Forwards Rev 2 to Pump & Valve Inservice Test Program Plan & 21 Oversize Drawings
ML17277B078
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/04/1983
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17277B080 List:
References
GO2-83-1024, NUDOCS 8311300333
Download: ML17277B078 (4)


Text

REGULATORY I RMATION DISTRIBUTION SYS1 (RIDS)

'ACCESSION. NBR:8311300333 DOC DATE: 83/11/04 NOTARIZED: NO DOCKET FACIL:50 397 BYNAME NPPSS Nuclear Pr ojecti Unit 2i Nashington Public Powe 05000397 AUTH AUTHOR AFFILIATION SORENSENiG,C. Hashington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION SCHNENCERiA, Licensing Branch 2

SUBJECT:

Forwards Rev 2 to pump & valve inservice test program plan

& 21 oversize drawings. ~PS'-~%3 DISTRIBUTION CODE: 0001 COPIES ECEIVED:LTR ENCL SIZE:S.

TITLE: Licensing Submittal: PSAR/FSAR Amdts & Related Correspondence BOOTES: ~% C~+WWW~

REC IP IENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR'NCL NRR/DL/ADL. 1 0 NRR LB2 BC 1' NRR LB2 LA 1 0 AULUCKgR ~ 01 1 1 INTERNAL: ELD/HDS2 1 0 IE F ILE 1 1 IE/DEPER/EPB 36 3 3 IE/DEPER/IRB 35 1 1 IE/DEQA/GAB 21 1 1 NRR/DE/AEAB 1 0 NRR/DE/CEB NRR/DE/EQB NRR/DE/MEB 11 13 18 2

1 1

2 1

NRR/DE/EHEB NRR/DF/GB NRR/DE/MTEB 17

'8 1 2

1 1

2 1

NRR/DE/SAB 20 1 1 NRR/DE/SGEB 25 1 1 NRR/DHF S/HF EBrl 0 1 NRR/DHFS/LQB 32 1 1 NRR/DHF S/PSRB 1 1 NRR/DL/SSPB 1 0 NRR/DS I /AEB 26 1 I NRR/DS I ASB 1 1 NRR/DSI/CPB 10 1 1 NRR/DSI/CSB 09 1 1 NRR/DSI/ICSB 16 1 NRR/DS I/METB 12 1 1 NRR/DSl/PSB 19 1 1 NRR D AB 22 1 NRR/DS I/RSB 23 1 1 0rl 1 RGN5 3 3 MIB 1 0 EXTERNAL: ACRS rl ] 6 6 BNL(AMDTS ONLY) "1 1 DMS/DSS ('AMDTS) 1 1 FEMA"REP DIV 39 1 1 LPDR 03 1 1 NRC PDR 02 1 NSIC 05 1 1 NTIS '

1 TOTAL NUMBER OF COPIES REQUIREDe LTTR 53 ENCL 46

W It e "I W

,I y ~II r

tl 44 ij 44 4, I ttl Wtl 1 It

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 November 4, 1983 G02-83-1024 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Schwencer:

Subject:

NUCLEAR PROJECT NO. 2 PUMP AND VALVE INSERVICE TEST PROGRAM PLAN UPDATE The Supply System has recently revised the WNP-2 Pump and Valve Inservice Test (PVT) Program Plan. This revision (Revision 2) of the program plan incorporates the latest design and as-built information available as of October 25, 1983 and thus provides added assurance of material quality and public safety. The Supply System has been informed that neither the original version nor revision 1 to the PVT Program Plan has been reviewed by the NRC.

The Supply System, therefore, respectful.ly requests that revision 2 of the WNP-2 PVT Program Plan be reviewed and approved for imple-mentation in conjunction with the issuance of the WNP-2 operating license.

Enclosed for NRC review and approval are sixty (60) copies of Revision 2 of the WNP-2 PVT Program Plan and seven (7) copies of full-size blue lines of each applicable drawing.

Should you have any further questions, please contact Mr. P. L. Powell, Manager, WNP-2 Licensing.

Very truly yours, G. C. orensen, Manager Regulatory Programs pl@

'g4 RPW/tmh ~

Attachments cc: R Auluck - NRC

~QUAL WS Chin - BPA AD Toth - NRC Site Ai>

J Page - NRC

,.<~,:-, BSlXSO0SSS

,'['-",'DR Sslloe ~

l ADOCK 05000397

"..*;~ PDR

I

'I C

I v'

~

V 1