NRR E-mail Capture - NRC Acceptance Review for LAR #317 Regarding Changes in Managment Titles
ML15176A269
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/25/2015
From: Michael Orenak
Plant Licensing Branch IV
To: Rose P
Duke Energy Corp
References
TAC MF6235
Download: ML15176A269 (2)


Text

NRR-PMDAPEm Resource From: Orenak, Michael Sent: Thursday, June 25, 2015 8:51 AM To: Rose, Philip (Philip.Rose@duke-energy.com)

Cc: White, Frostie Ann (Frostie.White@duke-energy.com)

Subject:

NRC Acceptance Review for LAR #317 Regarding Changes in Managment Titles

Phil, By letter dated May 7, 2015, Duke Energy Florida, Inc. submitted a license amendment request for Crystal River Unit 3 (ADAMS Accession No. ML15134A160; TAC No. MF6366) to update the Improved Technical Specifications ITS Administrative Controls Sections 5.1.1, 5.2.1.b, 5.3.2, and 5.6.2.3 by changing the title of the position with overall responsibility for the safe handling and storage of nuclear fuel and licensee initiated changes to the Offsite Dose Calculation Manual from either the 'Plant Manager' or the 'Decommissioning Director' to the 'General Manager Decommissioning.' The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Michael Orenak Crystal River and Waterford Project Manager NRR - Division of Operating Reactor Licensing Phone: 301-415-3229 e-mail: Michael.Orenak@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 2175 Mail Envelope Properties (Michael.Orenak@nrc.gov20150625085100)

Subject:

NRC Acceptance Review for LAR #317 Regarding Changes in Managment Titles Sent Date: 6/25/2015 8:51:10 AM Received Date: 6/25/2015 8:51:00 AM From: Orenak, Michael Created By: Michael.Orenak@nrc.gov Recipients:

"White, Frostie Ann (Frostie.White@duke-energy.com)" <Frostie.White@duke-energy.com>

Tracking Status: None "Rose, Philip (Philip.Rose@duke-energy.com)" <Philip.Rose@duke-energy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2179 6/25/2015 8:51:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: