Letter Sequence Request |
---|
|
|
MONTHYEARML20129H7091985-05-28028 May 1985 Forwards Request for Addl Info Re Response to Generic Ltr 83-28, Generic Implications of Salem ATWS Events, Concerning Position on post-maint Operability Testing of safety-related Components.Response Requested within 45 Days Project stage: RAI ML20129J4871985-07-19019 July 1985 Provides Addl Response to Generic Ltr 83-28 Re Required Actions Based on Generic Implications of Salem ATWS Events, in Response to NRC 850528 & 0626 Ltrs.Operating Experience Program Developed Per NUREG-0737,Item I.C.5 Project stage: Other IR 05000344/19850161985-07-19019 July 1985 Insp Rept 50-344/85-16 on 850514-0701.Violation noted:4 of 12 Spent Fuel Pool Racks Not Verified by Signature as Having Second Set of Rack Feet Properly Installed Project stage: Request ML20136C6401985-12-20020 December 1985 Forwards Draft SER Re Tech Spec Changes & Draft Transmittal Ltr to Licensee.Proposed Amend to License NPF-1 Approved. SALP Input Also Encl Project stage: Draft Approval ML20214C2661986-02-12012 February 1986 Forwards SER Based on Review of Util 831104,850719 & 1017 Submittals in Response to Generic Ltr 83-28,Items 3.2.1 & 3.2.2 Re Implications of Salem ATWS Event.Response Acceptable Project stage: Approval ML20214C6381986-02-12012 February 1986 Safety Evaluation Re Util Submittals on Generic Implications of Salem ATWS Event (Generic Ltr 83-28),Items 3.2.1 & 3.2.2. Response Acceptable Project stage: Approval 1985-05-28
[Table View] |
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification IR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245L1471989-08-0303 August 1989 Insp Rept 50-344/89-12 on 890522-0601.Violations Noted.Major Areas Inspected:Review of Licensee NDE Procedures,Nde Records,Radiographs & QA Documentation & NRC NDE Personnel Reperformed Sample NDE on Safety Related Sys & Components ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 1999-09-09
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification IR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245L1471989-08-0303 August 1989 Insp Rept 50-344/89-12 on 890522-0601.Violations Noted.Major Areas Inspected:Review of Licensee NDE Procedures,Nde Records,Radiographs & QA Documentation & NRC NDE Personnel Reperformed Sample NDE on Safety Related Sys & Components ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 1999-09-09
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification IR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245L1471989-08-0303 August 1989 Insp Rept 50-344/89-12 on 890522-0601.Violations Noted.Major Areas Inspected:Review of Licensee NDE Procedures,Nde Records,Radiographs & QA Documentation & NRC NDE Personnel Reperformed Sample NDE on Safety Related Sys & Components ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 1999-09-09
[Table view] Category:UTILITY
MONTHYEARIR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 IR 05000344/19890161989-06-28028 June 1989 Insp Rept 50-344/89-16 on 890514-0617.Unresolved Item Noted Re Appropriate Level of Review Necessary for Lower Tier Procedures.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Refueling Activities ML20245E6811989-06-0505 June 1989 Insp Rept 50-344/89-10 on 890326-0513.Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Event Followup & Open Item Followup ML20245D5851989-06-0202 June 1989 Insp Rept 50-344/89-14 on 890508-12.Violations Noted. Major Areas Inspected:Occupational Exposure During Extended Outage & in-office Review of Licensee Records IR 05000344/19890111989-05-30030 May 1989 Mgt Meeting Rept 50-344/89-11 on 890413.SALP Results for Dec 1987 - Dec 1988 Reviewed & Recent Plant Transient & Activities in Fire Protection & Outage Mgt Discussed IR 05000344/19890151989-05-26026 May 1989 Enforcement Conference Rept 50-344/89-15 on 890510.Major Areas Discussed:Concerns Identified in Security Team Insp Rept 50-344/89-02,Chemistry Team Insp Rept 50-344/89-07 & Special Insp Rept 50-344/89-13 IR 05000344/19890071989-05-23023 May 1989 Insp Rept 50-344/89-07 on 890417-21.No Violations Noted. Major Areas Inspected:Plant Chemistry Related Areas, Including Organization & Mgt,Qa Training & Qualifications, Water Chemistry Control & Analysis & Facilities IR 05000344/19890131989-05-19019 May 1989 Insp Rept 50-344/89-13 on 890409-29.Violations Noted.Major Areas Inspected:Licensee Activities Re Failure of Permissive & Interlock Features for RHR Sys Shutdown Cooling Suction Isolation Valve ML20246D8961989-04-19019 April 1989 Insp Rept 50-344/89-05 on 890212-0325.Violations Noted.Major Areas Inspected:Safety Verification,Maint,Surveillance,Event Followup,Design Engineering & Open Item Followup IR 05000344/19890061989-04-18018 April 1989 Insp Rept 50-344/89-06 on 890320-24.No Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings,Review of Lers,Followup on IE Info Notices,Mgt & Organization,Training & Qualification & Facility Tours IR 05000344/19890041989-03-23023 March 1989 Insp Rept 50-344/89-04 on 890228-0303.Violations Noted. Major Areas Inspected:Follow Up on Two Open Items & One Unresolved Item Identified During Previous Emergency Preparedness Insps & Emergency Preparedness Program ML20247G2151989-03-13013 March 1989 Insp Rept 50-344/89-01 on 890101-0211.Violations Noted.Major Areas Insepcted:Operational Safety Verification,Maint, Surveillance,Event Followup & Followup on Previously Identified Items IR 05000344/19890031989-02-10010 February 1989 Enforcement Conference/Mgt Meeting Rept 50-344/89-03 on 890126.Major Areas Discussed:Nrc Concerns Developed as Result of Insp of Commercial Grade Procurement,Per Insp Rept 50-344/88-46 & Licensee Efforts in Areas of QA Program IR 05000344/19880401988-11-0303 November 1988 Insp Rept 50-344/88-40 on 880807-1001.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19880441988-10-25025 October 1988 Mgt Meeting Insp Rept 50-344/88-44 on 881004.Major Areas Discussed:Concerns Developed as Result of Sept 1988 Reactor Trip & Subsequent Forced Outage Activities ML20154P6391988-09-16016 September 1988 Insp Rept 50-344/88-36 on 880808-12.Deviation Noted.Major Areas Inspected:Licensee Conformance to Reg Guide 1.97,Rev 3 ML20154N8951988-08-31031 August 1988 Insp Rept 50-344/88-39 on 880808-12.One Unresolved Item on Purchase & Use of Commercial Grade Items in safety-related Sys Identified.Major Areas Inspected:Commercial Grade Procurement & Pipe Support Design Verification IR 05000344/19880291988-08-31031 August 1988 Insp Rept 50-344/88-29 on 880619-0730.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Maint,Surveillance,Event Follow Up & Open Item Follow Up IR 05000344/19880311988-08-23023 August 1988 Insp Rept 50-344/88-31 on 880718-22.No Violations or Deviations Noted.Major Areas Inspected:Unresolved, Enforcement & Followup Items ML20151T4361988-07-29029 July 1988 Insp Rept 50-344/88-27 on 880627-0701.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Chemistry Controls,Control of Radioactive Matls & Contamination,External Exposure Control & Internal Exposure IR 05000344/19880261988-07-28028 July 1988 Insp Rept 50-344/88-26 on 880606-10 & 14-17.Violations Noted.Major Areas Inspected:Commercial Grade Procurement & Inservice Insp Activities IR 05000344/19880281988-07-25025 July 1988 Insp Rept 50-344/88-28 on 880711-15.No Violations or Deviations Noted.Major Areas Inspected:Followup on Previous Insp Findings,Review of Emergency Facilities,Equipment, Instrumentation & Supplies & Exam of Training Program IR 05000344/19880321988-07-25025 July 1988 Insp Rept 50-344/88-32 on 880711-15.No Violations Noted. Major Areas Inspected:Followup of Open Items & Written Repts of Nonroutine Events ML20151K5411988-07-12012 July 1988 Insp Rept 50-344/88-24 on 880508-0618.Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Event Follow Up & Open Item Follow Up IR 05000344/19880231988-06-30030 June 1988 Insp Rept 50-344/88-23 on 880510-26.No Violations or Deviations Noted.Major Areas Inspected:Specs for Emergency Operating Procedures IR 05000344/19880251988-06-16016 June 1988 Insp Rept 50-344/88-25 on 880516-31.No Violations Noted. Major Areas Inspected:Licensee Activities in Resolving Reactor Plant Pipe Whip Restraint Design Vs as-built Gap Discrepancies & Inservice Insp Ultrasonic Test Activities IR 05000344/19880201988-06-10010 June 1988 Insp Rept 50-344/88-20 on 880516-20.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings & Occupational Exposure During Extended Outages IR 05000344/19880151988-05-25025 May 1988 Insp Rept 50-344/88-15 on 880425-29.No Violations Noted. Major Areas Inspected:Evaluation of Design Bases of Diesel Generators,Review of Tests & Experiments Program & Review of QA Program of Measuring & Test Equipment IR 05000344/19880171988-05-23023 May 1988 Insp Rept 50-344/88-17 on 880418-21.Violation Noted.Major Areas Inspected:Licensee Fire Protection Program Implementation & Action on Previous NRC Insp Findings IR 05000344/19880181988-05-18018 May 1988 Insp Rept 50-344/88-18 on 880425-29.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Activities & Insp Procedures 30703,73051,37052,73753 & 73755 IR 05000344/19880211988-05-13013 May 1988 Mgt Meeting Rept 50-344/88-21 on 880422.Major Areas Reviewed:Salp Results for 861101-871130 & Discussion of Recently Developed Issues on Containment Isolation Valves IR 05000344/19880111988-04-27027 April 1988 Insp Rept 50-344/88-11 on 880329-31 & 0404-05.No Noncompliance Noted.Major Areas Inspected:Plant Water Chemistry Control & Chemical Analysis,Qa of Plant Chemistry Activities,Radiochemical Analysis & post-accident Sampling IR 05000344/19880121988-04-21021 April 1988 Mgt Meeting Rept 50-344/88-12 on 880325.Areas Discussed: Procedure & Maint Improvement,Outage Activities & Barton Pressure Transmitter Troubleshooting IR 05000344/19880101988-04-0707 April 1988 Insp Rept 50-344/88-10 on 880314-18.No Violations or Deviations Noted.Major Areas Inspected:Annual Review of Licensee Program to Handle Info Notices,Review of Procedures & Onsite Followup of Written Repts of non-routine Events ML20151C4741988-03-28028 March 1988 Insp Rept 50-344/88-04 on 880208-12 & 0229-0304.No Violation Noted.Major Areas Inspected:Licensee Action on Previous Findings,Organization & Mgt,Training & Qualifications,Solid Wastes,Transportation & Facility Tours IR 05000344/19880061988-03-0909 March 1988 Insp Rept 50-344/88-06 on 880222-26.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training & Followup Items & Followup Items of Noncompliance 1990-09-05
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site ML20202C2111999-01-21021 January 1999 Notice of Violation from Insp on 971207-10.Violation Noted: Licensee Did Not Perform Survey to Assure Compliance with 10CFR20.1902(d) IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning ML20199F0291998-01-15015 January 1998 Notice of Violation from Insp on 971201-03.Violation Noted: Licensee Failed to Ensure Adequate Survey of Certain Contaminated Tools IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl ML20210S7131997-09-0909 September 1997 Notice of Violation from Insp on 970721-24.Violation Noted: from 960923-970515,licensee Failed to Conduct Surveys Adequate to Evaluate Quantity of Radioactive Matl Released from Radiological Controlled Area IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program ML20135B7491997-02-25025 February 1997 Notice of Violation from Insp on 970204-06.Violation Noted: Licensee Had Not Audited Annual Radiological Environmental Report TS 6.9.1.5.1 Since 890519 IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept ML20059A1421993-12-15015 December 1993 Notice of Violation from Insp on 930930-1112.Violation Noted:Detailed Construction Package 1 Associated W/Request for Design Change 78-103,installed in May 1980,did Not Correctly Translate Design Basis Into Applicable Procedures IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items PNO-V-93-002, on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased1993-01-13013 January 1993 PNO-V-93-002:on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items ML20127E9461993-01-0808 January 1993 Notice of Violation from Insp on 921027-1207.Violation Noted:Licensees Corrective Actions Not Effective in That,On 921112 & 15,access Doors to Plant Issue Warehouse Not Controlled by Authorized Personnel PNO-V-93-001, on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media1993-01-0404 January 1993 PNO-V-93-001:on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification PNO-V-92-038, on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety1992-12-0808 December 1992 PNO-V-92-038:on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety PNO-V-92-037, on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart1992-12-0101 December 1992 PNO-V-92-037:on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart ML20126E9101992-11-25025 November 1992 Notice of Violation from Insp on 920915-1026.Violation Noted:Supervisor Informed of Receipt of a Nonconforming Component,Chlorine Detector & Did Not Initiate an Ncr ML20126E9131992-11-25025 November 1992 Notice of Deviation from Insp on 920915-1026.Deviation Noted:Containment Air Locks Not Tested Using Pressure Decay Method IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities PNO-V-92-004, on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 9202271992-02-25025 February 1992 PNO-V-92-004:on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 920227 IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification PNO-V-91-002, on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable1991-03-0505 March 1991 PNO-V-91-002:on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable ML20062F9301990-11-0808 November 1990 Notice of Violation from Insp on 900902-1006.Violation Noted:Temp of Train B Component Cooling Water Pump (ASME Code Class 3 Pump) Taken W/Instrument W/Scale More than Three Times Ref Value of Bearing Temp PNO-V-90-045, State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference1990-11-0707 November 1990 PNO-V-90-045:State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference 1999-09-09
[Table view] |
Inspection Report - Trojan - 1985016 |
---|
|
|
Text
{{#Wiki_filter:r ,..
- -
s -,
.
g U. S. NUCLEAR REGULATORY COMMISSION
REGION V
Report No. . 50-344/85-16
. .
< Docket No. 50-344 License No. NPF-1
'
.
'
,
Licensee: Portland General Electric Company
'
121-S.'W. Salmon Street '
Portland, Oregon 97204
,
~ Facility Name: Trojan
,
Inspection at: Rainier, Oregon ,
Inspection conducted: May.14 - July l',1985 Inspectors: b ~ ! ~/-18-8
-
S. A..Richards ,
Date Signed Senior Resident Inspector ' *
$0 '" '
l'/f- W Date Signed-GG4. Kellund
'
h side t Inspe tor Approved By: f R. T..Dodds',: Chief
/f[[/
U/te%igned
'
ReactorProjectsSectIon1
,
Summary:
' Inspection on May 14 - July 1, 1985 (Report 50-344/85-16)
Areas Inspected: Routine inspection of oper'ational safety verification, corrective action, maintenance, surveillance,. followup on previous inspection items, observation and nview of refueling activities, evaluation of preparations for plant startup following the refueling outage, review of ,
selected system modifications, and inspection of various' aspects of plant operation. .The inspection involved 305. inspector-hours by the two NRC Resident Inspactor Results: Two violations of NRC requirements were identifie #
80 goy 80 0 G
- . -
T' :
'
t
.
DETAILS
' Persons Contacted
*W.S. Orser, Plant General Manager-R.P. Schmitt, Manager, Operations and Maintenance D.R. Keuter, Manager, Technical Services J.D. Reid, Manager, Plant Services
'
R.E. Susee, Operations Supervisor D.W. Swan, Maintenance Supervisor A.S._Cohlmeyer, Engineering Supervisor G.L. Rich, Chemistry Supervisor T.0. Meek, Radiation Protection Supervisor S.B. Nichols, Training Supervisor-D.L. Bennett,- Control And Electrical Supervisor P.A. Morton, Quality Assurance Supervisor R.W. Ritschard, Security Supervisor H.E. Rosenbach, Material Control. Supervisor J.K.-Aldersebaes, Manager, Nuclear Maint. and Construction The inspectors also interviewed and talked with other licensee employees during the course of the inspection. These included shift supervisors, reactor and auxiliary operators, maintenance personnel, plant technicians
.and engineers, and quality assurance personne * Denotes those attending the exit intervie ' Operational Safety-Verification s
During this inspection period,,the, inspectors observed'and examined activities to verify the operational safety of ths licensee's facilit The observations and examinations of those activities were conducted on a daily, weekly, or biweekly basi On a daily basis, the inspectors observed control room activities to verify the licensee's adherence to limiting conditio65 for operations as prescribed in the facility technical specifications. Logs, instrumentation, recorder traces, and other' operational records were examined to obtain information on plant conditions, trends, and compliance with regulations. On occasions when a shift turnover was in progress, the turnover of information on plant status was observed to determine that all pertinent information was relayed to the oncoming shif During each week, the inspectors toured the accessible areas of the facility to observe the following items: General plant and equipment condition Maintenance requests and repair Fire hazards and fire fighting equipmen Ignition sources and flammable material contro Conduct of activities in accordance with the licensee's
-
administrative controls and approved procedure ,
,
--
"
,
.
-
, Interiors of electrical and control panel ,
, Implementation of-the licensee's' physical security pla Radiation protection control . Plant housekeeping.and cleanlines ,. Radioactive waste system The licens'ee's equipment clearance control was examined weekly by the inspectors to determine that the-licensee complied with technical specification limiting conditions for operation with respect to removal of equipment from service. Active clearances were spot-checked to ensure that their issuance was consistent with plant status and maintenance evolution During each week, the inspectors conversed with operators in the control room, and with other plant personnel. The discussions centered on pertinent topics relating to general plant conditions, procedures, security, training, and other topics aligned with the work activities
'
involve The inspectors examined the licensee's nonconformance reports (NCR) to
. confirm that deficiencies were identified and tracked by the syste Identified nonconformances were being tracked and followed to the completion of corrective action. NCRs reviewed during this inspection period included 85-020, 85-028, and 85-05 Logs of jumpers, bypasses, caution, and test tags were examined by the .
inspectors. Implementation of radiation protection controls was verified by observing portions of area surveys being performed, when possible, and by examining radiation work permits currently in effect to see that prescribed clothing and instrumentation were available and use , Radiation protection instruments were also examined to verify operability and calibration statu During this inspection period, the plant remained in a refueling status, therefore, the requirements for operable safety systems was minima The inspectors routinely verified that the technical specification requirements for refueling operations were being met with regard to reactivity control, containment integrity, power availability, and decay heat removal capabilit Noviolationsordeviatj,onswereidentifie . Corrective Action The in'spectors examined facility records to verify that quality related deficiencies were identified and reported to cognizant management for resolution. Records examined by the inspectors included Requests for Evaluation, Possib1d Reportable Occurrences, Plant Review Board meeting minutes, and Quality Assurance Program Nonconformance Reports. Plant Review Board meetings were attended by the inspectors on May 30 and June 1 No violations or deviations were identifie ,
i
-
-.
;
-
n .
- l
.
, 3
.
~ Maintenance Maintenance activities involving preventive and corrective maintenance
.were observed by~the inspectors (Nring the inspection period. On-a
. selective basis, observations by i.ne inspectors. verified that proper approvals, system clearances, and required prerequisites were performed, as appropriate, prior to maintenance on safety-related systems or components. The-inspectors verified that' qualified personnel performed -
the maintenance using appropriate maintenance procedures. When possible,
'
replacement parts.were examined to? determine the proper certification of materials, workmanship and tests; ^During the' actual performance of the
- maintenance activity,.the inspectors checked for proper radiological-controls and housekeeping, as appropriat Upon completion of the maintenance activity, the. inspectors verified when possible, that the component or system was properly tested prior to returning the system or component to service. During the inspection period, maintenance activities observed were associated with various aspects of refueling activities including preparations for fuel-movement and securing the containment following fuel reload, and with calibration.of the auxiliary-feedwater flow instrument ' No violations or. deviations were identifie .
' Surveillance
#
The surveillance ~ testing of safety-related systems was witnessed by the inspectors. Observations by the inspectors included verification that proper procedures were used, test instrumentation was calibrated and that the system or component being tested was properly removed from service if required by'the test procedure. Following completion of the surveillance tests, the inspectors verified that the test results met the-acceptance criteria of the technical specifications and were reviewed by cognizant licensee personnel. The 'nspectors also verified that corrective action was initiated, if required, to determine the cause for any unacceptable test results and to restore the system or component to an operable status consistent with the technical specification requirements. Surveillance tests witnessed during the inspection period were associated with hydraulic snubber testing, calibration of a source range instrument, testing of an emergency diesel generator, and verification of rated flow through a containment spray-pump suction check valv No violations or deviations were identifie . Followup On Frevious Inspection Items Violation 84-29-02 (Closed): Failure to periodically check the proper operation of time delay relays. The licensee has implemented Maintenance Procedure 1-17, " Time Delay Devices." This procedure requires that all safety-related time delay relays be checked for proper operation at a scheduled frequency. Further details of the inspector's review of this program is contained in paragraph 9 of this repor Violation 84-29-03 (Closed): Inattentiveness to reactor controls resulting in the lifting of four main steam line safety valves. The
_ - _ _ _ _ _ _ _ - .- _ _
,
.
'
licensee has instituted several measures to improve operating crew performanc Operations manning levels have been increased to allow a six crew shift rotation with increased operator training. Control of personnel access to the control room has been enhanced'to reduce operator distractions. Administration of equipment tagging has been removed from the control room during'the day shift. In addition, management guidance has been provided to operations personnel and to the shift technical advisors with regard to their responsibilities during both routine operations and events. 'Following plant recovery _ from the operational events of September, 1984, the plant operated in a relatively uneventful manner for the remainder of cycle seve Unresolved Item 84-21-01 (Closed): Installation of the auxiliary feedwater system battery. The inspectors reviewed pipe support drawing HBD-72-56-H6 and verified that the attachment of the battery rack leg to the diesel fuel line pipe support was properly documente Licensee Event Report (LER) 85-03 (Closed): . Inadvertent safety injection due to circuit failur The inspector discussed this event with the Instrumentation and Control Supervisor and verified that the root cause of the event was the electronic failure of a pressurizer low pressure r bistable. The faulted bistable has been replace '
7. Refueling Outage Activities
,
The plant remained in a refueling outage for the entire duration of this inspection period. Major evolutions being conducted by the licensee during the outage included:
- core refueling with replacement of 40 fuel assemblies
- 10 year inservice inspection of the reactor vessel
- steam generator eddy current testing
- steam generator sludge lancing
- turbine generator inspection
- containment local leak rate testing
- replacement of selected sections of secondary system piping due to pipe wall thinning
- replacement of selected feedwater heaters
- safety-related snubber surveillance testing
- modification of the reactor trip breakers
- various modifications to meet environmental qualification requirements
- various modifications for fire protection (Appendix R to 10 CFR 50)
- technical specification surveillances with refueling outage frequencies The inspectors followed the progress of the outage activities by attending the licensee's daily morning meeting. At this meeting, the status of all major work items was' summarized by the supervisors and managers responsible for the work. The inspectors made frequent tours of the plant, including the containment building, and witnessed portions of refueling activities in progres Due to a recent technical specification change, the licensee was required, for the first time, to inspect and functionally check a percentage of the safety related snubbers during the outag The
.
-
.
snubbers are divided into two basic categories, hydraulic and mechanica The licensee has only 20 hydraulic snubbers,' all of which are of large capacity and are installed on the steam generators and the main steam lines. Initial functional testing of two hydraulic snubbers resulted in both failing. Based on these failures, the licensee elected to rebuild all 20 hydraulic snubbers. Ench hydraulic snubber was also successfully functionally tested prior to reinstalling it in the plan Functional testing of the mechanical snubbers also resulted in a number of failure Based on these failures, the licensee increased the scope of the inspections as required by technical specifications. The inspectors witnessed portions of testing both hydraulic and mechanical snubber In response to concerns raised with regard to the proper assembly of compression fitting used in the fabrication of instrumentation sensing lines, the licensee implemented an inspection program to check selected safety related fitting The initial results of this program indicated that a relatively high percentage of'the fittings inspected were not assembled in accordance with the vendor's recommended practic The majority of the discrepancies were associated with the fitting not being engaged the correct number of turns. A review of the results also indicated that fittings which were found not properly assembled were from initial plant construction and not due to recent plant modification Based on these inspection results, the licensee has increased the scope of the program which will continue after the completion of the outag The inspectors concluded that the licensee's actions in this area have been appropriate. The inspectors will further review the scope and results of this program in a later inspection repor While performing a local'~ leak rate test (LLRT) of containment penetration P-50, the 'B' train containment recirculation suction line, the licensee discovered that a test connection located on top of the line outside of containment had a thru wall crack. This line is not normally in service or pressurized. An analysis of the failure by the licensee indicated that the test connection had failed as a result of cyclic fatigue. An inspection of other test connections on containment penetrations revealed no other indications of potential failure The cracked test connection was repaired and successfully passed an LLRT. The licensee has submitted a 30 day report to the NRC documenting this occurrence. The resident inspectors will complete their followup of this item as part of the routine licensee event report inspection proces As discussed in paragraph 10 of inspection report 85-13, the inspectors had questioned the validity of licensee's determination of the minimum acceptable performance of the residual heat removal (RHR) pump During the outage, the licensee ascertained that their original analysis was in error. To resolve the immediate question of pump acceptability prior to restart of the plant, the licensee contracted the Westinghouse Corporation to perform an ECCS analysis assuming a reduction in pump performance beyond that previously considered. The Westinghouse analysis verified that the net effe t on core cooling was minimal and that the RHR pump performance was acceptabl Based on this information, the inspectors concluded that a safety concern regarding the RHR pump performance did not exist. The inspectors will followup on the
- _ - __ _- _ .
t
'
.
-
circumstances surrounding the licensee's determination of an invalid acceptability limi During routine work in a control room panel, a licensee craftsman noted that a termination to a contact on a manual safety injection switch was broken with the broken wire covered by tape. The functional result of this broken wire was that should a manual safety injection have been initiated with the switch, one of two reactor trip breakers would not have opened as a direct result of the switch. No automatic safety functions were affected and the manual reactor trip switch, located next to the safety injection switch, remained capable of opening both reactor trip breakers. Additionally, both trip breakers would open on a manual safety injection if the plant was above 10 percent power due to the main turbine being tripped. The licensee attempted to determine by review of work records and discussions with employees who may have been responsible for the problem. The switch had been last functionally tested in February, 1984. The licensee has been. unable to identify any activities '
since that time which could have been related to the problem. The switch y wet repaired and the other safety injection switch and the reactor trip switches were inspected for similar problems with negative result The inspectors discussed the significance of this event with the plant general manage The inspectors commented that although the safety significance in this instance was small,-the fact that an individual was aware of the problem, as evidenced by the tape on the wire, and apparently had not reported the problem to plant supervision was of concern. The plant manager acknowledged this observatio No violations or deviations were identifie . Ready For Startup Program For the plant recovery from the refueling outage, the licensee has implemented a " Ready for Startup" program. This program is outlined by Administrative Procedure-A0-3-25. The program requires individual managers and supervisors to review their assigned areas and determine whether the plant is properly prepared to return to powef operation. The individual reviewing any given area is required to fill out a form and list any outstanding exceptions wh'ich need consideration for plant recover Approximately 22 separate categories are considere The evaluations for each category are filed in a ready for startup notebook which is then used by plant management to maintain an overall understanding of the plant status. The notebook is updated as open items are cleared or resolved, and is factored in to the plant general manager's decision to allow the facility to commence heatup and critical operatio The licensee held several meetings with all supervisory personnel in attendance to discuss management expectations of the program and the status of each area under review. An inspector attended the meetings held on June 21, 28, and 29. The inspectors also reviewed the ready for startup notebook and discussed the program with various personnel involved. The program appeared to be very effective in tracking the
-
.
^
status of a large number of diverse areas which relate to readiness of the plant to operat In addition to this program, the licensee has implemented several'other
.
actions to aid in a trouble-free recovery from the outage. Management personnel are assigned to provide coverage during critical steps in the recovery. The operating crews will be reporting onsite early to allow for pre-shift briefings prior to important evolutions and all operators will complete a formal training class on major outage modifications prior to the startu The implementation of this program was audited by the corpord e quality assurance organization while the program was in progress. Their comments and those of supervisory personnel will be factored into a revision of the program for next year's outage. At the conclusion of this inspection period, the plant had basically resolved all major outstanding items and T was preparing to heatu No violations or deviations were identifie . Followup On Equipment Modifications For September 20, 1984 Event While attempting to return the unit to operation following the 1984 refueling outage, the plant experienced a reactor trip and safety injection, during which both safety related auxiliary feedwater (AFW)
pumps and one emergency diesel generator (EDG) failed to function as expected. The licensee committed to review the circumstances surrounding each failure and take corrective action as necessary. The licensee has completed their revie At the time of the event, the licensee determined that the diesel AFW pump had not operated properly because a time delay relay in the control circuitry was not correctly set. As long term corrective action, the licensee implemented a program to periodically check the settings of time delay devices. The inspectors reviewed this program and the results of the first pet of checks and found the program to be effective. The licensee has identified a number of discrepancies in the initial program and is working to correct these. Additionally, the licensee has commenced tacking the setting bial of the relays in place with a locking paste. This prevents inadvertent movement of the dia The licensee found two problems associated with the EDG First, the
'
unit technical specifications require that the crankcase high pressure trip be disabled on an automatic start. The control circuitry was found not to function in this manner. The licensee modified the trip with request for design change (RDC) 83-053. Their review also found that the EDG " fail to start" function was not overridden. The licensee has determined that this function should remain operable during an automatic start and has requested the NRC Division of Nuclear Reactor Regulation to revise the technical specifications in this area. The second problem
'
noted was that new vibration dampers placed on the EDGs were causing oil splash to erroneously trip the crankcase pressure switches on manual start The licensee has installed splash guards on the pressure switches to correct this proble . _ _ _ _ _ _ _ -
i
.
..
With regard to the steam driven AFW pump, the licensee addressed the problems of the pump control oscillations and the pump suction transmitter failur Immediately after the event, the licensee modified the snubbing orifice on the discharge pressure sensing line. This action corrected the pump oscillations. No obvious problem was observed with the suction pressure transmitter, therefore,-the licensee agreed to perform a design review of the instrument installation. As an interim corrective measure, the licensee has increased the frequency of calibration of the instrument and checks the control room indication daily for correct operatio The licensee's design review was completed during this inspection perio The review considered the instrument location, the sensing line arrangement, the transmitter mounting,-the environmental conditions, the I transmitter design, and the possibility of mechanical vibrations or hydraulic transients. The review was unable to identify the cause of the transmitter failures, however, in light of the past problems with the transmitter, the review recommends that the unit be replaced with a more recent state of the art desig No deviations or violations were identifie . Request For Design Change (RDC) Review During the outage, the inspectors selected several design changes to review for proper implementation. The design changes were associated with the following activities:
- Modification of the incore instrumentation seal table
- Installation of a shunt trip feature on the reactor trip breakers
- Installation of a control circuit decouple switch on the 'B' train EDG
- Modification of systems associated with the boron injection tank to reflect the reduction of boron to 0 ppm in the tan The inspectors reviewed the documentation packages associated with each job and observed completed work when possible. The inspectors will <
continue their efforts in this area with reviews of completed work packages and testing documentatio No significant problems were noted, however, discussions with licensee personnel and review of design documentation indicated that a significant amount of difficulty with the installation of the EDG decoupler switch resulted due to problems with the accuracy of the vendor drawings which describe the point-to point wiring of the EDG control panels. Problems with the accuracy of vendor drawings has previously been discussed with the licensee and documented in inspection report 85-04. In discussions with the plant general manager, he acknowledged that the plant's experience with this modification tended to verify that problems exist with vendor drawings. He further noted that correction of this type of drawings has been given a high priority by the corporate offic No violations or deviations were identifie . Spent Fuel Pool Rerack Documentation
$
-
As part of a continuing effort to monitor the work associated with increasing the capacity of the spent fuel pool (SFP), the inspectors reviewed selected sections of the documentation of the work, which has now been completed. The inspectors' review indicated the following:
--One rack did not meet the acceptance criteria for spacing between the top of the rack and the pool wall. The rack is too close by 3/16 inc Four racks were not annotated as acceptable by the action engineer although they did not meet the acceptance criteria for levelness. The procedure allowed the action engineer to accept each rack on a case-by-case basi The testing procedure was revised to drag test only 60 cells with the racks in the pool although the PGE topical report stated that a minin.um of 76 cells would be teste The PGE topical report and the installation procedure were in conflict with regard to acceptable spacing between racks and between racks and the wal Four racks were not signed off as having had the second set of four rack feet screwed down into proper contact by the divers who worked on the jo The inspectors discussed these discrepancies with the responsible licensee personnel. The licensee has initiated action in each case to correct the problem. The inspectors were particularly concerned with regard to the verification of the proper positioning of the rack fee The licensee reviewed their work records and contacted the contractor who had provided diving services for the job. Based on this effort, the licensee concluded that the rack feet were properly installed. The inspectors concurred with the licensee's determination, however, the inspectors concluded that the licensee's failure to properly document the work activity, as required by procedure, was an apparent violation (344/85-16-01).
At the conclusion of the inspection period, the inspectors discussed with the plant general manager the importance of licensee personnel properly documenting their work. The inspectors noted that further reviews by licensee personnel may have identified the deficiencies observed by the inspectors, however in view of the fact that the SFP racks were basically in service, the inspectors felt that these deficiencies should have been addressed at the time the job was complet . Miscellaneous Observations While making a tour of the reactor containment on June 28, with the plant in mode 5 and making preparations to heatup, the inspectors noted a danger tag hanging on a drain line valve off the 'B' train containment spray header. The tag indicated that the valve was open and the inspectors observed that the drain cap was removed. Because of the plant's intentions to commence heatup, this condition did not appear appropriate. The inspectors reviewed the clearance log and observed that the log indicated that the tag, tag, number 4 of clearance 85-1066, had been removed and the valve properly positioned. The inspectors immediately informed the shift supervisor and plant supervision of the problem. The inspectors observed several factors that could have caused l
)
_-__ _ _ _ .
,
...
the proble The clearance sheet did not state clearly the train that the tag was associated with in describing the tag location. Further, check valves, test connections, drains, and vents at Trojan are not uormally designated by number. Therefore, when describing the location of the tag for such a valve, the location is referenced to a nearby l reference valve. This obviously lends itself to the potential for error on the part of the individual hanging or removing a tag. Additionally,
.
!
if a tag is located inside containment, such as in this case, the individual looking for the valve may not have the clearance sheet with him as an aid in finding the valve. The inspectors concluded that i failure to control the clearance as required by plant safety procedure
'PS-3-30, " Trojan Holdout and Tagging Procedure", is an apparent violation (344/85-16-02). The inspectors discussed this occurrence with the plant general manager in relation to the licensee's ongoing consideration of independent verification of activities at tne_ plan The inspectors noted that the pressurizer pressure instruments are located inside containment in such a manner that approximately 20 psi static head of water is contained in the sensing line between the pressurizer vapor space tap.and the instrument. The inspectors
~
i questioned whether the instruments were properly biased to account for this head of water. The licensee's review determined that the instruments are required to be adjusted to account for the static head '
and that this had not been considered since initial plant operation. The licensee also determined that interim operation with the instruments "as is" is acceptable from a safety consideration and has documented this conclusion via a safety evaluation. The licensee intends to adjust the instruments at the first available opportunit This item will be further followed and is considered unresolved (344/85-16-03).
The inspectors noted that the licensee's local leak rate test (LLRT) of the fuel transfer tube does not 3ressurize the outer tube although the
',
tube contains expansion bellows )oth inside and outside containment. The licensee's Nuclear Safety and Regulation Division felt that a test of this type was not required, however, they agreed to address this concern in a license change application to the NRC. This item will be followed by the inspectors (344/85-16-04).
During the course of the inspection period, the inspectors noted five pipe hangers or supports which were not properly made up. The discrepancies were all associated with 2 inch pipe or smaller and in only one case did a support appear to be nonfunctional. The systems involved were the safety injection system and a containment penetration isolation valve associated with the containment atmospheric sampling system. Other examples of pipe support discrepancies have been documented in previous reports. The inspectors discussed these observations with the plant general manager. The inspectors judged that the discrepancies noted would not affect overall system operability, however, it appeared to indicate a need for the licensee to sensitize their personnel to the importance of maintaining the plant in conformance with design, including small bore pipe hangers. The plant manager stated that he would address this issue with site maintenance and modifications personne . Unresolved Item
c- . , .
-b
.. t
.
,
11'-
O Unresolved items are matters about which more information is required in
:- c , order to ascertain whether they are acceptable' items, v'iolations,;o deviations. An unresolved item disclosed during the inspection is
- discussed in paragraph 12.
'
' 1 Exit Interview-r_
The' inspectors met with the plant general manager at the conclusion of' '