A685
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 04/30/1989
From: Bonett D, Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-89-181, NUDOCS 8905250108
Download: ML17345A685 (34)


Text

~ I REGULATORY INFORMATION DISTRIBUTION SYSTEM t(RIDS)

ACCESSION NBR: 8905250108 'DOC.DATE: 89/04/30 NOTARIZED: NO DOCKET g FACIL:50-000 Generic .Docket 05000000 50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida iPower,and Light C 05000251 50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BONETT,D.M. Florida Power & Light Co.

WOODY,C.O. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Apr 1989 for Turkey Point Units 1 & 2 & St Lucie Units. 1 & 2.W/890515 ltr.

DISTRIBUTION CODE: IE24D TITLE: Monthly Operating Report (per Tech Spec COPIES RECEIVED:LTR 2)

ENCL SIZE:

NOTES:

D RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 4 4 PD2-2 PD 1 1 EDISON,G 1 1 NORRIS,J 1 1 INTERNAL ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB NRR/DLPQ/PEB NRR/DREP RPB 10 ll 1 1

1 1

1 1

IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT 2

1 1

2 1

1

~F 1 1 RGN2 1 1 EXTERNAL EG&G S IMPSON i F 1 1 LPDR 2 2 NRC PDR 1 1 NSIC 1 1 h

D NOTE 'IO ALL "RZDS" RECZPZENIS'IZASE HELP US 'IO REDUCE WASTEl CONI'ACI'IHE DOC13MEhZ (XÃIBOL DESK BDCN Pl-37 (EXT. 20079) TO ELQGNATE YOUR NAME FROH DISTRIBUTION LISTS H)R DOCUMEMI'S YOU DGNiT NEEDt TOTAL NUMBER, OF COPIES REQUIRED: LTTR 32 ENCL 32'

a

~ t

P.O. Box14000, Juno Beach, FL 33408-0420 MAY, 1 5 19gS L-89-18 1 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the April 1989 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Units 3 and 4, and St. Lucie Units 1 and 2.

Very truly yours, C. O. Woody Acting Senior Vice President Nuclear COW/DMB Attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant S90525010S S90430 PDR ADOCK 05000250 R PDC an FPL Group company

0 w

c.<'i

AVERAGE DAILY UNIT POWER DOCKET NO. 50-250 UNIT Turke Point 3 DATE Ma 15 1989 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432'ONTH A ril 1989 DAY AVERAGE DAILY POWER LEVEL (M We-Net) 4/ 1/89 -18 4/ 2/89 -11 4/ 3/89 -10 4/ 4/89 -10

>/ 5/89 -6 4/ 6/89 -6

>/ 7/89 -6 4/ 8/89 -6 4/ 9/89 -6 4/10/89 -6 4/11/89 -6 4/12/89 -6 4/13/89 5 4/14/89 -5 4/1 5/89 4/16/89 -4 4/1 7/89 -3 4/18/89 -3 4/19/89 4/20/89'/21/89

-4

-3 4/22/89 -4 4/23/89 4/24/89 -3 4/25/89 4/26/89 -4 4/27/89'/28/89 4/29/89 -3 4/30/89 -3

QF'ERATXHG DATA REPORT DOCKET HO 50 250 DATE 5/ 9/89 COMPLETED BY D. M+ BONETT TELEPHONE 407'/694/4432 OPERATING STATUS

1. UNXT NAME+ TURKEY PO1NT UN1T 3 REPORTING PERIOD'PRIL 1989 2 ~

3i LXCEHSED THERMAL NAMEF'LATE RATXNG POWER (GROSS MWE)+'60

<MWT)i 5+ DESIGN ELECTRXCAL RATING (NET MWE) +

2200 693 6 MAXIMUM DEF'EHDABLE CAPACITY (GROSS MWE): 699'.

MAXIMUM DEPENDABLE CAF'ACITY'NET, MWE);

8. 1F CHAHGFS OCCUR XN CAF'ACXTY RATINGS (XTEMS'UMBER 3'HROUGH 7)

SIHCE LAST REPORT ~ GIUE REASONS

'+

POWER LEUEL TO WHICH RESTRICTEDr IF ANY <NET MWE) 18 REASOHS FOR RESTRICTIONS r IF AHY

'ONTHLY - YTD- CUMULATIVE 1'1 i HOURS 1H REF'ORT F'ERXOD: 719 2879 143792+6 1'2+ HUMBER OF HOURS REACTOR WAS CRITICAL e.e 123ii2 94614.8 13'EACTOR RESERVE SHUTDOWN HOURS 0.0 0~0 844i4 14 i HOURS 'GENERATOR ON-LINE 8 i8 1154i4 93311i7'21.+

15. UNIT RESERUE SHUTDOWN HOURS eie Gie 8
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 '2394853 . 193587802 17+ GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 780140 62042666
18. NET ELECTRICAL ENERGY GENERATED (MWH) -4582 721880 58652424 I9i UNIT SERVICE FACTOR Gie 48ii 64i9 28+ UNIT AUAILABILXTYFACTOR 8+0 48>1 65ie 21 i CAF'ACITY 1=ACTOR < USXNG MDC NET) Gee 37+6 62i5 22, CAPACITY FACTOR (USING DER NET). Gie 36i 2 58'
23. UNIT FORCED OUTAGE RATE 0..0 42o4. 13 t 3
24. SHUTDOWNS SCHEDULED OUER NEXT 6'ONTHS
25. 1F SHUT DOWN AT EHD OF REF'ORT PERIOD~ ESTXMATED DATE 'OF STARTUP+ 86/20/89

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME r

~515 COMPLETED BY D. M. Bonett REPORT MONTH A ri 1 1989 TELEPHONE 407 6 Method of Shutting Licensee Cause & Corrective Duration Down Event System Component Action to Date Type (Hours) Reason2 Reactor Report¹ Code4 Codes PreventRecurrence 04 890329 719. 0 ZZ ZZZZZZ Unit 3 remained shutdown to allow for RCCO Requalification Exams for Licensed Operators.

F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2- ManualScram EntryScheetsUcensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NUREG<161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain) Exhibit 1-Same Source H - Other(Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE Ma 15 1989 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 REPORT MONTH A ril 1989 Unit 3 remained shutdown to allow for RCCO Requalification Exams for Licensed Operators.

AVERAGE DAILY UNIT POWER DOCKET NO. 50-251 UNIT Turke Point 4 DATE Ma 15 1989 COMPLETED, BY D. M. Bonett TELEPHONE 407 '94-4432 MONTH A ri'1 1989 DAY AVERAGE DAILY POWER LEVEL (M'e-Net) 4/ 1/89 4/ 2/89 -p 4/ 3/89 -1 4/ 4/89 -1 4/ 5'/89 4/ 6/89 -1 4/ 7/89 -1 4/ 8/89 -1 4/ 9/89 -1 4/10/89 -1 4/li/89 -1 4/12/89 -1'1.

4/'13/89 4/14/89 -1 4/15/89 -1 4/16/89 -1 4/17'/89'/18/89

-1 4/19/89 4/20/89 -1 4/21/89 -5 4/22/89 -10 4/23/89 -12 4/24/89'/25/89

-12

-12 4/26/S9 4/27/89 -12 4/28'/89 -11 4/29/89 15 4/30/89 -16

0 OPERATING DATA REPORT DOCKET DATE

.NO'05/ 9/89 25l COMPLETED'Y Do Mo BONETT TELEF'HONE 407/694/4432 OPERATXNG STATUS 1 + UNIT NAME o TURKEY POINT UNIT

'+2+ REPORTING PERIOD 'PRXL 1989 2~ee LICENSED THERMAL POHER (MAT);

NAMEPI ATE RATXNG (GROSS MHE): 760 5i DESIGN ELECTRICAL RATING (NET MHE) ' 693 6 MAXIMUM DEF'ENDABLE CAPACITY (GROSS MME): 699 7, MAXIMUM DEPENDABLE CAPACITY <NET MWE): .666 8'F CHANGES OCCUR IN CAF'*CITY'ATINGS (ITEMS NUMBEF'. 3 THROUGH.

SINCF LAST REPORTS GIVE 7)

'REASONS'+

POWER LEVEL TO HHICH 'RESTRICTED'F, ANY (NET MME)

10. REASONS FOR RESTRICTIONS~ IF ANY+

MONTHLY - YTD- CUMULATIVE 11+ HOURS XN REPORT PERIOD+ 719 2879. 137524oe 12@ NUMBER OF HOURS 'REACTOR,'HAS CRITICAL ewe eie 9e236+6

13. REACTOR RESERVE SHUTDOWN HOURS eie ewe 166+6
14. l-lOURS GENERATOR ON-LINE ewe 0.0 87194ii l5+ UNXT RESERVE SHUTDOHN HOURS 0~0 ewe 32+1 lb'ROSS THERMAL ENERGY GENERATED (MHH) 0 0 184082420 17i GROSS ELECTRICAL ENERGY GENFRATED (MWH) 0 0 587488O2
18. NET ELECTRICAL ENERGY GENERATED (MWH) -3982 -7666 55575593 19+ UNIT SERVICE FACTOR eie eie 63o4 2e+ UNIT AV*XLA'BILITYFACTOR ewe eie 63.4 2'l+ CAF'ACXTY FACTOR <USING MDC NET) e.e eie bi+9 22, CAFACITY FACTOR <USING DER NET) eie eie 58i3
23. UNIT FORCED OUTAGE RATE eie o.e iio4 24+ SHUTDOHNS SCHEDULED OVER NEXT 6 MONTHS +

25 i XF SHUT DOWN AT END OF REF'ORT PERIOD r ESTIMATED DATE OF STARTUP i 05/18/89

Il UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 DATE lfa 15 1989 COMPLETED BY REPORT MONTH A ri 1 1989 9 -<<>>

Method of Shutting Ucensee Cause 8 Corrective Duration Down Event System Component Actionto No. Date Type (Hours) Reason~ Reactor Report¹ Code4 Codes Prevent Recurrence 13 880920 719. 0 C FUELXX Unit ¹4 remained shutdown for refueling and scheduled maintenance.

F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NUREG4161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain) Exhibit1-Same Source H - Other (Explain)

0 ~l

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNXT Turne Point 4 DATE Ma 15 1989 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 MONTH A ril 1989 Unit 4 remained shutdown for refueling and scheduled maintenance.

/P II 41

AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO'. 50-335 UNIT St. Lucie 1 DATE Ma 15'989 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 MONTH A ril 1989 DAY AVERAGE DAILY POWER LEVEL (M We-Net) 4/ 1/89 871 4/ 2'/89 872 4/ 3/89 871 4/ 4/89 871

~/ 5/89 873 4/ 6/89 873 4/ 7/89 870 4/ 8/89 871:

4/ 9/89'/10/89 871 871

-4/il/89 870 4/12/89 870 4/13/89 867 4/14/89 S64'63 4/15/89 4/ih/89 863 4/17/89 860 4/18/89'/19/89 860 858 4/20/89 856 4/21/89 857 4/22/89 848 4/23/89 766 4/24/89 864 4'/25/89 867 4/26/89 868 4/27/89 866 4/28/89 '65 4/29/89 '866 4/30/89 865

0 OPERATING DATA REF'ORT DOCKET NO b8 335 DATE 5/ 9/89 CONPLETED BY Di Ni BOHETT TELEPHONE 407/694/4432 OPERATING ST*TUS

i. UNXT HANE o ST+ LUCIE APRIL 1989 UNIT
2. REF'ORTXNG PERIOD+

3+ LICEHSED THERNAL POWER (NHT) + 2700 4+ H*NEF'LATE RATING (GROSS NWE) +

5i 6~

DESIGN ELECTRICAL R*TIHG (NET NHE)

NAXXNUN DEF'ENDABLE CAF'ACITY'GROSS NHE):

+ .830 850 872 7+ NAXINUN OEPEHDABLE CAPACITY (HET NWE) o 839

8. IF CHAHGFS OCCUR IH CAF'ACXTY RATINGS (ITENS NUNBER 3 THROUGH 7)

SINCE LAST REPORT r GXVE REASONS'+

POHER LEVEL TO WHICH RESTRICTED'F AHY (HET NWE)

18. REASONS FQR RESTRICTIONS i XF AHY i NOHTHLY "YTD- CUNULATXVE

'li ~ HOURS IN REPORT .F'ERIOD: 719 2879 188335+8 12, NUNBER OF HOURS REACTOR HAS CRITICAL 719.0 2879i8 81977i6

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 8,8 285+3
14. HOURS GENERATOR QN-LINE 719' 2879+8 81258i3
15. UHXT RESERVE SHUTDOWN HOURS 0.0 8i8 39+3
16. GROSS THERNAL ENERGY GENERATED (NHH) 1934223 7699353 208720540 17+ GROSS ELECTRIC*L ENERGY GENERATED (NMH) 652180 2596710 68715305 18, NET ELECTRXCAL ENERGY GENERATED (NHIH) 619968 2467764 64'919294 19+ UNIT SERVICE FACTOR 188+8 188 i 8 75.8 28 i UH XT A VAXLABILITYF*CTOR 188' 188<8 75+8 Zing CAF'AC1TY FACTOR (USXNG NDC NET) 182.8 182' 74+5 22+ CAPACITY FACTOR (USING DER, NET) 183i9 183' 73+3 23, UNIT FORCED OUTAGE RATE 0.0 0.0 3+6 24+ SIHUTOOHHS SCHEDULED OVER NEXT 6 NOHTHS 25'F SHUT DOWN *T EHD OF REF'ORT'ERIODS ESTXNA EO DATE OF STARTUPi

0 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME - St L c DATE Ma 15 1989 COMPLETED BY REPORT MONTH A ri I 1989 TELEPHONE Method of Shutting Ucensee Cause 8 Corrective Down Event System Component Actionto Date Type'uration (Hours) Reason2 Reactor Report¹ Code4 Code5 Prevent Recurrence Unit ¹1 operated at essentia1ly full power and had no shutdowns or significant power reductions.

F Forced Reason Method Exhibit G- instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram EntryScheetsLicensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4 - Continued (NURE84161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error(Explain) Exhibit1-Same Source H - Other (Explain)

0

SUMMARY

OF OPERATING EXPERIENCE DOCKET'O. 50-335 UNIT St. Lucie 1 DATE Ma 15 1989 COMPLETED BY D. M Bonett TELEPHONE '407 694-4432 MONTH A ril 1989 Unit 1 operated at essentially full power and had no shutdowns or significant power reductions.

In accordance with requirements of Technical Specification 6.,9.1.6, there were no challenges to PORV or safety valves during the report period.

AVERAGE 'DAILY UNIT POWER DOCKET NO. '50-389 UNIT St. Lucie 2 DATE Ma 15 1989 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4'432 MONTH A ril 1989 DAY AVERAGE DAILY POWER LEVEL (M We-Net) 4/ 1/89 -3 4/ 2/89 -3 4/ 3/89 -3 4/ 4/89 -3

>/ 5/89 -3 4/ 6/89 -3 4/ 7/89 -3 4/ 8/89 -3 4/ 9/89 -b 4/10/89 -7 4/ii/89 4/12/89 4/13/89 -7 4/14'/89 -20 4/15/89 25 4/16/89 -23 4/17/89 -7 4'/ 1'8/89 -7 4/19/89 -7 4/20/89 -10 4/21/89 -8'21 4/22/89 4/23/89 -31 4'/24/39 -30 4/25/89 27 4/26/89 -10 4/27/89 -18 4/28/89 14'5 4/29/89 4/30/89 393

OPERATING DATA REF'ORT DOCKET HO 50 389 DATE 5/ 9/89 COMPLFTED BY D. M+ BONETT TELEF'HONF 407/694/4432 OPERATING STATUS UHIT NAME+ ST+ LUCIE UNXT 2

2. REF'ORTING PERXOD i'PRIL 3+ LICENSED THERMAL POWER (MWT) +

1989 2700 NAMEF'LATE RATING (Gl'OSS MWE): 858 5> DES1GH ELECTRIC*L R*TING (HET MWE) i . 830 6 MAXIMUM DEF.'ENDABI E CAF'ACIl Y (GROSS MWE): 882 7 i MAXIMUM DEPEHD*BLE CAF'*CITY (HET MWE) + . 839 8, XF CHANGFS OCCUR 1N CAPACXTY RATINGS (ITEMS NUMBER 3 THROUCH 7)

SIHCE LAST REPORTr GIVE REASONS'OWER LEVEL TO WHICH RESTRICTED~ IF *HY (HET MWE) 18+ REASONS FOR RESTRICTIONS ~ IF AHY i MONTHLY - YTD- CUMULATIVE 11+ HOURS XN REPORT PERIODS 719 2879 58232 i 8 12 ~ NUMBER OF. HOURS REACTOR WAS CRITIC*L 99i9 842' 42384.3

13. REACTOR RESERVE SHUTDOWN HOURS 8i8 0.0 8i8 14+ HOURS GEHERATOR ON-LINE 46' 789 i,8 41618+6 l5. UNlT RESLRVE,SHUTDOWN HOURS 0.0 0,.0 8i8 lb. GROSS THERMAL,ENERGY GEHERATED (MWH) 49992 2049385 108533055 17+ GROSS EL'ECTRICAL ENERGY GENER*TED (MWH) 14660 678840 36175680 l8. NET ELECTRICAL ENERGY GENER*TED (MWH) 4367 628856 34203749 19 i UNIT SLRVICE FACTOR 6i5 27 ' 82,8
28. UNIT A VAILABXLITYFACTOR 6+5 27i4 82+8 Zi i CAF'ACITY FACTOR (USING MDC NFT) 8i7 26' 83.0 22'APACITY, FACTOR (USING DER NET) 0+7 26.3 82i9
23. UNXT FORCED OUTAGE RATE 8o8 8,8 aJ t7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MOHTHS 25 IF SHUT DOWN AT END OF REF'ORT PERIOD ESTIMATED D*TE OF STARTUP:

II ~I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-38 UNlTNAME St. Lucie ¹2 DATE . Ha 15 1989 COMPLETEDBy D. N. Bonett REPORT MONTH A r il 1989 Method of Shutting Ucensee Cause & Corrective Down Event System Component Action to Date Type'uration (Hours) Reason~ Reactor Report¹ Code4 Code5 Prevent Recurrence 01 890131 662.9 RC FUELXX Unit ¹2 remained shutdown for refueling and scheduled maintenance.

02 890428 0.0 HA TUR8 IN While returning to full power from refueling outage, the unit was held at 25K for physics test and reduced power to perform turbine overspeed trip test.

03 890429 8.2 HA TURBIN Performed overspeed trip test as part of power ascension program.

04 890430 0.0 HA TURBIN Unit was held at 50K power for physics test.

F Forced Reason Method Exhibit G- instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2- ManualScram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4 - Continued (NUREG4161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain) Exhibit1-Same Source H - Other (Explain)

41

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-389 UNIT St. Lucie 2 DATE Ma 15 1989 COMPLETED BY D M. Bonett TELEPHONE 407 694-4432 MONTH A ril 1989 See the "Unit Shutdowns and Power Reductions" for Unit 2.

In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report period.

1 4