Category:INSPECTION REPORT
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification IR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245L1471989-08-0303 August 1989 Insp Rept 50-344/89-12 on 890522-0601.Violations Noted.Major Areas Inspected:Review of Licensee NDE Procedures,Nde Records,Radiographs & QA Documentation & NRC NDE Personnel Reperformed Sample NDE on Safety Related Sys & Components ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 1999-09-09
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification IR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245L1471989-08-0303 August 1989 Insp Rept 50-344/89-12 on 890522-0601.Violations Noted.Major Areas Inspected:Review of Licensee NDE Procedures,Nde Records,Radiographs & QA Documentation & NRC NDE Personnel Reperformed Sample NDE on Safety Related Sys & Components ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 1999-09-09
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification IR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245L1471989-08-0303 August 1989 Insp Rept 50-344/89-12 on 890522-0601.Violations Noted.Major Areas Inspected:Review of Licensee NDE Procedures,Nde Records,Radiographs & QA Documentation & NRC NDE Personnel Reperformed Sample NDE on Safety Related Sys & Components ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 1999-09-09
[Table view] Category:UTILITY
MONTHYEARIR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 IR 05000344/19890161989-06-28028 June 1989 Insp Rept 50-344/89-16 on 890514-0617.Unresolved Item Noted Re Appropriate Level of Review Necessary for Lower Tier Procedures.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Refueling Activities ML20245E6811989-06-0505 June 1989 Insp Rept 50-344/89-10 on 890326-0513.Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Event Followup & Open Item Followup ML20245D5851989-06-0202 June 1989 Insp Rept 50-344/89-14 on 890508-12.Violations Noted. Major Areas Inspected:Occupational Exposure During Extended Outage & in-office Review of Licensee Records IR 05000344/19890111989-05-30030 May 1989 Mgt Meeting Rept 50-344/89-11 on 890413.SALP Results for Dec 1987 - Dec 1988 Reviewed & Recent Plant Transient & Activities in Fire Protection & Outage Mgt Discussed IR 05000344/19890151989-05-26026 May 1989 Enforcement Conference Rept 50-344/89-15 on 890510.Major Areas Discussed:Concerns Identified in Security Team Insp Rept 50-344/89-02,Chemistry Team Insp Rept 50-344/89-07 & Special Insp Rept 50-344/89-13 IR 05000344/19890071989-05-23023 May 1989 Insp Rept 50-344/89-07 on 890417-21.No Violations Noted. Major Areas Inspected:Plant Chemistry Related Areas, Including Organization & Mgt,Qa Training & Qualifications, Water Chemistry Control & Analysis & Facilities IR 05000344/19890131989-05-19019 May 1989 Insp Rept 50-344/89-13 on 890409-29.Violations Noted.Major Areas Inspected:Licensee Activities Re Failure of Permissive & Interlock Features for RHR Sys Shutdown Cooling Suction Isolation Valve ML20246D8961989-04-19019 April 1989 Insp Rept 50-344/89-05 on 890212-0325.Violations Noted.Major Areas Inspected:Safety Verification,Maint,Surveillance,Event Followup,Design Engineering & Open Item Followup IR 05000344/19890061989-04-18018 April 1989 Insp Rept 50-344/89-06 on 890320-24.No Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings,Review of Lers,Followup on IE Info Notices,Mgt & Organization,Training & Qualification & Facility Tours IR 05000344/19890041989-03-23023 March 1989 Insp Rept 50-344/89-04 on 890228-0303.Violations Noted. Major Areas Inspected:Follow Up on Two Open Items & One Unresolved Item Identified During Previous Emergency Preparedness Insps & Emergency Preparedness Program ML20247G2151989-03-13013 March 1989 Insp Rept 50-344/89-01 on 890101-0211.Violations Noted.Major Areas Insepcted:Operational Safety Verification,Maint, Surveillance,Event Followup & Followup on Previously Identified Items IR 05000344/19890031989-02-10010 February 1989 Enforcement Conference/Mgt Meeting Rept 50-344/89-03 on 890126.Major Areas Discussed:Nrc Concerns Developed as Result of Insp of Commercial Grade Procurement,Per Insp Rept 50-344/88-46 & Licensee Efforts in Areas of QA Program IR 05000344/19880401988-11-0303 November 1988 Insp Rept 50-344/88-40 on 880807-1001.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19880441988-10-25025 October 1988 Mgt Meeting Insp Rept 50-344/88-44 on 881004.Major Areas Discussed:Concerns Developed as Result of Sept 1988 Reactor Trip & Subsequent Forced Outage Activities ML20154P6391988-09-16016 September 1988 Insp Rept 50-344/88-36 on 880808-12.Deviation Noted.Major Areas Inspected:Licensee Conformance to Reg Guide 1.97,Rev 3 ML20154N8951988-08-31031 August 1988 Insp Rept 50-344/88-39 on 880808-12.One Unresolved Item on Purchase & Use of Commercial Grade Items in safety-related Sys Identified.Major Areas Inspected:Commercial Grade Procurement & Pipe Support Design Verification IR 05000344/19880291988-08-31031 August 1988 Insp Rept 50-344/88-29 on 880619-0730.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Maint,Surveillance,Event Follow Up & Open Item Follow Up IR 05000344/19880311988-08-23023 August 1988 Insp Rept 50-344/88-31 on 880718-22.No Violations or Deviations Noted.Major Areas Inspected:Unresolved, Enforcement & Followup Items ML20151T4361988-07-29029 July 1988 Insp Rept 50-344/88-27 on 880627-0701.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Chemistry Controls,Control of Radioactive Matls & Contamination,External Exposure Control & Internal Exposure IR 05000344/19880261988-07-28028 July 1988 Insp Rept 50-344/88-26 on 880606-10 & 14-17.Violations Noted.Major Areas Inspected:Commercial Grade Procurement & Inservice Insp Activities IR 05000344/19880281988-07-25025 July 1988 Insp Rept 50-344/88-28 on 880711-15.No Violations or Deviations Noted.Major Areas Inspected:Followup on Previous Insp Findings,Review of Emergency Facilities,Equipment, Instrumentation & Supplies & Exam of Training Program IR 05000344/19880321988-07-25025 July 1988 Insp Rept 50-344/88-32 on 880711-15.No Violations Noted. Major Areas Inspected:Followup of Open Items & Written Repts of Nonroutine Events ML20151K5411988-07-12012 July 1988 Insp Rept 50-344/88-24 on 880508-0618.Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Event Follow Up & Open Item Follow Up IR 05000344/19880231988-06-30030 June 1988 Insp Rept 50-344/88-23 on 880510-26.No Violations or Deviations Noted.Major Areas Inspected:Specs for Emergency Operating Procedures IR 05000344/19880251988-06-16016 June 1988 Insp Rept 50-344/88-25 on 880516-31.No Violations Noted. Major Areas Inspected:Licensee Activities in Resolving Reactor Plant Pipe Whip Restraint Design Vs as-built Gap Discrepancies & Inservice Insp Ultrasonic Test Activities IR 05000344/19880201988-06-10010 June 1988 Insp Rept 50-344/88-20 on 880516-20.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings & Occupational Exposure During Extended Outages IR 05000344/19880151988-05-25025 May 1988 Insp Rept 50-344/88-15 on 880425-29.No Violations Noted. Major Areas Inspected:Evaluation of Design Bases of Diesel Generators,Review of Tests & Experiments Program & Review of QA Program of Measuring & Test Equipment IR 05000344/19880171988-05-23023 May 1988 Insp Rept 50-344/88-17 on 880418-21.Violation Noted.Major Areas Inspected:Licensee Fire Protection Program Implementation & Action on Previous NRC Insp Findings IR 05000344/19880181988-05-18018 May 1988 Insp Rept 50-344/88-18 on 880425-29.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Activities & Insp Procedures 30703,73051,37052,73753 & 73755 IR 05000344/19880211988-05-13013 May 1988 Mgt Meeting Rept 50-344/88-21 on 880422.Major Areas Reviewed:Salp Results for 861101-871130 & Discussion of Recently Developed Issues on Containment Isolation Valves IR 05000344/19880111988-04-27027 April 1988 Insp Rept 50-344/88-11 on 880329-31 & 0404-05.No Noncompliance Noted.Major Areas Inspected:Plant Water Chemistry Control & Chemical Analysis,Qa of Plant Chemistry Activities,Radiochemical Analysis & post-accident Sampling IR 05000344/19880121988-04-21021 April 1988 Mgt Meeting Rept 50-344/88-12 on 880325.Areas Discussed: Procedure & Maint Improvement,Outage Activities & Barton Pressure Transmitter Troubleshooting IR 05000344/19880101988-04-0707 April 1988 Insp Rept 50-344/88-10 on 880314-18.No Violations or Deviations Noted.Major Areas Inspected:Annual Review of Licensee Program to Handle Info Notices,Review of Procedures & Onsite Followup of Written Repts of non-routine Events ML20151C4741988-03-28028 March 1988 Insp Rept 50-344/88-04 on 880208-12 & 0229-0304.No Violation Noted.Major Areas Inspected:Licensee Action on Previous Findings,Organization & Mgt,Training & Qualifications,Solid Wastes,Transportation & Facility Tours IR 05000344/19880061988-03-0909 March 1988 Insp Rept 50-344/88-06 on 880222-26.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training & Followup Items & Followup Items of Noncompliance 1990-09-05
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site ML20202C2111999-01-21021 January 1999 Notice of Violation from Insp on 971207-10.Violation Noted: Licensee Did Not Perform Survey to Assure Compliance with 10CFR20.1902(d) IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning ML20199F0291998-01-15015 January 1998 Notice of Violation from Insp on 971201-03.Violation Noted: Licensee Failed to Ensure Adequate Survey of Certain Contaminated Tools IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl ML20210S7131997-09-0909 September 1997 Notice of Violation from Insp on 970721-24.Violation Noted: from 960923-970515,licensee Failed to Conduct Surveys Adequate to Evaluate Quantity of Radioactive Matl Released from Radiological Controlled Area IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program ML20135B7491997-02-25025 February 1997 Notice of Violation from Insp on 970204-06.Violation Noted: Licensee Had Not Audited Annual Radiological Environmental Report TS 6.9.1.5.1 Since 890519 IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept ML20059A1421993-12-15015 December 1993 Notice of Violation from Insp on 930930-1112.Violation Noted:Detailed Construction Package 1 Associated W/Request for Design Change 78-103,installed in May 1980,did Not Correctly Translate Design Basis Into Applicable Procedures IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items PNO-V-93-002, on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased1993-01-13013 January 1993 PNO-V-93-002:on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items ML20127E9461993-01-0808 January 1993 Notice of Violation from Insp on 921027-1207.Violation Noted:Licensees Corrective Actions Not Effective in That,On 921112 & 15,access Doors to Plant Issue Warehouse Not Controlled by Authorized Personnel PNO-V-93-001, on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media1993-01-0404 January 1993 PNO-V-93-001:on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification PNO-V-92-038, on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety1992-12-0808 December 1992 PNO-V-92-038:on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety PNO-V-92-037, on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart1992-12-0101 December 1992 PNO-V-92-037:on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart ML20126E9101992-11-25025 November 1992 Notice of Violation from Insp on 920915-1026.Violation Noted:Supervisor Informed of Receipt of a Nonconforming Component,Chlorine Detector & Did Not Initiate an Ncr ML20126E9131992-11-25025 November 1992 Notice of Deviation from Insp on 920915-1026.Deviation Noted:Containment Air Locks Not Tested Using Pressure Decay Method IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities PNO-V-92-004, on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 9202271992-02-25025 February 1992 PNO-V-92-004:on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 920227 IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification PNO-V-91-002, on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable1991-03-0505 March 1991 PNO-V-91-002:on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable ML20062F9301990-11-0808 November 1990 Notice of Violation from Insp on 900902-1006.Violation Noted:Temp of Train B Component Cooling Water Pump (ASME Code Class 3 Pump) Taken W/Instrument W/Scale More than Three Times Ref Value of Bearing Temp PNO-V-90-045, State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference1990-11-0707 November 1990 PNO-V-90-045:State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference 1999-09-09
[Table view] |
Inspection Report - Trojan - 1985028 |
---|
|
|
Text
. . . . ... . _ _ . . .. .
<
, ,
, .-
-
-
, ,
"
. , ,
-
,
_
. s -
,
.
~
rU. S.,NUCIEAR REGULATORY COMMISSION
, , : s
!
't
'
- ,
REGION V ,.
..
Report N '
, '50-344/85-28=
, Docket N ,
'
License N NPF-1
, . .
Licensee: Portland General Electric Company 121 S. W. Salmon Street
'
, Portland, Oregon 97204_- ,
Facility Name: Trojan ,
. Inspection at: Rainier, Oregon *
- Inspection conducted
- October 14-18,.1985
Inspectors: b Om G- n/u/95 K. M. Prendergast, Emerghncy Preparedness Analyst Datd Signed
.
R O e Co_
GbM. Teikple, Emdtgency Preparedness Analyst n l2siss-Date Signed i Team Members: M. Good, Comex G. Stoetzel, Pacific Northwest Laboratories
' Approved By: L //! b R. F. Fish', Chief Dhte signed-Emergency Preparedness Section -
,
Summary:
Inspection on October 14-18, 1985~(Report No. 50-344/85-28)
Areas Inspected: Announced inspection of the emergency preparedness exercise and associated critiques, follow-up on corrective actions resulting from previous exercises / drills, and a review of Information Notice Nos. 85-44 and
=
'
85-62. This' inspection involved approximately 181 hours0.00209 days <br />0.0503 hours <br />2.992725e-4 weeks <br />6.88705e-5 months <br /> onsite by two NRC inspectors and two contractor team members. Inspection Procedures 82301 and 92717 were use Results: No significant' deficiencies or violations of NRC requirements were identiffe ,
,
-
~
i-0512130332 851126 PDR ADOCK 05000344 G PDR s ~ . -
,
$ \
.
+
DETAILS Persons Contacted ' - *T. Walt, Manager, Radiological, Engineering Branch ~
S. Orser, Plant Manager
'
'.~
- B. Sherman, Nuclear Engineer ,
- J. Thale, Senior Nuclear Engineer- .
T. Meek, Radiation Protection Supervisor, ,
G. Bailey, Training Specialist' ;
J. Fisher, Mechanical Engineer v
'
- Those present at exit interview.
, Follow-up on Regional Outstanding Items List l
l Closed, IN-85-44: Emergency Communications System _ Monthly Test. The
! inspector reviewed Information Notice 85-44 and records of required
!
monthly communication tests. From this review it was determined that the l licensee had conducted an appropriate assessment of the related t
activities report upon receipt of IE Notice 85-44. This assessment resulted in minor procedural changes, including testing requirements for the health physics network (HPN) circuit. The Emergency Notification l System (ENS) testing requirement was previously in place and was j satisfactory. The licensee's investigation and evaluation of IE Notice 85-44 and resulting changes appear adequate. The review confirmed that
'
l the emergency communications system monthly tests were conducted in l accordance with Trojan implementing procedure EP-16. This item is
! considered closed.
!
l Closed, IN-85-62: Backup telephone numbers for the NRC Operations Center. IE Information Notice 85-62 provides commercial telephone numbers for NRC Headquarters to-be used by the licensee as backup numbers in case of ENS and/or HPN circuit failure. The licensee conducted an evaluation and prepared an operational assessment report which resulted in procedural changes that incorporated the NRC Headquarter's commercial telephone numbers. Stickers were provided with the NRC Headquarters
!
numbers and have been affixed to NRC phones in the emergency. response
!
facilities. Licensee action on this item appears adequate. This item is considered close No violations or deviations were identified in the review of this program area.
I j Corrective Action on Items Identified During Drills and Exercises
!
The licensee's method for correcting items identified during drills and exercises was examined. The following describes the licensee's method.
l .
! The Emergency Planning Group has established a computerized system
!
identified as the computerized commitment tracking list (CTL) for l tracking items identified during drills / exercises that require i corrective action. The list was started in January 1985 and r
l
,
-
--u - , . - , , , g
- -r -- ,
s
'
.
a g %
\ \
contains all emergency preparedness g en items from 1983 to the
'
presen b .~ ManagementandEmergencyPlanningpersonnelddterminewhichitems will be tracked on the CTL. Items not. tracked on the CTL are addressed in a memo which discusses the rearaXs) they were omitite Each open item is given a trackung number by tne CTL operato Information on the CTL printout includes: tracking number, title, person responsible for tracking the item, person who wd1 pe i form the. action (s) necessary to close out the item, a space for -
describing how the item was closed ouf, and refetence documents confirming close out, action dates, and status (open or closed).
/t -
A review of the 1984 exercise documentation, including the medicalg portion, was performed. The review indichted that comments from State, local and Federal agenciesnore considered ard were either a.idressed in a memo or were tracked N the CT '
- , ,
A number of items on the CFL which part identified at c1gsed were examined. Most of the items-reviewed appeared 't'o be closed out in an appropriate manner; however, one item appeared to be clprgd upon the r scheduling of training and not the completion of traini 3g. .
The information in -the CTL referred 'the usc<- to the documentation which ,
closed out the. item. This item (number 00168), which invo)ved writing a N new dose assessment program and prgviding for the' apociafed training, ,
appeared to be closed prematarely. The code had been west'.en and ,w documented,however,n(talloftheoperatorshadre'celveatheir \
training, as it will be part of their normal annualiretraining. As a \i result of discussing this' item, the licensee stated 'ihar they would reopen it until the traioing'30s 'been conplete ,
.
. x s , s Fromthereviewofthelicensee's'b.etthf,Mrcohectigitepsidentified
~
during drills and exercises, it apps:at s that the licensee has an adequate
'
method for the tracking and resolving waknessh.s so' 'Gentified. However, the licensee should consider the .need to have 'all phtinent training -
completed prior to closing out an ite ( r:-
i '
-
V No violations or deviatJcns were identified in the re @( g Af this program are 'T +
'
e . Emergency Exercise Plahning y ,
s b *,, , .,
The licensee's Radiological Engineering Branch has the Jespon @ ilityafor assuring that the annual emergency exercise is conducted. A member of the Branch staff was assigned to act. as the Lead Controller with the "
-
responsibility of developing the sfenarip package;and conducting the exercise. The Lead Controlley was: assisted by pJrsonnel with expertise in radiological engine @g,7 nactor opeptions, and health #vsics. q'
Personsit.volvedinthescenhciodevelopment.werenotdirectlyMvolycl in the exercise. The Fhgineering Group in concert wig.h particip1ti outside agencies established the exercisc objectives. NRC Reufon 7 and FEMA Region X were provided with an opportunity to comment on the ". .
proposed objectives. The exercise document, generated under the -
'
-direction of the Leadj Controller, (ncluhed 'N the pbjectives, the p)erci
'
- /r\ vp
^
}' ,s
'
'4 s tys 5 T
, N ,
, A \q m- _ _ _ _ - . - - . - . _ - _ _ -- -
_ .
limitations, player information (guidelines), the exercise scenario, messages to be used during the exercise, initial and subsequent plant parameters, meteorological and radiological data, and controllers / evaluators instructions and work sheets. The exercise document was tightly controlled prior to the exercise. The scenario package was distributed to the controllers several days before the exercise to ensure that the controllers were sufficiently familiar with the scenario and events in their individual areas of review. The players did not have access to the exercise document or information on the scenario event. Advance copies of the scenario package were also provided to the NRC observers. This emergency preparedness exercise was intended to meet the requirements of IV.F.3. of Appendix E to 10 CFR 5 Controllers / Evaluators were stationed at each of the licensee's Emergency Response Facilities (ERFs), e.g. Control Room (CR), Technical Support Center (TSC), Operations Support Center-(OSC), Emergency Operations Facility (E0F), and the Company Support Center (CSC).
Controllers / Evaluators were also dispatched with repair / monitoring team All controllers acted as evaluators and had knowledge of the activities they were evaluating. The final briefing of controllers was conducted on October 11, 1985. The contents of the exercise document were discussed in detail at this briefing. The NRC was briefed on the scenario on October 14, 1985, during which clarifications were made on the scenario and the amount of simulation that would be allowed during the exercis All of the NRC observers were present during this latter briefin ,
No violations or deviations were identified in the review of this program are . Exercise Scenario The exercise scenario started'with the declaratio'n of an unusual event (UE) and ultimately escalated to a general emergency (GE) condition. The initiating event, which occurred at approximately~8:00 a.m., was excessive reactor coolant system (RCS) leakage greater than the Technical Specification limit. The scenario developed into an Alert at 8:30 when reactor coolant pump seal leakage increased to 60 gallons.per (
_ minute. Approximately one hour.later, the only operable reactor coolant
[i pump became inoperable which caused RCS pressure to' increase to 2635 psia and resulted in a mass breakage of rod cluster" control assemblies (RCCA)
split pins. The reactor remained critical due to failure of control rods to fully insert and the pressurizer-PORV and safety valves opened. This resulted in a site area emergency (SAE). A short time later, reactor coolant system pressure began to fall, one pressurizer safety valve remained open and the primary system began to suffer a net loss of inventory. The "A" centrifugal charging pump deadheaded and in fifteen minutes burned itself ou At this time emergency boration had stopped and a GE was declared. Soon thereafter containment pressure increased, RCS inventory was lost to containment and a major radioactivity release to the environment began as containment integrity was lost through a leaking electrical penetration. Approximately one hour later, corrective actions'resulted in containment pressure and reactor coolant system temperature decreases. Emergency boration maintained the core in a
.
(
'
suberitical state and the reactor was brought to a safe condition. This terminated the exercis . Federal Observers ,
!
Five NRC inspectors evaluated the lictnsee's response to the scenari The NRC observed activities in the CR, TSC, EOF, OSC, and CSC. The NRC inspector assigned to the OSC also accompanied a field monitoring team for the purpose of evaluating their performance. FEMA observed the i
'
offsite portion of the response to the scenario and their findings will be issued in a separate report from that agenc ,
7. Control Room The following aspects of CR operations were evaluated: detection and classification of emergency events,' mitigation, notification, and protective action recommendations. The following are NRC observations of ,
the CR activities, The notification of State, local, and Federal authorities was timely for the unusual event and alert classification Procedures were broken out and referenced for all plant Emergency Plan action The specific wording in Table 1-4 of Procedure EP-1 caused a delay of about 11 minutes in'the declaration of the UE. The wording was not consistent with the guidance in Appendix 1 of NUREG-0654, Rev. 1. The licensee may find it beneficial to review Table 1-4 in light of the guidance stated in NUREG-0654, Appendix 1, Emergency Action Level Guidelines for Nuclear Power Plants, to ascertain if changes are neede (0 pen 85-28-01) , There were no routine plant status announceae'nts wade on the plant public address (PA) system. The use of this sys.em for safety messages and to keep plant personnel informed of plant evolutions is encouraged. It is recognized that this action may need to be
'
simulated during an, exercise when the plant is operatin There was no formal log keeping evident in th'e CR (nuaerous scratdh pad logs were being kept; however, not all entries referenced time).
Formal documentation was also noted to be lacking in the TSC. A *
review of the requirements for formal documentation of an emergency event is suggested to determine whether some changes may improve record keeping. The importance of records in reconstructing the emergency event may warrant a specific objective in this area for the next exercis (85-28-02) [
No violations or deviations were identified in the review of this-program are '
, y f
. e y
, . -5
,
'I f
8. , Operations Support Center The following aspects of OSC operations were observed: Activation, functional capabilities, the dispatching of various inplant teams,
_
coordination with the TSC, and.the observation of an offsite field. tea The following are NRC observations of the OSC' activitie There were a number of problems observed in the OSC, -som'e of which may be related to the physical size of the OSC (too small to accommodate the number of personnel required to assemble in the OSC). The following are examples of these problem (i) There does not appear to be a formal method of tracking team location or progress. On one occasion, the OSC Manager, when
'
questioned by the Shift Manager, had to spend considerable time
'
checking whether he had a team in the field rather than referring to a team status lo ,
(ii) One team appeared to self-evacuate which gives the impression they were not kept informed or controlled by the OS \
(iii) Status boards were not consistently maintained, some entries had times and some did not, some entries were merely inserted with little regard for actual time of occurrenc (iv) Team briefings did not always appear to include preferred ALARA routes, hazard warnings, procedures to use, check back instructions, etc. A brief checklist and a basic plant diagram might assist the OSC Manager in conducting such briefing (v) During the evaluation of the offsite field team, field team kits were observed to contain respirators and iodine cartridges; however, the procedure (EP-12) did not address any
'
guidance on when to use the respirators. The licensee may find j . it beneficial to address guidance on the use of respirators in this procedur (Open, 85-28-03)
(vi) Some field team controller inputs appeared to take the form of prompting. This may have hampered the evaluator's ability to determine that adequate capabilities were being exhibited. The subject of prompting should be covered during the
, controller / evaluator briefing and controller / evaluator
<
, trainin '
,1 i-~ , .
The licensee is encouraged to evaluate whether the existing OSC is capable of supporting its responsibilities during an emergency. The licensee should also examine the possibility that another location may be preferable. This item will be classified as an open ite (Open, 85-28-04)
No violations or deviations were identified in the review of this program are t,
6- ,
>
f ',
.
, - Technical Support Center The following aspects of TSC operations were observed: activation, accident assessment / classification," dose assessment, notification, and support of the Control Room in their efforts to mitigate the consequences of the accident. The following are NRC; observations of the TSC activitie ,
~ The TSC was . activated in ,a timely manner and appropriate and timely protective action recommendations we.re made to the offsite-authoritie , Some notifications to the NRC as required by.50.72(a)(i), were not timely. Specifically, a SAE was classified at 9:06 a=.m., and a GE was classified at 9:10 a.m.;~however, notifications to.the NRC were not attempted until 10:10 a.m.' This time frame is in excess of the requirement contained in 50.7 Although prompt notifications of State and local authorities were made, it was observed that these two notifications (SAE and GE) to the NRC were merely forgotte This item is considered an open item in order to review th licensee's evaluation to insure timely notification is made to the NR (Open, 85-28-05) During the evaluation of the TSC and the OSC field team, problems were observed in air sample analysis. The individuals operating the SAM-2 did not appear to be familiar with that particular piece of counting instrumentation and at one location an outdated procedure was used. In addition, poor contamination control practices were observed (no gloves were used to remove the cartridge from the air sampler and the filter and cartridge were not put in plastic to prevent contaminating the detector). It was also noted that the samples were not properly labeled with time, date and locatio There is a need to review this area to assure that training,
. procedures, and equipment are adequate for air sample collection and analysis. This iteo will be classified as an open ite (0 pen, 85-28-06)
No violations or deviations were identified in the review of this program area.
.
10. Emergency Operations Facility The following aspects of EOF operations were observed: Activation, functional capabilities, offsite dose assessment and interface with offsite officials. The following are NRC observations of the EOF activitie I There appears to be an excellent interface between the utility staff and the personnel of offsite agencie During~ the observation of.the activation of the EOF the security and badging of the EOF appeared unorganized. Perhaps one entrance for i badging would cause less confusion. . _ .
.
-
. There were numerous problems observed in the EOF, all relating to its layout. Although the Trojan visitor information center appears to be capable of functioning as an EOF, some consideration should given to improving the layout. It should be noted that a new EOF is scheduled. The time frame for completion of the new EOF should be considered when determining what short term changes could be accomplished to increase the effectiveness of the EOF in the interi (0 pen, 85-28-07)
The following are examples of the problems observed by the NRC evaluators:
(1) Work spaces were considered too smal (2) Having most of the phones in one central location is loud and distracting. Several communicators were observed to have trouble hearin (3) The comfort of the EOF staff should be considered. Many individuals were observed to be working on their knees. This may have an adverse impact on the operation of the EOF during a prolonged even (4) Emergency procedures did not appear to be stored, broken out, and consistently used in the EOF. It appeared that some individuals brought their own procedures, a practice that might lead to the use of outdated or unapproved procedures if appropriate controls are not applied. The licensee should examine this area to assure themselves proper procedures are available and use . No violations or deviations were identified in the review of this program are . Company Support Center The following aspects of CSC operations were observed: Activation, logistical support of the plant, good communication and coordination between the CSC, the TSC and the EOF. There were no-problems observed at this facilit >
No violations or deviations were identified in the reviev.of this program are .
'
'
12 .' Critiques s The licensee held a formal critique on October 17, 1985,- the day following the exercise. The purpose of this critique was to summarize
'the findings of the exercise and to ' discuss weaknesses'or: deficiencies identified. The following represent some-of the licensee's findings that were discussed during this meeting.- ,' -
-
,
There were numerous scenario problems observed and a more formal
~ review of the scenario by operations should be, performe .
%
_. -
.
.
b. Notification for the UE and alert was timely from the Control Room; however, notification for the SAE and GE to the NRC was not as required by procedures or regulations, c. There were problems observed in the performance of air sampling in the TSC and by the offsite monitoring tea d. Status boards were noted to be improved over last year; however, there is still room for improvemen e. The use of the TSC computer enhanced the licensee's ability to transfer data; however, problems associated with the computer were also observe f. There were numerous problems observed in the OSC indicated by the following comments:
(1) The OSC was observed to be crowded and congeste (2) The repair / monitoring team briefings could be improve (3) There did not appear to be sufficient supplies available in the OSC. One narticular problem appears to ba an insufficient number of SCBAs available for OSC personne (4) Improvements to visual displays.in the OSC should be accomplishe (5) The operations personnel:would be unable to get to the Hagen Racks when the OSC was fully activated with a_ full compliment of team .
(6) There did not appear to be"any ardas to hang status board (7) There were high noise leve'Is which affected the operation of the OS ~ *
g. Therewasaninconsistent-amountofsimulation' allo [wedfrom, controller to controlle h. The licensee's public' address system"cou'd I be'effect'ively used to keep plant personnel informed of' safety and/or plant evolution i. There were several communication path's observed showing different data, this may have caused confusio j. The OSC phone to the Radiation Safety personnel at access control is located at the east end of the 93-foot level OSC while activity is at the west en k. A briefing sheet for the OSC Manager would facilitate information transfer to repair / monitoring teams, i
.
-
. When the 45' OSC was evacuated to the 93' Hagen Rack area, the latter area was very congeste The exercise demonstrated a need for a warehouse parts person to be stationed in the OS There appeared to be a lack of communication between the OSC and the PASS team in the sampling area. Also, the scenario did not fully test the PASS team capabilities, i.e. sampling with an airborne proble In addition when the PASS team left the 45' OSC they left their SCBAs behind, when they could have been used in the 93' OS Improvements are needed in field. team communications. -The following ~
problems were observed.~ ,
~
(1) Field teams were not kept informed of plant evolutions or activitie . ,;
~
(2) Field teams should only report their. coordinates- for location not other landmarks or roads which ties ~up;the radios and provides no additional useful information on location.t , -
. . . . ,
'
(3) More emphasis should'be placed on field' team results in-confirming dose projection , l
< ,
(4) Field team departure was delayed because the.the. field team
~
could not get access to equipment and some equipmcnt'was
~
~
missin , ,
(5) Procedure EP-12 should reference backup counting equipment in-the event the Sam-2 is inoperabl . Exit Interview -
The exit interview was held on October 18, 1985. In addition to Paragraph 1, the attachment to this report identifies some of the licensee personnel present at this meeting. The NRC was represented by five evaluator team members. During this meeting, the licensee was informed of the preliminary findings of this inspection and that these findings are subject to discussion and approval by Regional Managemen There were no violations of NRC requirements specifically identified during this inspection. There was, however, concern expressed over the untimely notification to the NRC and it was classified as an unresolved ite In addition, a number of open items were identified that will be tracked during the routine inspection program. The licensee noted that during a real emergency an open ENS line would have been established prior to the SAE and timely notifications of the SAE and GE would have been made. Subsequent to this inspection it was determined that because this was only an exercise there,was no violation of the 50.72 notification requiremen In addition,'the.following items were specifically discussed during the exit interview:
.
- - . - - - - , - - - - _ _ _ - - - - - - - - - _ _ - - , - - - - - - - - - - - - - , , - - - _ . _ - - - - - - - - , - - - - , - - - - - . , - - - - - - - . - - - - . - - - - - - - _ _ . - - _ - - - - - - - - - - - - - - - - - - - - - - - - . - - - - - - - - - - - , _ - - - - _ _ - - - _ - _ . - _ - - - - - - - - - , - . -
-
10 ,
.- J
,
L
,
,
a. There were numerous problems.obse ved in the'0SC; possibly because of the limited size of the facil'ty'and i of the congestion.in the facility. The licensee was, encouraged to evaluate the adequacy of the present OSC location toLsupportfits'rolevin an emergency and to
,
determine what corrective. actions are required to resolve the problems observe b. Formal documentation of the accident,.which would be vital for reconstructicn during a real event, did not appear to be maintaine The licensee should evaluate this area during drills / exercises, to assure themselves that such documentation will be accomplishe This area should be evaluated during the next scheduled emergency preparedness exercis c. It was the general impression of NRC evaluators in the EOF that the layout of the EOF could be improved. It was acknowledged that the location of the EOF is to be changed; however, depending on the date of completion for the new EOF, the licensee was urged to determine if some short-term changes can be accomplished to increase the effectiveness of the EO In addition, the licensee is encouraged to request an advanced NRC review of the plans for the new EO This review could possibly expedite the approval of this facility, d. The scenario proceeded very rapidly from the UE to the termination of the exercise. This action may have deterred the licensee's ability to adequately respond to all problems portrayed in the scenario in_as complete a manner as they would have preferred. This also made it very difficult to evaluate all of the licensee's capabilities. The licensee should consider an exercise with a longer time frame to fully demonstrate their capabilitie e. Other items specifically discussed during the exit interview are contained within the body of this report in Sections 2 through 1 e 3f
. . - . . -. - . . - . . . . _ - - .. . .
-
, , ..
,
,
,
'
' Attachment
'
Qe '
,
.
Exit Intervi$w dttendees
,
Portland General Electric- >
,
-
B. Withers, Vice President Nuclear _ , . W P. Yundt,' General Manager, Technical Functi'o'ns J. Lentsch,' Manager, NSRD. 4 '
. B.Schmitt, Manager,.0p'erations..andMainte'nanc$.
J B.' Susee, Operation Supervisor * ' ,
D. Keuter, Manager of Technical Services .
.
,
T. Meek, Radiation Protection Supervisor ,
, - B. Babcock, Public. Relations, PGE, , ,
N
- M. Snook,-Quality' Assurance Supervisor'
'
' S. Nichols, Training Supervisor ; ,
State of Oregon
. H. Moomey, Oregon Department of Energy, Resident Inspector i