Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K9681999-10-19019 October 1999 Ack Receipt of Transmitting Rev 40 to Physical Security Plan for Washington Nuclear Plant 2.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML20206U4501999-05-19019 May 1999 Ack Receipt of Which Transmitted Rev 39 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required,Since Changes Do Not Decrease Effectiveness of Security Plan ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule ML20196K6961999-03-30030 March 1999 Ack Receipt of ,Transmitting Rev 38 to Physical Security Plan for Plant.No NRC Approval Is Required,In Accordance with 10CFR50.54(p) GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML20204F0261999-03-19019 March 1999 Forwards Insp Rept 50-397/99-01 on 990201-04 & 0303-05.No Violations Noted.Areas of Physical Security Plan Effectively Implemented with Listed Exceptions ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML17292B5991999-03-16016 March 1999 Informs That Listed Property & Liability Insurance Coverage for WNP-2 Is in Force,In Compliance with Licensing Responsibilities Delineated in 10CFR50.54(w)(3) ML17292B5911999-03-16016 March 1999 Forwards 1998 Environ Operating Rept, Per Reporting Requirements of Section 5.4.1 of WNP-2 Epp.No Design or Operational Changes or Tests in 1998 Involved Unreviewed Environ Question ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5901999-03-11011 March 1999 Forwards Hard Copy of Addl Occupational Exposure Data Requested in GL 94-04,per 990303 e-mail.Original Electronic Version Was Corrupted ML17292B5681999-03-0101 March 1999 Forwards Radioactive Effluent Release Rept for 1998, IAW 10CFR50.36a(a)(2) & TS 5.6.3 & Complete Copy of WNP-2 ODCM Per TS 5.5.1 ML17292B5651999-02-22022 February 1999 Forwards Relief Request 2ISI-20,proposing Alternate Exam Expected to Reduce Dose Significantly & Still Provide Adequate Safety & Quality.Attached Relief Request Will Be Used to Support ALARA Dose Reduction Efforts During Maint ML17292B5581999-02-0404 February 1999 Requests Change to Co Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier C/As.Change Requested to Reflect That Final Implementation of C/As Will Be Completed During Fall 1999 Not Spring 1999 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML17286A2801990-08-27027 August 1990 Forwards fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d) ML17286A2671990-08-23023 August 1990 Provides Info on Steps Taken to Minimize Potential Effects of NRC Maint Insp Interface Record, Form on Candor of Supply Sys Personnel When Talking W/Nrc Inspectors ML17286A2641990-08-20020 August 1990 Advises That Tech Spec Rev Re ATWS Recirculation Pump Trip Will Be Submitted by 900928,per Discussions W/ P Eng & H Lee ML17285B4341990-08-20020 August 1990 Withdraws 900302 Request for Amend to Tech Spec 3.8.1.1, AC Sources Reducing Excessive Testing of Diesel Generators. IR 05000397/19900141990-08-10010 August 1990 Provides Info Re Final Assessment of Causes & Corrective Actions Associated W/Recent 25 Kv iso-phase Bus Electrical Fault Incident,Per Request in Cover Ltr to Insp Rept 50-397/90-14.Plant Procedure 10.25.141 Will Be Revised ML17285B4171990-08-10010 August 1990 Provides Info Re Final Assessment of Causes & Corrective Actions Associated W/Recent 25 Kv iso-phase Bus Electrical Fault Incident,Per Request in Cover Ltr to Insp Rept 50-397/90-14.Plant Procedure 10.25.141 Will Be Revised ML17285B4041990-08-0202 August 1990 Submits Justification for Continued Operation W/Emergency Diesel Generator 2 Shorted Turns ML17285B3981990-07-30030 July 1990 Advises That Installation of Detector Check Valve in Fire Protection Underground Piping Sys Complete,Per 890911 Ltr. Sys Monitors for Underground Sys Leakage Over Entire Fire Protection Sys ML17285B3991990-07-27027 July 1990 Forwards Justification for Continued Operation Re Emergency Diesel Generator 2 Shorted Turns.Justification Concludes That Diesel Generator Capable of Supporting Present Operability Requirements of Tech Specs ML17285B3711990-07-12012 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Confirms That Items 1,2,3,4 & 5 of Requested Actions of Operating Reactors Completed ML17285B3761990-07-12012 July 1990 Discusses Potential for Surface Entry & Mining Near Plant Sites.Concludes That NRC Need Not Consider Issue as One Requiring Continued Monitoring ML17285B3781990-07-11011 July 1990 Requests Waiver of Compliance from Tech Spec 3.8.1.2 Re Ac Sources - Shutdown.Waiver Will Allow Performance of Rotor Pole Ac Voltage Drop Test to Provide Confirmation That for Extended Run Degradation Condition Will Not Occur ML17285B3841990-07-10010 July 1990 Forwards Util 1990 Emergency Exercise Scenario.W/O Encl ML17285B3661990-07-0505 July 1990 Advises of Listed Organizational & Personnel Changes, Effective 900707.J Burn Will Be New Director of Projects, C Powers Promoted to Director of Engineering & J Baker Promoted to Plant Manager ML17285B3641990-06-29029 June 1990 Advises That All Equipment Identified W/Atws Safety Function Acceptable from Environ Qualification Standpoint. ATWS Equipment Has Been Determined to Be Qualified to Normal Design Environ Conditions Followed by ATWS Accident Environ ML17285B3571990-06-28028 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. ML20055D2391990-06-28028 June 1990 Forwards Response to Re Violations Noted in Insp Rept 50-397/90-12.Response Withheld (Ref 10CFR73.21) ML17285B3501990-06-22022 June 1990 Advises That Mods to Recirculation Pump Trip Sys Implemented During 1990 Spring Refueling Outage.Remaining ATWS Items to Be Resolved as Listed ML17285B3511990-06-20020 June 1990 Forwards WPPSS-FTS-129, BWR Transient Analysis Model, for Review & Approval ML17285B3441990-06-20020 June 1990 Advises That Util Intends to Utilize R-value of 0.13% Delta K/K in Cycle 6 Implementing Procedures.Should R-value Change in Final Startup & Operations Rept,Changed Value Shall Be Used Instead ML17285B3451990-06-19019 June 1990 Forwards Rev 10 to EPIP 13.1.1, Classifying Emergency. Rev Includes New Format of Matrix Charts Intended to Improve Identification of Symptomatic & situation-based Emergency Conditions ML17285B3431990-06-18018 June 1990 Advises of Appointment of AL Oxsen to Position of Deputy Managing Director,Effective 900601 ML17285B3461990-06-15015 June 1990 Responds to NRC Evaluation Findings of Licensed Operator Requalification Program.Quality of Written Exam & Job Performance Measure Question Bank Testing Matls Will Be Improved to Meet Std Prior to Next Program Evaluation Cycle ML17285B3301990-06-12012 June 1990 Forwards Warrant for $50,000 in Response to Order Imposing Civil Monetary Penalty Dtd 900521 ML17285B3251990-06-0707 June 1990 Advises That Calculated Max Control Room Temp Re Station Blackout Will Be Provided by 900701 ML17285B2931990-05-29029 May 1990 Responds to NRC 900426 Ltr Re Violations Noted in Insp Rept 50-397/90-09.Validity of Violation Challenged.Opposes Issuance of Severity Level IV Violation Based on Listed Reasons ML17285B2861990-05-22022 May 1990 Advises That Submittal of Improved Tech Spec Scheduled for Mar 1991 & Implementation Tenatively Scheduled for Oct 1991 ML17285B2881990-05-11011 May 1990 Forwards Engineering Std EES-4,Rev 0, Setpoint Methodology, as Committed in Util 900329 Ltr.W/O Encl ML17285B2471990-05-0101 May 1990 Advises That No Changes to Tech Specs Required as Stated in 891130 Ltr in Response to Generic Ltr 89-21 Requesting Plant Status on Implementation of USI Re ATWS ML17285B2741990-04-26026 April 1990 Advises That Util Has No Comments on Licensed Operator Annual Requalification Exam During Wks of 900226 & 0305.All Comments Resolved When Exams Administered ML17285B2321990-04-25025 April 1990 Submits Revised Scheduled Completion Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-17 ML17285B2121990-04-19019 April 1990 Responds to Fire Protection Issues Identified in 900201 Notice of Violation.Corrective Actions:Major Hardware Changes Implemented & Independent Consultant Will Be Employed to Review Fire Protection Program ML17285B2221990-04-16016 April 1990 Forwards Status Rept for Commitments Made in 891130 Ltr Re commercial-grade Dedication Process.Resolution of 10 Samples Identified by NRC & 50 Samples Identified by Cynga Completed ML17285B1881990-04-11011 April 1990 Responds to NRC 900312 Ltr Re Violations Noted in Insp Rept 50-397/90-01.Corrective Actions:Complete Job & Task Analysis Completed for Health Physics Technician Training Program & New Program Will Include Training on Fundamentals ML17285B1821990-04-0505 April 1990 Requests Exemption from Filing Requirements of 10CFR55.45(b)(2)(iii) & (IV) to Allow Delayed Submittal of NRC Form-474, Simulation Facility Certification & to Administer Simulation Test as Upgraded,Respectively ML17285B1741990-04-0505 April 1990 Advises That NRC Approved Use of Final Feedwater Temp Reduction in Amend 77 to License NPF-21 ML20012F6141990-04-0404 April 1990 Forwards Rev 17 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) ML17285B2041990-03-29029 March 1990 Requests Review of Encl Topical Rept WPPSS-FTS-127,Rev 0, Qualification of Core Physics Methods for BWR Design & Analysis. Upon Rept Approval,Tech Spec Changes (Per Generic Ltr 88-16) Scheduled for Jan 1992 ML17285B1421990-03-29029 March 1990 Forwards Revised Schedule for Plant Equipment Setpoint Methodology Program Plan.Methodology Revised to Incorporate Latest ISA Std Draft.Setpoint Program Design Team for FY90 Onsite,Trained & Began Work on 900312 ML17285B1381990-03-29029 March 1990 Forwards Concluding Rept of Results Requested by Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety- Related Equipment. Air Quality Testing Performed to Date Reveals Steadily Improving Results ML17285B1131990-03-28028 March 1990 Advises of Release of Subchannel Thermal Hydraulic Computer Code & Requests Review of VIPRE-01 Mod-02 & Issuance of SER for PWR & BWR Applications.Bwr Qualification Analyses Completed & Rept on BWR Applications Encl ML17285B1331990-03-23023 March 1990 Responds to NRC 900221 Ltr Re Violations Noted in Insp Rept 50-397/89-40.Corrective Actions:Plant Procedure 10.25.63, Emergency Lighting Insp in Process of Being Expanded to Provide Instructions & Check Sheets to Ensure Uniform Insps ML17285B1311990-03-21021 March 1990 Forwards Proposed Bases Change Re 891129 Request for Amend to Tech Spec Table 4.3.6.1, Srm/Irm Detector Not-Full-In Functional Test. Bases Change Describes Special Circumstances Re Test Exception ML17285B1291990-03-19019 March 1990 Responds to Generic Ltr 89-19 Re Resolution of USI A-47 on Safety Implications of Control Sys in LWRs & Generic Ltr 89-21 Re Status of Implementation of Usis.Tech Specs Adequate to Verify Operability of Overfill Protection Sys ML17285B1171990-03-19019 March 1990 Suppls 900102 Response Re Implementation of fitness-for-duty Program at Facility.All Items Identified as Incomplete as of 900103 Completed at End of Jan 1990 ML17285B1121990-03-15015 March 1990 Provides Level of Property & Liability Insurance Coverage for Facility,Per 10CFR50.54(w)(2) Annual Requirement ML17285B0931990-03-0202 March 1990 Forwards Supplementary Info Re 900214 Application for Amend to License NPF-21,revising Tech Spec 3.3.7.5 to Address Failed Safety/Relief Valve Position Indicators ML17285B0741990-03-0202 March 1990 Responds to NRC 900201 Ltr Re Violations Noted in Insp Rept 50-397/89-30.Corrective Action:Plant Personnel Currently in Process of Making Improvements to Plant Operations Procedure Writers Guide ML17285B0861990-03-0101 March 1990 Forwards Compilation of Responses to Regulatory Impact Survey Questionnaire,Per Generic Ltr 90-01 ML17285B0581990-02-26026 February 1990 Forwards Washington Nuclear Plant-2 Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989 & Amend 7 to Odcm. 1990-08-27
[Table view] |
Text
~
AC CELZRATED DISI'RIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:8810240175 DOC.DATE: 88/10/07 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION MARTIN,J.B. Region 5, Ofc of the Director
SUBJECT:
. Provides updated schedule of commitments re completion of fire protection issues,per Insp Rept 50-397/88-16.
DISTRIBUTION CODE: IEOID COPIES RECEIVED: LTR ~ ENCL / SIZE: /~
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
RECIPIENT COPIES RECIPIENT COPIES
ID CODE/NAME LTTR ENCL 'ID CODE/NAME LTTR ENCL PD5 PD 1 1 SAMWORTH,R 1 1 1' INTERNAL: ACRS 2 2 AEOD 1 1 DEDRO NRR/DLPQ/PEB NRR/DOEA DIR 11 ll 1 1
1 1
1 1
NRR MORISSEAU,D NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 1
1 1
1 1
1 NRR/DREP/RPB 10 2 2 NRR/DRIS DIR 9A 1 1 NRR/PMAS/ILRB12 1 1 NUDOCS-ABSTRACT .1 1 H LI N,J 1 1 OGC/HDS2 1 1 REG ILE 02 1 1 RES/DSR DEPY 1 1 N FILE 01 1 1 ERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 A
NCTE TO ALL RIDS" RECIPIEPlS:
PLEASE HELP US 10 REDUCE %MDDE! CON'XACP %HE DOCUMEWZ CXKZROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATE YOUR MNE FBCH DISTRIKlTION LISTS PDR DOCUMEXIS KRJ DONiT NEED)
TOTAL NUMBER OF COPIES REQUIRED: LTTR . 24 ENCL 24
WASHINGTON PUBLIC POWER SUPPLY SYSTEM F.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 October 7, 1988 G02-88-214 Docket No. 397 Mr J. B. Martin Regional Administrator r i U.S. Nuclear Regulatory Commission ~,,)
Region V 1450 Maria Lane, Suite 210 ~ ~
Walnut Creek, CA 94596
Dear Mr. Martin:
Subject:
NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21 SCHEDULE FOR COMPLETION OF FIRE PROTECTION ISSUES (INSPECTION REPORT 88-16)
Reference:
- 1) Letter, G02-88-156, CM Powers (SS) to JB Martin (NRC), same subject, dated July 15, 1988
- 2) NRC Inspection Report No. 50-397/88-16, dated July 25, 1988
- 3) Letter, G02-88-168, GC Sorensen (SS) to NRC "Inspection Report 87-19, item 29 Instrument Rack
~
Terminations", dated July 29, 1988 In Reference 1) the Supply System provided a schedule for completion of the remaining open items identified during the Fire Protection Audit held June 6-10, 1988. Shortly thereafter NRC Inspection Report No. 50-397/88-16 (IR 88-16) was issued which contains additional clarification of the NRC's under-standing of the Supply System's commitments. In the cover letter to IR 88-16, the NRC also made comments regarding the Supply System's failure to achieve adequate corrective actions with regard to fire barrier protection of certain safe shutdown trains, as well as the appropriateness of the Supply System's position regarding high/low pressure interface valves. The purpose of this letter is to provide an updated schedule of the commitments made in Reference 1), as well as to address the other concerns expressed in IR 88-16, even though no response is required.
8810240175 881007 PDR ADOCK 05000897 0 PDC
Page Two SCHEDULE FOR COMPLETION OF FIRE PROTECTION ISSUES (INSPECTION REPORT 88-16)-
SCHEDULE UPDATE Issue 87-19-07/08 DG Floodin & Common Yiode Failure Open Item 3.N in IR 88-16 Installation of the scuppers on the south doors leading outside the D/G building and raising the curbs to seven inches for the north doors leading into the D/G corridor will be completed by August 1, 1988 (complete).
The modifications necessary to provide diversion of the water outside the D/G building will be implemented by July 1, 1989 (on schedule).
Interim action to divert the water outside of the D/G building will be taken by August 15, 1988 (complete).
For the purpose of calculating the flooding potential of the HPCS Diesel Generator Room (Calculation No. 05.51.55), the Supply System will assume that all 28 sprinkler heads installed in the HPCS Diesel Generator Room could be actuated by fire.
2, Issue 87-19-29 Instrument Rack Terminations Open Item 3.N in IR 88-16 .
A revised NOV response will be submitted by July 29, 1988 (complete, see G02-88-168, dated July 29, 1988)
In the future, termi nations which are greater than 45 degrees will be replaced when determinated during surveillance or modifications. The appropriate procedure has been deviated to reflect this commitment (complete - PPM 10.25. 19).
The procedure which is used as the guidance for new terminations or repairs will be revised by March 15, 1989 (on schedule).
The Supply System has performed an in depth evaluation and determined that an additional inspection does not need to be performed to verify the integrity of the terminations (see Reference 3).
- 3. NRR Ouestion 4 of 28 Sensin Line Su orts Open Item 2.D.4 in IR 88-16 The calculation verification will be completed by
~
July 15, 1988 (complete',
see G02-88-155, dated July 15, 1988).
The installation of the thermolag and the bolt change-out will be com-pleted by December 1, 1989 (on schedule).
Page Three SCHEDULE FOR COMPLETION OF FIRE PROTECTION ISSUES (INSPECTION REPORT 88-16)
- 4. NRR Ouestion 5 of 28 Bio-Shield Wall Penetrations Open Item 2.E.5 in IR 88-16 He will revise the Fire Protection Controls procedure and Fire Hatch Training program by September 1, 1988. The change will identify the concern regarding ignition of the foam and provide guidance aimed at prevention of a fire in this area (complete - PPN 1.3.35).
We will submit a revised response to question 5 of our January 11, 1988 letter by October 28, 1988 to address the NRC concerns identified during the subject audit.
- 5. NRR guestion 15 of 28 (50.59 Review of Fire Protection Modifications)
Not Addressed in IR 88-16 The changes to the Fire Protection Program 'made in association with Amend-ment 38 to the FSAR have been reviewed and determined to be in compliance with the intent of the interim agreement, dated January 29, 1987 between NRR and the Supply System, as it relates to License Condition 2.C.( 14),
pending staff approval of Amendment 37.
The changes contemplated in Amendment. 39, as well as others determined to be necessary prior to approval of Amendment 37 and subsequent removal of the license condition, will be the subject of future discussions between NRR and the Supply System staff. We expect these discussions to be ini-tiated by July 22, 1988 (complete, per Supply System/NRC telecon on July 22, 1988 and follow-up letter G02-88-183, dated August 23, 1988).
- 6. Issue 86-25-03 Fire Hain Under the D/G Buildin Open Item 3.C. 2 in IR 88-16 We have supplied the documentation that NRR has requested and are awaiting their response. He are prepared to discuss and resolve this issue at the staff's earliest possible convenience.
The Supply System has recently completed additional analyses using nationally r ecognized methods. These analyses are currently under dis-cussion with the Staff.
Page Four SCHEDULE FOR COMPLETION OF FIRE PROTECTION ISSUES (INSPECTION REPORT 88-16)
- 7. Issue 86-25-08 and NRR (}uestion 25 of 28 (RHR-V-9 Thermola and Hi h Im cdance Fault Anal sis A. Item 4.A. (1) in IR 88-16 (Violation 88-16-01)
Installation of the RHR-Y-9 thermolag wi 1'1 be complete by August 12, 1988 (complete).
Section F.4 of the FSAR will be revised to describe protection for high/low pressure interface valves. The methodology to be described in the FSAR would apply to all high/low pressure interface valves.
The Supply System has evaluated all other similar valves to assure that this methodology was appropriately applied. The valves evalua-ted are listed on F.4-11. Except for RHR-V-8/V-9, all others already meet the Generic Letter 86-10 guidelines.
Me will plan to resubmit the answer to guestion 25 by September 30, 1988 to address the NRC concerns identified during the subject audit.
(Complete See G02-88-209, dated September 30, 1988).
B. Item 4.A.(2) in IR 88-16 (Violation 88-16-02)
The results of the Appendix' calculation regarding high impedance faults during a fire related .shutdown has resulted in a requirement to shed loads from the Division 2, 125 VDC battery.
The loads which need to be shed have been identifi,ed by Engineering and evaluated by the Operations Department. The procedure has been deviated, and the manual actions verified (PPM 4. 12.1.1).
The executive summary requested by the Inspection team will be sub-mitted by July 15, 1988 (complete, see G02-88-157, dated July 15, 1988)
- 8. LER 87-29 (88-08) Fire Seals Open Item 3.P in IR 88-16 The walkdown of Tech. Spec. fire seals, as committed to in LER 88-08, has been completed. A reconciliation between the prints and PSTS (Penetration Seal Tracking System) and the PSTS users manual will be in place by August 31, 1988. (The reconciliation was completed on schedule and signed off September 1, 1988. A control procedur e (EI2.24) has been approved and issued in place of a "user's manual.")
Page Five SCHEDULE FOR COMPLETION OF FIRE PROTECTION ISSUES (INSPECTION REPORT 88-16)
In the inspection report (IR 88-16), at the top of page 24, a statement is made regarding retraining of plant personnel involved in the inspection of the. seals. It should be clarified that the training that the Supply System had referred to in this regard was that committed to in LER 87-029.
In there, the Supply System said that training will be provided on fire-rated penetration requirements to Plant Technical Engineers, Plant Main-tenance Engineers, Plant gC Inspectors, Plant Craft and Contr actor Field Engineers.
The PMR review discussed in the same paragraph has been completed and the appr opriate actions taken.
9 LER 87-30 Missin 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> Fire Wall Open Item 3.() in IR 88-16 Thermolag will be applied to the wall to provide a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> fire rating.
The structural steel will then be provided with a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> fire rating. The work will be completed by December 22, 1988 (on schedule).
- 10. IE Notice 86-106, Su lement 2 Open Item 3.T in IR 88-16 All issues are resolved with the exception of the affect of fire suppres-sion water on security systems. The evaluation of this issue will be complete by January 2, 1989 (on schedule).
Issue 86-05-06 20 Foot Combustible Free Zone Items 3.L 8 5 in IR 88-16: Ysolation 88-16-04)
The 20 foot combustible free zone has been walked down and all trays which encroach the zone have been identified and included in the scope of an MWR to perform the necessary work. The thermolag work associated with the identified deficiencies will be completed by September 14, 1988 (Complete).
The above zone, originally intended to be temporarily marked, has been permanently marked instead.
In addition to the thermolag work, the covered trays inside the 20 foot zone will be labeled and the zone will be posted in a manner to identify it as a combustible free zone. This work will be completed by September 30, 1988 (Complete).
Page Six SCHEDULE FOR COMPLETION OF FIRE PROTECTION ISSUES (INSPECTION REPORT 88-16)
- 12. Re ulator Guide 1.75 - Electrical Se aration in the Remote Shutdown Panel Open Item 4.8 in IR 88-16: Item 88-16-03 Modification has been completed (see. NCR 88-228 and PMR 88-186).
CONCERNS REGARDING CORRECTIVE ACTION ADE UACY The Supply System shares your concerns in this matter. With respect to pre-viously identified discrepancies, the following clarifications are offered by way of explanation.
In mid-1986 the inspection of the Cable Spread Room 20 foot Exclusion Zone and one hour protection for safe shutdown cables was performed to'n earlier inspection criteria. The design data used for these inspections also contained an error. Since the NRC inspection of June 1988, the Cable Spread Room has been totally reinspected to the criteria developed for one hour ar eas and the 20'ombustible free zone, o With respect to the protection of power cables for the high/low pressure interface - valve RHR-V-9. the Supply System does not and did not believe that this was a credible event, but nevertheless agreed to add additional thermolag in the interest of r esolving the issue.
o With respect to the few isolated instances of missing thermolag, the Supply System has heightened the awareness of the appropriate personnel through informal individual/group discussions, as well as re-emphasizing the procedural aspects.
o As an additional step, the 20 foot exclusion zone as well as individual trays have been permanently marked. Nearly everything within the zone that is not concrete or steel is being covered with thermolag, except a few building fixtures and assemblies for which acceptable substitutes are not available (i.e., emergency lights, exit signs, portable fire extinguisher hose, tygon tubing for the Fire Protection System drain, etc.).
Page Seven SCHEDULE FOR COMPLETION OF FIRE PROTECTION ISSUES (INSPECTION REPORT 88-16)
HIGH/LOW PRESSURE INTERFACE CONCERNS The Supply System believes that the NRC's comments regarding the appropriate-ness of the Supply System's actions with respect to RHR-V-8/V-9 leaves the wrong impression, and we will take this opportunity to provide some clarifi-cation in this matter.
The Supply System has never believed that this issue involved an NRC "requirement" per se, but rather a staff interpretation of "guidance" on high/low pressure interface valves contained in generic letter 86-10, As is customary and an accepted practice, the Supply System was attempting to negotiate a realistic approach to what we consider to be a non-credible event.
As indicated by the attached chronology and the following discussion, the Supply System has made every reasonable effort to resolve this issue in a timely manner. (Chronology previously submitted with G02-88-002 dated 1/5/88).
This submittal updates that Chronology.
The subject of power removal from high/low pressure interface valves was first brought up by the Staff in early 1986. The Supply System agreed to remove power from RHR-V-123A/B, but advised the Staff that we did not agree that removal of power from either RHR-V-8 or V-9 was either necessary or safe. We believe such power removal to be contrary to the health and safety of the public, and was addressed in great detail in numerous letters and te'lephone conversations with the Staff.
The NRC, in June 1986, recommended an acceptable alternative to removing power (refer to Item 12 in the Attachment), i.e., revise appropriate annunciator response procedures to utilize remote shutdown transfer switches to prevent simultaneous opening of valves RHR-V-8 and V-9 during a control room fire. The Supply System was led to believe that this would resolve the issue to the NRC's satisfaction. However, in October 1986 the NRC reopened the issue with no reference to the June agreements (refer to Item 15 in the Attachment). In December 1986 the Supply System reconfirmed the unacceptability of power removal. During an NRC exit interview in April, 1987 NRR assumed responsi-bility from Region V for resolution of the issue.
The NRC, in the May 13, 1987 letter to the Supply System, requested a schedule for completion of "appropriate modifications" to the RHR valves. At this point the Supply System had to date been unable to obtain an evaluation of the technical positions presented to the NRC. Plant Management directed the Technical Staff to evaluate modification options for review and approval. The Supply System committed to provide a "preferred. option" to the NRC by mid-August (Refer to Docket Letter G02-87-232).. The NRC responded on October 2, 1987 suggesting that they may not approve these modifications, but requested that the Supply System submit the proposal along with an appropriate unreviewed safety questio'n determination and Technical Specification revisions. The Supply System submitted the proposal in Docket Letter G02-88-002 ( Item 24 in the Attachment).
Page Eight SCHEDULE FOR COMPLETION OF FIRE PROTECTION ISSUES (INSPECTION REPORT 88-16)
Following a meeting with the NRC on January 19, 1988 where the NRC provided an additional requirement for a keylocked switch, the Supply System submitted an amended proposal which included the switch ( Item 26). The NRC subsequently approved this design and the associated Technical Specification change.
Based on the above summary; the Supply System believes that our actions were timely, appropriate and repr esent a significant effort on our part.
ADDITIONAL GLAR IF ICATIONS Under Item 2.BB in IR 88-16, the Staff indicated that "The licensee plans to incorporate manual WMC-064 and the NFPA code deviations in the April 13, 1987 letter, into- Amendment No. 39 to the FSAR". We will clarify that this will be done by reference when the fire protection section is rewritten subsequent to approval of Amendment No. 37.
T he Supply System is extremely pleased with the progress that was made as a result of the subject fire protection audit. Nearly all of the outstanding items are either closed or soon will be, and we view this pr ogress as a signi-ficant improvement in the Supply System's overall efforts.
Very truly yo rs, G. C. So ensen, Manager Regulatory Progr ams HLA/bk Attachment cc: Document Control Desk - NRC NS Reynolds - BCPER RB Samworth - NRC DL Williams - BPA/399 NRC Site Inspector - 901A
ATTACHMENT Page 1 of,6 RHR-V-'8 8 V-9 CHRONOLOGY OF EVENTS
- 1. JUNE, 1983 - AMENDMENT NO. 31 TO HNP-2 FSAR In l}-040.079 the NRC required compliance with BTP RSB 5-1 to preclude a LOCA thru the Hi/Low Pressure Interface. It states in part:
"These two motor operated valves and their associated cable may be subject to a single fire hazard."
In the Supply System's response, the acceptability of RHR-Y-8 and V-9 was specifically addressed. ~
This amendment was reviewed and accepted by the NRC with no conditions attached to our license, nor were there any additional questions and/or concerns identified in the SER or its supplements.
- 2. MAY 10, 1984 - LICENSEE EVENT REPORT 84-031 Notification -of physical wiring problems and thermolagging/fire barriers associated with Safe Shutdown (SSD) path. No concerns were raised regarding Hi/Low Pressure Interface valves. Identified a cable that provides an isolation signal to RHR-Y-123A that was not protected.
- 3. June 7, 1985, Letter to GC Sorensen from DF Kirsch (NRC Region,V),
"Nonconformance of Safe Shutdown Equipment ,to Appendix R Require-ments." Referred to LER 84-031 and requested further information regarding deficiencies found with respect to SSD in the event of a Control Room Fire. Requested response within 10 days, did not speci-fically address any valves.
- 4. June 17, 1985, Letter to DF Kirsch from GC Sorensen. Response to NRC Region V request (item 3 above), included description of seven defi-ciencies as well as proposed resolution (Attachment A).
1 Deficienc (No. 7 in letter)
In the Control Room, the physical separation between the control switches for two series high-to-low pressure system interface valves (RHR-V-53A and RHR-V-123A) is not sufficient to preclude hot shorts from opening both valves simultaneously and failing the low pressure safe shutdown system during a Control Room fire.
ATTACHMENT Page 2 of 6 Pro osed Resolution:
One of the two series valve control circuits will be routed to a transfer switch located in the Remote Shutdown Room allowing isola-tion. Operation of this transfer switch will be specified in the Main Control Room evacuation procedure.
March 14, 1986, Letter to GC Sorensen from DF Kirsch (NRC Region V).
NRC prepared and issued an SER relative to the nonconformance issue identified in references 3 and 4 above.
"As indicated in the enclosed SER, the NRR staff has found the Supply System's proposed resolutions to be acceptable with the proviso that the transfer switch to be located outside the control room (see Defi-ciency 7, Reference 2) normall'y should be set in the "isolate" posi-tion. We suggest that you obtain verification that the Supply System accepts and will implement this proviso."
Item seven deals with the potential opening of the high/low RHR pressure interface due to a control room fire generating an open signal to both valves RHR-V-53A and RHR-V-123A which are in series.
As an interim measure, the licensee must remove power from one of these valves, such as by opening the breaker to the valve. Although this is an acceptable means to resolve the high/low pressure interface problem the licensee has proposed installing a transfer switch outside of the control room in order to isolate one valve from the'ontrol room in the event of a fire in the control room. This is acceptable provided that the transfer switch is maintained normally in the "iso-late from the control room" position. Pending acceptance of this interim measure, the interim measures and corrective actions are acceptable."
A ril 4, 1986 NRC Re ion V Ins ection Re ort No. 86-05 Item 4.4.2 (page 8) of this report indicated that the Licensee had determined that three sets of RHR system valves need analysis and protection. The NRR (Region Y) stated that RHR-V-53A and 123A should be de-energized.
"Several potential candidates were identified and discussed with the licensee. The licensee was able to resolve all concerns with the
. additional valves emphasis added .
ATTACHMENT Page 3 of 6 April 24, 1986 Generic Letter 86-10 issued. This GL was surrounded by controversy and confusion as evidenced by the workshops that were held around the country prior to its issuance.
The Staff's present position with regard to RHR-V-8 and V-9 appears to be based solely on an interpretation of this generic letter.
May 23, 1986, Letter to GC Sorensen from EG Adensam, "HNP-2 Fire Protection - Request for Additional Information" tionn.
NRR requires further signal/spurious automatic function loss evalua-June ll, 1986 meeting with NRC in Bethesda to discuss NRC's request for additional in formati on. First indication that there may be valves, other than those noted in the April 4, 1986 inspection report, 'of concern to NRR.
June 30, 1986; Letter, G02-86-613, GC Sorensen to EG Adensam, "WNP-2 Fire Protection Program - Request for Additional Information".
Response to 12 questions from NRC (nothing related directly to RHR-V-8/V-9).
Supply System reiterates single failure analysis approach (question 5).
June 1986 During this month the Supply System had numerous telephone conversa-tions with John Ridgley in which we specifically discuss RHR-V-8 and V-9 and our technical and licensing bases for not being required to remove power. Mr. Ridgley suggested that changing the annunciator response procedure would resolve the issue. Procedures were revised.
July 16, 1986, Letter, G02-86-656, GC Sorensen to EG Adensam, "Fina'1 Resolution of Hi/Low Pressure Interface Concern" This is in response to NRC's SER dated March 14, 1986. This appears to be first formal indication that multiple spurious actuations must be considered with respect to Hi/Low Pressure Interface Valves.
August 1986 - NRC Region V Inspection 86-25 dated December 29, 1986.
RHR valve position noted as an open item, deferred to NRR for resolu-tion.
ATTACHMENT Page 4 of 6
- 14. Due to direct interaction with representatives from NRR and Region V
. at the August 1986 inspection exit meeting a 'etter committing to remove power, as suggested by the NRR representative, was drafted.
Simultaneously, a hurried change was made to the FSAR (Amendment 37),
which contained an error in referring to power removal as the preferred approach. During the review of the draft response, safety ramifications'not previously recognized were identified that required us to reconsider removing power from RHR-V-B.
A decision was made to continue to interact with the staff to reconcile or obtain satisfactory justification for modifying the RHR-V-8 design.
- 15. October 20, 1986, Letter EG Adensam to GC Sor ensen "Request for Addi-tional Information" In item 7, Hi/Low Pressure Interface in RHR System the NRC requested:
a) Document your comm tment to remove power from the RHR-V-8 valve during non-shutdown operating conditions.
b) Document your commitment to remove the power from the RHR-V-123A and RHR-V-123B valves either at the valve or at the MCC.
c) Provide a schedule and justification for the schedule to imple-ment items a) and b) above.
- 16. December 1, 1986, Letter, G02-86-1049, GC Sorensen to EG Adensam "HNP-2 Fire Protection, Request for Additional Information",
o Removed power from RHR-V-123A 8 Y-123B o Reconfirmed position contained in our response of July 16, 1986 (i.e. do not intend to remove power). Provided additional tech-nical and regulation based justification.
- 17. April 7, 1987 NRC Region Y Inspection Report 87-02 (participants included Adensam, Ridgley, Campe, Hulman, et al).
Item 2.G - Hi/Low Pressure Interface Analysis specifically addressed RHR-V-8 and V-9.
Per EG Adensam, NRR,assumed responsibility to resolve regulatory con-flicts and provide specific direction addressing those conflicts.
ATTACHMENT Page 5 of 6
- 18. May 13, 1987, Letter G Knighton to GC Sorensen, "Compliance with Requirements of Appendix R to 10CFR50 Regarding Prevention of LOCAS at Hi/Low Pressure Interfaces."
"He (NRC) are advising you that we require WPPSS to implement appro-pr iate modifications to these isolation valves (RHR-V-8 and V-9) as soon as practical...."
Further ask'ed us to advise of planned modifications to ensure isola-tion as well as schedule for completion.
- 19. June 3, 1987, Letter, G02-87-190, GC Sorensen to NRC, "Response to Generic Letter 86-10 Interpretation of Hi/Low Pressure Interface Concerns." t
'upply System committed to provide preferred option by mid-August 20 August 20, 1987, Letter, G02-87-232, GC Sorensen to NRC, "Resolution of Generic Letter 86-10 Hi/Low Interface Concern" Identified providing a transfer switch on the remote shutdown panel for the RHR-V-8 valve as the prefer red method. Also identified bypassing the RHR permi ssi ve interl ock as an unreviewed safety question, and pointed out the need for a T/S change to Table 3.3.2-1.
- 21. October 2, 1987, Letter, Gll Knighton to GS Sorensen, "NNP-2 Proposed Resolution of Spur ious Opening of RHR-V-8 and RHR-V-9 in the Event of a* Control Room Fire."
Acknowledged our preferred action to provide a transfer switch on the remote shutdown panel and to have control of RHR-Y-8 transferred to the remote panel during normal operation.
- 22. October 9, 1987, Information Notice No. 87-50 "Potential LOCA at High-and-Low-Pressure Interfaces from Fire Damage."
The Supply System was totally surprised by the Information Notice issuance and is preparing a response to address the inaccuracies contained therein.
- 23. December 23, 1987, Letter Gl< Knighton to GC Sorensen, "NRC Review and Approval of RHR-V-8/RHR-V-9 Resolution (TAC ¹ 63528)."
Encouraged early submittal of our proposal so as not to impact restart after refueling.
ATTACHMENT Page 6 of 6
- 24. January 5, 1988, Letter, G02-88-002, GC Sorensen to NRC, "Request for Technical Specification Amendment, Table 3.3.2-1 Isolation Actuation Instrumentation" Submitted Tech. Spec. change to accommodate transfer of control of RHR-V-8 to the .Alternate Remote Shutdown Panel during normal opera-tion. Resultant bypassing of the interlocks determined to be unreviewed safety questions
- 25. January 19, 1988, meeting with NRC in Bethesda. Purpose of meeting was to discuss certain NRC staff concerns regarding inadvertent opening of RHR-V-8 when transferred with the interlocks bypassed.
- 26. February 12, 1988, Letter, G02-88-037, GC Sorensen to NRC, "Request for Technical Specification Amendment, Table 3.3.2-1, Isolation Actuation Instrumentation (Additional Contr ols)."
- 1. Supply System agrees to operate with the transfer switch placed in the "emergency" position.
- 2. The bypassing of the automatic isolation signals is discussed.
- 3. The installation of a key lock switch to prevent inadver tent operation of the valve is agreed to.
- 27. March 15, 1988, Letter, G02-88-059, GC Sorensen to NRC, "Request for Technical Specification Amendment Table 3.3.2-1, Isolation Actuation Instrumentation (Additional Clarification)."
Made editorial changes to previous submittal.
- 28. May 26, 1988, NRC issues Amendment No. 58 to WNP-2 Technical Specifi-cations thereby approving request for amendment.
.,4I.&
6 ~ ~~.iZ" e DISPOSITION OF INCOMING MAIL C ~ CC C ~ OO4C f eoc cc ~ 0 ~ 8 . COPY RETAINED FOR REGION V CENTRAL FILES C ~OC CR' lkO'C'C.:0 ~ 0OCQ ( ) COPY NOT RETAINED FOR REGION V CENTRAL FILES:
c'ee'e'~ ace. 0eC'x. IF YOU%ANT COPY OF DOCUMENT RETAINED IN REGION V CENTRAL FILES, PLEASE ASSURE THAT OC O'84O0 6 ORIGINAL OR COPY, AS APPROPRIATE, IS SENT TO THE REGION V FILE AND RECORDS CLERK.
( ) ENCLOSURE NOT COPIED FOR REGION V CENTRAL FILES - TO%VOLUMINOUS. RETURN ORIGINAL OR COPY, AS APPROPRIATE, TO FILE AND RECORDS CLERK.
( ) REPLY REQUIRED: AFFIX FORM NRC 3265, MAIL AND CONTROL FORM, .AND FORNRD AS APPROPRIATE.
REMARKS:
NOTE: REGION V CENTRAL FILE ROOM IS NOT DCS.
THIS DOCUMENT COMPLETED AND AFFIXED BY REGION V MAIL ROOM PERSONNEL.
I yl.