Category:INSPECTION REPORT
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification IR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245L1471989-08-0303 August 1989 Insp Rept 50-344/89-12 on 890522-0601.Violations Noted.Major Areas Inspected:Review of Licensee NDE Procedures,Nde Records,Radiographs & QA Documentation & NRC NDE Personnel Reperformed Sample NDE on Safety Related Sys & Components ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 1999-09-09
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification IR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245L1471989-08-0303 August 1989 Insp Rept 50-344/89-12 on 890522-0601.Violations Noted.Major Areas Inspected:Review of Licensee NDE Procedures,Nde Records,Radiographs & QA Documentation & NRC NDE Personnel Reperformed Sample NDE on Safety Related Sys & Components ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 1999-09-09
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification IR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245L1471989-08-0303 August 1989 Insp Rept 50-344/89-12 on 890522-0601.Violations Noted.Major Areas Inspected:Review of Licensee NDE Procedures,Nde Records,Radiographs & QA Documentation & NRC NDE Personnel Reperformed Sample NDE on Safety Related Sys & Components ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 1999-09-09
[Table view] Category:UTILITY
MONTHYEARIR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 IR 05000344/19890161989-06-28028 June 1989 Insp Rept 50-344/89-16 on 890514-0617.Unresolved Item Noted Re Appropriate Level of Review Necessary for Lower Tier Procedures.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Refueling Activities ML20245E6811989-06-0505 June 1989 Insp Rept 50-344/89-10 on 890326-0513.Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Event Followup & Open Item Followup ML20245D5851989-06-0202 June 1989 Insp Rept 50-344/89-14 on 890508-12.Violations Noted. Major Areas Inspected:Occupational Exposure During Extended Outage & in-office Review of Licensee Records IR 05000344/19890111989-05-30030 May 1989 Mgt Meeting Rept 50-344/89-11 on 890413.SALP Results for Dec 1987 - Dec 1988 Reviewed & Recent Plant Transient & Activities in Fire Protection & Outage Mgt Discussed IR 05000344/19890151989-05-26026 May 1989 Enforcement Conference Rept 50-344/89-15 on 890510.Major Areas Discussed:Concerns Identified in Security Team Insp Rept 50-344/89-02,Chemistry Team Insp Rept 50-344/89-07 & Special Insp Rept 50-344/89-13 IR 05000344/19890071989-05-23023 May 1989 Insp Rept 50-344/89-07 on 890417-21.No Violations Noted. Major Areas Inspected:Plant Chemistry Related Areas, Including Organization & Mgt,Qa Training & Qualifications, Water Chemistry Control & Analysis & Facilities IR 05000344/19890131989-05-19019 May 1989 Insp Rept 50-344/89-13 on 890409-29.Violations Noted.Major Areas Inspected:Licensee Activities Re Failure of Permissive & Interlock Features for RHR Sys Shutdown Cooling Suction Isolation Valve ML20246D8961989-04-19019 April 1989 Insp Rept 50-344/89-05 on 890212-0325.Violations Noted.Major Areas Inspected:Safety Verification,Maint,Surveillance,Event Followup,Design Engineering & Open Item Followup IR 05000344/19890061989-04-18018 April 1989 Insp Rept 50-344/89-06 on 890320-24.No Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings,Review of Lers,Followup on IE Info Notices,Mgt & Organization,Training & Qualification & Facility Tours IR 05000344/19890041989-03-23023 March 1989 Insp Rept 50-344/89-04 on 890228-0303.Violations Noted. Major Areas Inspected:Follow Up on Two Open Items & One Unresolved Item Identified During Previous Emergency Preparedness Insps & Emergency Preparedness Program ML20247G2151989-03-13013 March 1989 Insp Rept 50-344/89-01 on 890101-0211.Violations Noted.Major Areas Insepcted:Operational Safety Verification,Maint, Surveillance,Event Followup & Followup on Previously Identified Items IR 05000344/19890031989-02-10010 February 1989 Enforcement Conference/Mgt Meeting Rept 50-344/89-03 on 890126.Major Areas Discussed:Nrc Concerns Developed as Result of Insp of Commercial Grade Procurement,Per Insp Rept 50-344/88-46 & Licensee Efforts in Areas of QA Program IR 05000344/19880401988-11-0303 November 1988 Insp Rept 50-344/88-40 on 880807-1001.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19880441988-10-25025 October 1988 Mgt Meeting Insp Rept 50-344/88-44 on 881004.Major Areas Discussed:Concerns Developed as Result of Sept 1988 Reactor Trip & Subsequent Forced Outage Activities ML20154P6391988-09-16016 September 1988 Insp Rept 50-344/88-36 on 880808-12.Deviation Noted.Major Areas Inspected:Licensee Conformance to Reg Guide 1.97,Rev 3 ML20154N8951988-08-31031 August 1988 Insp Rept 50-344/88-39 on 880808-12.One Unresolved Item on Purchase & Use of Commercial Grade Items in safety-related Sys Identified.Major Areas Inspected:Commercial Grade Procurement & Pipe Support Design Verification IR 05000344/19880291988-08-31031 August 1988 Insp Rept 50-344/88-29 on 880619-0730.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Maint,Surveillance,Event Follow Up & Open Item Follow Up IR 05000344/19880311988-08-23023 August 1988 Insp Rept 50-344/88-31 on 880718-22.No Violations or Deviations Noted.Major Areas Inspected:Unresolved, Enforcement & Followup Items ML20151T4361988-07-29029 July 1988 Insp Rept 50-344/88-27 on 880627-0701.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Chemistry Controls,Control of Radioactive Matls & Contamination,External Exposure Control & Internal Exposure IR 05000344/19880261988-07-28028 July 1988 Insp Rept 50-344/88-26 on 880606-10 & 14-17.Violations Noted.Major Areas Inspected:Commercial Grade Procurement & Inservice Insp Activities IR 05000344/19880281988-07-25025 July 1988 Insp Rept 50-344/88-28 on 880711-15.No Violations or Deviations Noted.Major Areas Inspected:Followup on Previous Insp Findings,Review of Emergency Facilities,Equipment, Instrumentation & Supplies & Exam of Training Program IR 05000344/19880321988-07-25025 July 1988 Insp Rept 50-344/88-32 on 880711-15.No Violations Noted. Major Areas Inspected:Followup of Open Items & Written Repts of Nonroutine Events ML20151K5411988-07-12012 July 1988 Insp Rept 50-344/88-24 on 880508-0618.Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Event Follow Up & Open Item Follow Up IR 05000344/19880231988-06-30030 June 1988 Insp Rept 50-344/88-23 on 880510-26.No Violations or Deviations Noted.Major Areas Inspected:Specs for Emergency Operating Procedures IR 05000344/19880251988-06-16016 June 1988 Insp Rept 50-344/88-25 on 880516-31.No Violations Noted. Major Areas Inspected:Licensee Activities in Resolving Reactor Plant Pipe Whip Restraint Design Vs as-built Gap Discrepancies & Inservice Insp Ultrasonic Test Activities IR 05000344/19880201988-06-10010 June 1988 Insp Rept 50-344/88-20 on 880516-20.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings & Occupational Exposure During Extended Outages IR 05000344/19880151988-05-25025 May 1988 Insp Rept 50-344/88-15 on 880425-29.No Violations Noted. Major Areas Inspected:Evaluation of Design Bases of Diesel Generators,Review of Tests & Experiments Program & Review of QA Program of Measuring & Test Equipment IR 05000344/19880171988-05-23023 May 1988 Insp Rept 50-344/88-17 on 880418-21.Violation Noted.Major Areas Inspected:Licensee Fire Protection Program Implementation & Action on Previous NRC Insp Findings IR 05000344/19880181988-05-18018 May 1988 Insp Rept 50-344/88-18 on 880425-29.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Activities & Insp Procedures 30703,73051,37052,73753 & 73755 IR 05000344/19880211988-05-13013 May 1988 Mgt Meeting Rept 50-344/88-21 on 880422.Major Areas Reviewed:Salp Results for 861101-871130 & Discussion of Recently Developed Issues on Containment Isolation Valves IR 05000344/19880111988-04-27027 April 1988 Insp Rept 50-344/88-11 on 880329-31 & 0404-05.No Noncompliance Noted.Major Areas Inspected:Plant Water Chemistry Control & Chemical Analysis,Qa of Plant Chemistry Activities,Radiochemical Analysis & post-accident Sampling IR 05000344/19880121988-04-21021 April 1988 Mgt Meeting Rept 50-344/88-12 on 880325.Areas Discussed: Procedure & Maint Improvement,Outage Activities & Barton Pressure Transmitter Troubleshooting IR 05000344/19880101988-04-0707 April 1988 Insp Rept 50-344/88-10 on 880314-18.No Violations or Deviations Noted.Major Areas Inspected:Annual Review of Licensee Program to Handle Info Notices,Review of Procedures & Onsite Followup of Written Repts of non-routine Events ML20151C4741988-03-28028 March 1988 Insp Rept 50-344/88-04 on 880208-12 & 0229-0304.No Violation Noted.Major Areas Inspected:Licensee Action on Previous Findings,Organization & Mgt,Training & Qualifications,Solid Wastes,Transportation & Facility Tours IR 05000344/19880061988-03-0909 March 1988 Insp Rept 50-344/88-06 on 880222-26.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training & Followup Items & Followup Items of Noncompliance 1990-09-05
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site ML20202C2111999-01-21021 January 1999 Notice of Violation from Insp on 971207-10.Violation Noted: Licensee Did Not Perform Survey to Assure Compliance with 10CFR20.1902(d) IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning ML20199F0291998-01-15015 January 1998 Notice of Violation from Insp on 971201-03.Violation Noted: Licensee Failed to Ensure Adequate Survey of Certain Contaminated Tools IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl ML20210S7131997-09-0909 September 1997 Notice of Violation from Insp on 970721-24.Violation Noted: from 960923-970515,licensee Failed to Conduct Surveys Adequate to Evaluate Quantity of Radioactive Matl Released from Radiological Controlled Area IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program ML20135B7491997-02-25025 February 1997 Notice of Violation from Insp on 970204-06.Violation Noted: Licensee Had Not Audited Annual Radiological Environmental Report TS 6.9.1.5.1 Since 890519 IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept ML20059A1421993-12-15015 December 1993 Notice of Violation from Insp on 930930-1112.Violation Noted:Detailed Construction Package 1 Associated W/Request for Design Change 78-103,installed in May 1980,did Not Correctly Translate Design Basis Into Applicable Procedures IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items PNO-V-93-002, on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased1993-01-13013 January 1993 PNO-V-93-002:on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items ML20127E9461993-01-0808 January 1993 Notice of Violation from Insp on 921027-1207.Violation Noted:Licensees Corrective Actions Not Effective in That,On 921112 & 15,access Doors to Plant Issue Warehouse Not Controlled by Authorized Personnel PNO-V-93-001, on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media1993-01-0404 January 1993 PNO-V-93-001:on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification PNO-V-92-038, on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety1992-12-0808 December 1992 PNO-V-92-038:on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety PNO-V-92-037, on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart1992-12-0101 December 1992 PNO-V-92-037:on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart ML20126E9101992-11-25025 November 1992 Notice of Violation from Insp on 920915-1026.Violation Noted:Supervisor Informed of Receipt of a Nonconforming Component,Chlorine Detector & Did Not Initiate an Ncr ML20126E9131992-11-25025 November 1992 Notice of Deviation from Insp on 920915-1026.Deviation Noted:Containment Air Locks Not Tested Using Pressure Decay Method IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities PNO-V-92-004, on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 9202271992-02-25025 February 1992 PNO-V-92-004:on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 920227 IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification PNO-V-91-002, on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable1991-03-0505 March 1991 PNO-V-91-002:on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable ML20062F9301990-11-0808 November 1990 Notice of Violation from Insp on 900902-1006.Violation Noted:Temp of Train B Component Cooling Water Pump (ASME Code Class 3 Pump) Taken W/Instrument W/Scale More than Three Times Ref Value of Bearing Temp PNO-V-90-045, State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference1990-11-0707 November 1990 PNO-V-90-045:State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference 1999-09-09
[Table view] |
Inspection Report - Trojan - 1985030 |
---|
|
|
Text
.
.
U. S. NUCLEAR REGULATORY COMMISSION
REGION V
Report N /F5-30 Docket N License N NPF-1 Licensee: Portland General Electric. Company 121 S. W. Salmon Street Portland, Oregon 97204 Facility Name: Trojan Nuclear Plant Inspection at: Rainier, Oregon Inspection cor. ducted: September 9-13 and September 23-27, 1985 Y
Inspector: I < tali / wiur L0t $l$5 D. B. Pereira, Reactor Inspector Date $1gned Approved By: /C /- ('
R. T. Doddd7 Chief, Reactor Project Section 1 Dat/ $/gned Summary:
Inspection during the period of September 9-13 and September 23-27, 1985 (Report No. 50-344/85-30)
t Areas Inspected: Routine, unannounced inspection of the Requalification Training Program, Facility Modification Program, QA Program - Annual Review, Implementation - Audit Program, Audit Program, and follow-up closure of open items. The inspection involved 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> onsite by one hTC inspector. The inspection modules followed were: Requalification Training Program (41701),
Facility Modification (37701), QA Program-Annual Review (35701),
Implementation-Audit Program (40704), and Audit Program (40702).
Results: No items of noncompliance or deviations were identifie l l
l
,
8510280159 051010 1 l PDR ADOCK 05000344 G PDR
.
, .- - . -- . -. . .- .
.-
DETAILS _
Persons Contacted
- *R. P. Schmitt, Manager, Operations and Maintenance
- J. D. Reid, Manager, Plant Services
.
S. B. Nichols, Training Supervisoe
,
D. W. Swan, Maintenance Supervisor
, D. R. Keuter, Manager, Technical Services
' '
-
R. E. Sesee, Operations Supervisor
- C. A. Olmstead, Manager, Nuclear Quality Assurance Department
! *J. K. Aldersebaes, Manager, Nuclear Maintenance and Construction
' Neese, Assistant Shift Supervisor Andone, Shift Supervisor Ellis, Instructor, Training Department Scheitzer, Branch Manager, Quality Assurance Engineering G. Zimmerman, Manager, Nuclear Regulation Branch J. Dunlop, Branch Manager, Quality Assurance Operations H. Moomey, Trojan Resident, Oregon Department of Energy
- Denotes attendance at exit interview conducted at Trojan Nuclear Plant on
'
September 13, 1985, and at Portland Corporate Headquarters on September 27, 198 . Requalification Training Program The requalification training program was examined for conformance with regulatory requirements, Technical Specifications, and licensee ccomitments. The inspection included a review of records of individual licensed operators who had failed a portion of their annual examinatio The inspector reviewed records for four shift supervisors, five control room operators and three assistant control room operators to ensure that j requalification training was adequately documented. The inspector interviewed two control room operators and one assistant control room operator to verify that their training records reflected the actual training received. The inspector verified chat the licensee instructors have a prepared lecture schedule, lesson plan, and that the instructors have evaluated the result of the most recent examinations and have identified deficient areas to be covered in the lecture series. The control room operators interviewed indicated to the inspector that the individual self-study guides and system checkoffs were beneficial technical aspects of the requalification training program. The operators found it helpful to review the examination after the exam was given, and the requalification training program provides for this review one week
.'
after the exam has been given. The licensee records for the individual licensed operators were complete and included recent medical
examinations, simulator training evaluations, and latest examinatione needed to maintain licensed capabiiity. Within the scope of this audit, it was determined that, the requalification training program for licensed
- operators was being implemente No violations or deviations were identified.
1
_ . - - - , _ _ - . .,+,-,m , , . - , ,
-
, . ,, .-..-.,.-.r,_- -_,,rm,___w.~__,,, _.__r,,. ,__._.--.,m 4 . _ , . _ . . . , ._
- . . -- - - -
.
.
3. Facility Modifications The facility modification program was examined for conformance with regulatory requirements, Technical Specifications, and licensee commitments. The inspection included a verification that the modified systems were installed in accordance with the approved design by examining the installation records, reviewing non-destructive examination (NDE) records, and ensuring revised procedures relating to the modification were completed and approve The following two facility modifications were examined in detail:
As-Built Package, RDC-84-106, DCP-2 replaced Laurence Solenoid Valves on Main Steam Isolation Valves (MSIVs) and the MSIV Bypass Valves. This RDC was completed on June 29, 1985. The test records appeared to be complete and the as-built drawings reflected the design chang As-Built Package, RDC-84-104, DCP 1 replaced Auxiliary Feedwater (AFW)
Motor-Actuators. The replacement of 8 AFW flow control valve motor operators was completed on June 27, 1985. Temporary Plant Test-137, dated June 20, 1985, Rev. O verified proper operation of the turbine driven AFW pump upon completion of the modification to the AFW valve
"
,
motor actuators under RDC-84-104. Remote and local operation (open and close) of the AFW flow control valves was verified satisfactor As-built drawings were revised, up-dated and incorporated into the appropriate design and piping and instrumentation drawings prior to system startup.
.
The inspector examined the completed test records and verified that the
licensee conducted a review and evaluation of test results, and that the test results were within previously established acceptance criteri Test deviations were resolved and retesting accomplished as necessar It should be noted that the licensee's test did not include simultaneous operation of both feed pumps, the subject of a subsequent licensee event
[
!
report when one pump f ailed to start because of low pump suction pressure. This was corrected by valve adjustment and maintaining condensate storage tank level above 60%.
No violations or deviations were identifie . Quality Assurance Program Annual Review
,
'
The inspector examir.Ad changes to the quality assurance program to i determine whether personnel responsible for development of implementating
- procedures were familiar with the changes or revisions. The inspector i
also exasined implementing procedures to determine whether revisions were
! in conformance with the changes described in the docketed Quality Assurance (QA) program, and to determine whether the implemented QA
, program was in conformance with regulatory requirements, commitments, and
- industry guides and standards.
<
!
The significance of the specific changes was discussed with cognizant
personnel. The licensee personnel interviewed had full knowledge and understood the significance of any changes. Nuclear Division Procedure
'
(NDP) No. 100-5 establishes the requirements for the preparation of
.-. ___ _ _ _ _-._ _ __ _ , _ _ _ _ _ . - _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _
. 3 cvaluations required by NRC Regulations 10 CFR 50 and Trojan Technical Specifications for changes to the facility and changes to procedure The Safety Evaluation Checklist (Attachment A)'and the Detached. Safety Evaluation (Attachment B) of NDP No. 100-5 were utilized to ensure that Trojan personnel understood the significance of the specific change The QA Program changes were prepared by the QA personnel and these personnel gave training on the QA program changes to their department managers and to QA personne The inspector reviewed the QA program implementation by inspecting the Audit Program and Implementation-Audit Program during this inspection period. Further review of the QA program implementation was conducted in other inspection reports as follows: the Document Control Program in Inspection Report 85-23; the Onsite Review Committee in Inspection Report 85-13; and the Offsite Review Committee and Offsite Support Staff in Inspection Report 85-1 Within the scope of this audit, the licensee's QA program appears to be effectively implemented and was in conformance with regulatory requirements, commitments, and industry guides and standard No violations or deviations were identifie . Audit Program The inspector examined whether the licensee has developed a quality assurance program relating to audits of activities in conformance with regulatory requirements, and commitments in the applicatio Portland General Electric (PGE) Company Topical Report (PGE-8010)
establishes the QA program, and its implementing procedures and instructions. The QA program describes the PGE organizational structure for quality assurance; identifies the functions, duties, and responsibilities of key departments and individuals; describes inter-relationships and inter-faces among internal groups and external organizations; delineates quality program requirements, and prescribes methods of implementatio Nuclear Quality Assurance Department Procedure (NQAP) 110, Rev. 10, entitled " Quality Assurance Audits" establishes requirements and provides guidelines for the selection of audit personnel, preparation of audit checklists, performance of audits, reporting of audit results, follow-up of audit findings, and verification of corrective action for quality
assurance audits performed by the Nuclear QA departmen The inspector verified that the QA department performs the following functions as described in NQAP 110, NQAP 111, Rev. 8, entitled
- " Qualifications of Auditors", and NQAP 101, Rev. 7, entitled " Control of the PGE Nuclear QA Program"
Determining qualifications of audit personne *
Determining independence of audit personnel.
!
l
,
-.m - , , .._,, , . . . - - , ,_ - - . - _ . . _ - - . . - , _ _ _ . . , , . . . - . _ .
m.m,_, m-.,-.~m_... ._..,-.m.r, -
-, _ , -. ___
.. - _ . - . . - . . . - . - - .. _ . . . . .
Ensuring corrective actions will be taken for deficiencies 4 identified during audits, i i l Issuing audit reports to managemen *
Periodic review of QA audit program to determine its status and adequac ,
Preparation 6f long-range audit plans or schedule *
l' Audited. organization will be-required to respond in writing to audit I finding Checklists or. procedures will be used in the performance of audit It appears that the licensee has developed an ef fective QA program relating to audits of activitie No violations or deviations were identifie . Implementation, Audit Program The inspector examined whether the licensee has qualified personnel i
conduct routine audits, ensuring that activities were in conformance with
- regulatory requirements, licensee commitments, and industry guides and
- standards. The inspector examined / reviewed fourteen audits conducted by the QA Department during the 1984 and 1985 time period. The inspector's j review of the audits verified that the following inspection requirements
{ were met:
i 4 QA personnel involved in the audit met the minimum education,
!
experience, and qualification requirements for the audited activity.
- The content of the audit report clearly defines the scope of the l audit and the results.
l The audits were conducted by trained personnel not having direct
-
responsibility in the area being audited.
!
- Appropriate follow-up action via Nonconformance Activity Reports
, (NCAR) had been taken.
!
j The audited organization's response to the audit findings was in
! writing, was timely, and adequately addressed the findings and recommendation The inspector reviewed the licensee's long range audit schedules and
'
i sampled audit reports to verify that the frequency of audits was in
{ conformance with the Technical Specifications and the approved QA l program. The sampled audit reports were in the areas of operations, j maintenance, plant engineering, corrective actions, requalification
!
training, administration, and modifications / material control during the l 1984 and 1985 time period. These areas were in accordance with the l Technical Specifications and the approved QA program audit schedul _. _,_ _ _.,__,_-- ,_ _____._ _ _ _ _._ _ ,_,.._ __.__,_. _ ,_ __..~_ _,,_ _ _ ,_
. . . - .~ . - - . _= _. - -- . _.- ._ _ - _ - - _ - _ - _
,
i
!
. . . 5
i
j No violations or deviations were identified.
! Follow-up on Previous Inspection Findings I (Follow-up Item 85-11-01; Closed) Plant Review Board Evaluation
,
After Revision 28 of A0-7-6 Issued and PRB Engineer Onsite I
'
Due to the heavy administrative requirements put on the Plant Review Board (PRB) Chairman; a PRB engineer was added in March 1985 to the plant staff in order to administrative 1y help the PRB Chairman. The
! PRB engir.cer's functions were to coordinate PRB meetings, maintain I
{ status of PRB action items, status follow-up on active LERs, and l write LERs. The PRB engineer's action relieves the Nuclear ,
Engineer, the PRB Chairman, and the Office Supervisor of a large ,
amount of their administrative work.
Revision 28 to Administrative Order (AO)-7-6, issued August 2, 1985,
- presents a new event report form which will clarify and expand the PRB's role in plant events reportable or not and prevent
! reoccurrence of events and improve plant operational efficienc The inspector reviewed A0-7-6, Revision 28, and the PRB engineer functions and concludes that the PRB Chairman has been relieved of a l large portion of his administrative duties and that A0-7-6, Revision 28 expands the PRB's role in plant events reportable or no Follow-up item 85-11-01 is closed.
! (Follow-up Item 84-04-01; Closed) Consider Observations Regarding
'
Operator Requalification Program i The inspector verified that'the operator requalification program was being performed in accordance with the licensee commitments.
- Specifically, the proctors and licensed candidates have been given i instructions for appropriate action to be taken during the
- examinations. The examination material from brief notes to finished j type written exam was being kept under lock and key. The security
of examinations material appeared to be satisfactory. The annual
- evaluations of operators was being evaluated by management and steps taken to ensure substantive and~ meaningful material has been included. Oral examinations of operators were conducted by a
+
licensed SRO. The content of the oral exams included all requirements, and -an assessment of weaknesses for followup, j Followup Item 84-04-01 is closed.
I
! (Followup Item 84-05-05; Closed) Adequacy of Corrective Actions
,
to Audit Findings i
!
- A previous inspectors review disclosed that the licensee's audits j had identified similar weaknesses and that the underlying causes for
- these weaknesses had not been adequately evaluated and corrected as
- prescribed by Criterion XIII of 10 CFR 50, Appendix It was
!
l
!
_ . _ _ _ _ __ _. _ _ _ _ _ _ . _ . _ ._
- --- - _- . . .. . . - - . - . . - - .- - . - .-. - - . . - - -. _
,
'
. . 6
.
'
l j further emphasized that the licensee needed to evaluate the adequacy
, of existing procedures, with respect to assuring responses to audits f
have been reviewed and followed up in an effective and timely
,
manne .
The licensee's QA manager informed the previous inspector that an i evaluation would be performed and that policies would be established that will be consistent with the regulatory requirements.
The inspector reviewed Nuclear Quality Assurance Department i Procedure (NQAP)-107, Revision 8 entitled, " Control of Conditions Adverse to Quality and Corrective Action" and in which section 5.4,
,
Corrective Action Status requires on a monthly basis the cognizant
Organization Supervisors or Managers to identify changes to NCAR 1 corrective action completion date In addition, the QA Department
'
personnel review the NCAR status log on a monthly basis to assure j that it was complete and that NCARs were being resolved in an
adequate and timely manne Procedure NQAP-110, Revision 10 entitled, " Quality Assurance Audits"
, Section 5.8 " Audit Reports" requires the audited organization to define the corrective action taken to prevent recurrence, the root cause, and a scheduled date for the corrective action in the event
, that required corrective action cannot be completed within the j allotted time.
j Followup item 84-05-05 is considered closed.
j j (Generic Letter 85-05; Closed) Inadvertent Boron Dilution Events Generic letter 85-05 informs the licensee of operating pressurized
,
water reactors of the staff position resulting from the evaluation
! of Generic Issue 22, " Inadvertent Boron Dilution Events" regarding
! the need for upgrading the instrumentation for detection of boron
! dilution events in operating reactor In summary, while the NRC did not require operating plant backfits for boron dilution events
] at this time, the staf f would regard an unmitigated boron dilution
'
event as a serious breakdown in the licensee's ability to control l its plant, and strongly urged each licensee to assure itself that
,
adequate protection against boron dilution events exist in its j plants.
In memorandum JWL-201-85m, dated April 17, 1985 from J. W. Lentsch, i Manager of NSRD, to W. J. Orser, Plant Manager, the Nuclear Safety l and Regulation Department's (NSRD) evaluation of Trojan's designs
- and controls that minimize the likelihood of an inadvertent boron t
dilution event prompted the following recommendations:
- (i) Re-emphasize the potential for, and mitigation of, inadvertent boron dilution events in retraining. Training for Trojan i
Operations personnel should address the causes, indications,
.
and corrective actions for inadvertent boron dilution events,
! both at power and shutdown.
J
,
$
-,m- - . . * . - - - .. ,-e---.,----,4-.-e .- ...-.--..--rm-,.-,-m-..,---.,y~,--~~ .....--.----.-...-----r." e.r,,-,--.
.. .- . _ _ - . -
_ . .-._- _ -- - . .-- - -.
- . . 7
,
- ' (ii) Operations and Maintenance personnel retraining should address
'
maintenance practices similar to those outlined in MP-11-2,
" Decontamination of Steam Generator Channel Heads", that have
- the potential for boron dilutio !
j Additionally, this memo stated, plant simulator exercises performed 3 annually, may include CVCS malfunctions at power. The licensee's
{ response appears to be adequate and effectively protects the plant
against boron dilution event Generic Letter 85-05 is considered closed.
i
} (Other PJ-01-20; Closed) Inspect Fire Protection Modifications i- per Zwetzig Memo of January 15, 1982
(Other PJ-01-20; Closed) Items in SER Section 3.1 Complete
);
i (Other PJ-01-20; Closed) Complete Except Memo Para 2
l The NRC's Fire Protection Safety Evaluation Report (SER) dated j March 9, 1978, identified a number of modifications to plant
I programs, administrative controls, and equipment which were to be implemented by the licensee. Items in Section 3.1 entitled j " Modifications" of the SER were required by a licensee condition
.
(inserted by Amendment 22) to be installed by the end of the second l refueling outage. Completion of the Section 3.1 items was verified
, by the Senior Resident Inspector, as documented in Inspection j Report 80-21. Section 3.2 entitled, " Incomplete Items" of the SER,
as amplified by an SER supplement dated March 25, 1980, identified seven other items to be implemented as part of the fire protection j program. Examination of pertinent records, interviews with licensee
- personnel, and inspector observations confirmed that the items in j Section 3.2 had been complete '
!
The above items PJ-01-20 are considered close :
{ (Unresolved Item 85-23-02, Closed) LER 85-08 Cause of Occurrence j and Corrective Action by Licensee 1.
The inspector reviewed LER 85-08 with licensee personnel and i
discussed the licensee's actions concerning personnel error as a
! contributing cause to the LER. The' licensee agreed that it was also
, personnel error and that the term " inadequate administrative i control" meant personnel erro ;
i j Unresolved item 85-23-02 is considered closed.
' (LER 85-08 Reportable Occur, Closed) Inadvertent Safety Injection i
j The inspector reviewed LER 85-08 with licensee personnel as
- discussed in the above unresolved item, and determined that the
- licensee had reported the LER factually, determined the corrective actions necessary to prevent another occurrence, and implemented the
,
corrective action ,
L
-
h
. - _ , _ _ _ _ , _ . _ _ _ _ . . _ , _ . . . _ , . . . _ . . _ . . _ . _ , _ . _ _ _ _ . . _ _ . . _ . _ _ . . _ . , . . . . _ . _ . _ _ _ _ _ _ _ . _ _ , - . - , ,
. . ._ . -___ . _ _ _ _ _ _ _ _ . _ . _ - _ _ _ _ _.- .- _ _ _ . . _ _ . - . _ . _ _ _ . _ . . . - _ _ _ _ . _ - _ . . _ - - . _
., . . . 8 i
.
LE8t 85 08 is considered closed.
i i Exit Interview
j- The inspector met with the licensee representatives denoted in
'
,
paragraph 1 on September 13 and 27,1985, and summarized the scope and
'
findings of the inspection activitie ,