| Quarter | Site | Title |
---|
05000461/FIN-2018050-03 | 2018Q2 | Clinton | Equipment Operator Rounds Points Inadequate Acceptance Criteria |
05000461/FIN-2018050-02 | 2018Q2 | Clinton | Failure to Promptly Identifya Condition Adverse to Quality |
05000461/FIN-2018050-01 | 2018Q2 | Clinton | Failure to Follow Multiple Procedure |
05000397/FIN-2017008-01 | 2017Q1 | Columbia | Operators Fail To Follow Reactor Scram Procedure |
05000397/FIN-2016009-01 | 2017Q1 | Columbia | Shipment of a Type B Quantity of Radioactive Material in a Type A Package |
05000397/FIN-2016009-06 | 2017Q1 | Columbia | Failure to Update the Final Safety Analysis Report with Changes to Radioactive Waste Processing |
05000397/FIN-2016009-09 | 2017Q1 | Columbia | Failure to Minimize Void Spaces in a Radioactive Waste Package |
05000397/FIN-2016009-02 | 2017Q1 | Columbia | Failure to Conduct Adequate Surveys of a Solid Radwaste Shipment |
05000397/FIN-2016009-07 | 2017Q1 | Columbia | Failure to Follow Procedure and Perform a Root Cause Evaluation to Assess the Causes of a Radwaste Shipping Event |
05000397/FIN-2016009-04 | 2017Q1 | Columbia | Failure to Provide an Accurate Shipping Manifest |