Category:INSPECTION REPORT
MONTHYEARIR 05000259/20240112024-12-26026 December 2024 Biennial Problem Identification and Resolution Inspection Report 05000259/2024011, 05000260/2024011, and 05000296/2024011 IR 05000260/20240912024-11-21021 November 2024 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letter NRC Inspection Report 05000260/2024091 IR 05000259/20240102024-11-12012 November 2024 Design Basis Assurance Inspection Program Inspection Report 05000259/2024010 and 05000260/2024010 and 05000296/2024010 IR 05000259/20240032024-11-0404 November 2024 Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information IR 05000260/20244012024-04-10010 April 2024 Security Baseline Inspection Report 05000260/2024401 and 05000260/2024401 and 05000296/2024401 IR 05000259/20230062024-02-28028 February 2024 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1, 2 - Report 05000259/2023006, 05000260/2023006 and 05000296/2023006 IR 05000259/20230042024-02-0606 February 2024 Integrated Inspection Report 05000259/2023004; 05000260/2023004 and 05000296/2023004 IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 IR 05000259/20234022023-06-12012 June 2023 – Material Control and Accounting Program Inspection Report 05000259 2023402, 05000260 2023402 and 05000296 2023402 IR 05000259/20230912023-05-0808 May 2023 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter; NRC Inspection Report 05000259/2023091 IR 05000259/20230012023-05-0303 May 2023 Integrated Inspection Report 05000259/2023001, 05000260/2023001 and 05000296/2023001 IR 05000259/20234402023-03-23023 March 2023 – Special Inspection Supplemental Report 05000259 2023440 and 05000260 2023440 and 05000296 2023440 Cover Letter IR 05000259/20234012023-03-0808 March 2023 – Security Baseline Inspection Report 05000259 2023401 and 05000260/2023401 and 05000296/2023401 IR 05000259/20230902023-03-0202 March 2023 NRC Inspection Report 05000259/2023090 and 05000260 2023090 and Preliminary White Finding and Apparent Violation IR 05000259/20220062023-03-0101 March 2023 Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 Report 05000259/2022006, 05000260/2022006 and 05000296/2022006 IR 05000259/20220042023-02-0707 February 2023 Integrated Inspection Report 05000259/2022004, 05000260/2022004 and 05000296/2022004 IR 05000259/20220032022-11-0909 November 2022 Browns Perry Nuclear Plant - Integrated Inspection Report 05000259/2022003, 05000260/2022003 and 05000296/2022003 IR 05000259/20220122022-09-20020 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000259 2022012, 05000260 2022012 and 05000296 2022012 IR 05000259/20220112022-09-16016 September 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000259/2022011 and 05000260/2022011 and 05000296/2022011 IR 05000259/20224022022-09-0606 September 2022 Security Baseline Inspection Report 05000259/2022402 and 05000260/2022402 and 05000296/2022402 Cover Letter IR 05000259/20220052022-08-30030 August 2022 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 Report 05000259/2022005, 05000260/2022005 and 05000296/2022005 IR 05000259/20220022022-08-0808 August 2022 Integrated Inspection Report 05000259/2022002, 05000260/2022002 and 05000296/2022002 IR 05000259/20224202022-07-19019 July 2022 – Security Baseline Inspection Report 05000259/2022420, 05000260/2022420 and 05000296/2022420 ML22181A9562022-06-29029 June 2022 Bf Report 2022-401 Base Public Cover Letter ML22173A1622022-06-21021 June 2022 Replacement Steam Dryer Visual Inspection Results (U3R20) IR 05000259/20220012022-05-12012 May 2022 Integrated Inspection Report 05000259/2022001, 05000260/2022001, 05000296/2022001 and Exercise of Enforcement Discretion IR 05000259/20220102022-03-30030 March 2022 Triennial Fire Protection Inspection Report 05000259/2022010 and 05000260/2022010 and 05000296/2022010 and Apparent Violation IR 05000259/20224012022-03-0808 March 2022 Information Request for the Cyber-Security Baseline Inspection Notification to Perform Inspection 05000259/2022401; 05000260/2022401; 05000296/2022401 IR 05000259/20210062022-03-0202 March 2022 Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 (Report No. 05000259/2021006, 05000260/2021006 and 05000296/2021006 IR 05000259/20210042022-01-31031 January 2022 Integrated Inspection Report 05000259/2021004, 05000260/2021004 and 05000296/2021004 IR 05000259/20214032022-01-19019 January 2022 NRC Inspection Report 05000259/2021403, 05000260/2021403 and 05000296/2021403 IR 05000259/20214022022-01-18018 January 2022 Brows Ferry Nuclear Plant - Security Baseline Inspection Report 05000259/2021402 and 05000260/2021402 and 05000296/2021402 IR 05000259/20210032021-11-0909 November 2021 Integrated Inspection Report 05000259/2021003, 05000260/2021003, 05000296/2021003 and 07200052/2021001 IR 05000259/20214012021-08-31031 August 2021 Security Baseline Inspection Report 05000259/2021401 and 05000260/2021401 and 05000296/2021401 IR 05000259/20210112021-08-24024 August 2021 Temporary Instruction 2515/TI-193 Inspection Report 05000259/2021011, 05000260/2021011, and 05000296/2021011 IR 05000259/20210052021-08-23023 August 2021 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2, and 3- Report Nos. 05000259/2021005, 05000260/2021005 and 5000296/2021005 ML21217A2832021-08-0505 August 2021 Resident Integrated Inspection Report 2021-002 2024-09-03
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000259/19990041999-08-23023 August 1999 Insp Repts 50-259/99-04,50-260/99-04 & 50-296/99-04 on 990613-0724.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000259/19990031999-07-0808 July 1999 Insp Repts 50-259/99-03,50-260/99-03 & 50-296/99-03 on 990502-0612.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering,Plant Support & Licensee bi-annual Emergency Preparedness Exercise IR 05000259/19990021999-05-28028 May 1999 Insp Repts 50-259/99-02,50-260/99-02 & 50-296/99-02 on 990321-0501.Four Violation Noted & Being Treated as non-cited Violations.Major Areas Inspected:Aspects of Licensee Operation,Maint,Engineering & Plant Support IR 05000259/19990011999-04-15015 April 1999 Insp Repts 50-259/99-01,50-260/99-01 & 50-296/99-01 on 990207-0320.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support.Also Insp,Licensee Emergency Preparedness & Security Programs IR 05000259/19980091999-03-0505 March 1999 Insp Repts 50-259/98-09,50-260/98-09 & 50-296/98-09 on 981227-990206.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support Re Plant Security IR 05000260/19980111999-01-30030 January 1999 Insp Repts 50-260/98-11 & 50-296/98-11 on 981116-1204. No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000259/19980081999-01-25025 January 1999 Insp Repts 50-259/98-08,50-260/98-08 & 50-296/98-08 on 981115-1226.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000259/19980071998-12-0909 December 1998 Insp Repts 50-259/98-07,50-260/98-07 & 50-296/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000259/19980061998-11-0202 November 1998 Insp Repts 50-259/98-06,50-260/98-06 & 50-296/98-06 on 980823-1023.Violation Noted.Major Areas Inspected:Operation, Maint,Engineering & Plant Support IR 05000259/19980121998-10-22022 October 1998 Partially Withheld Insp Repts 50-259/98-12,50-260/98-12 & 50-296/98-12 on 980928-1002.No Violations Noted.Major Areas Inspected:Plant Support,Physical Security Program for Power Reactors IR 05000259/19980051998-09-18018 September 1998 Insp Repts 50-259/98-05,50-260/98-05 & 50-296/98-05 on 980712-0822.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000259/19980041998-08-0707 August 1998 Insp Repts 50-259/98-04,50-260/98-04 & 50-296/98-04 on 980524-0711.No Violations Noted.Major Areas Inspected: Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000259/19980031998-06-16016 June 1998 Insp Repts 50-259/98-03,50-260/98-03 & 50-296/98-03 on 980412-0523.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support.Addl Rept Includes GL 89-01 Implementation of Motor Operated Valve ML18039A3481998-05-0505 May 1998 Insp Repts 50-259/98-02,50-260/98-02 & 50-296/98-02 on 980301-0411.Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support IR 05000259/19980011998-03-24024 March 1998 Insp Repts 50-259/98-01,50-260/98-01 & 50-296/98-01 on 980118-0228.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18039A2531998-02-12012 February 1998 Insp Repts 50-259/97-12,50-260/97-12 & 50-296/97-12 on 971207-980117.Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18039A2331998-01-0202 January 1998 Insp Repts 50-259/97-11,50-260/97-11 & 50-296/97-11 on 971026-1206.Violations & Deviations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML18038C0041997-11-24024 November 1997 Insp Repts 50-259/97-10,50-260/97-10 & 50-296/97-10. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint,Plant Support,Radiological Controls & Fire Protection ML18038B9791997-10-0808 October 1997 Insp Repts 50-259/97-09 50-260/97-09 & 50-296/97-09 on 970803-0913.Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18038B9441997-08-29029 August 1997 Insp Repts 50-259/97-08,50-260/97-08 & 50-296/97-08 on 970622-0802.Violation Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support IR 05000259/19970061997-07-21021 July 1997 Insp Repts 50-259/97-06,50-260/97-06 & 50-296/97-06 on 970602-06.Violations Noted.Major Areas Inspected.Observation & Evaluation of Biennial Emergency Preparedness Exercise ML18038B9181997-07-17017 July 1997 Insp Repts 50-259/97-07,50-260/97-07 & 50-296/97-07 on 970511-0621.Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000259/19970051997-06-0505 June 1997 Insp Repts 50-259/97-05,50-260/97-05 & 50-296/97-05 on 970330-0510.Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support IR 05000259/19970031997-04-22022 April 1997 Insp Repts 50-259/97-03,50-260/97-03 & 50-296/97-03 on 970216-0329.No Violations Noted.Major Areas Inspected:Maint, Engineering & Plant Support IR 05000259/19970011997-03-11011 March 1997 Insp Repts 50-259/97-01,50-260/97-01 & 50-296/97-01 on 970105-0215.No Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML18038B8151997-01-27027 January 1997 Insp Repts 50-259/96-13,50-260/96-13 & 50-296/96-13 on 961124-970104.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000259/19960111996-10-0606 October 1996 Partially Withheld Insp Repts 50-259/96-11,50-260/96-11 & 50-296/11 on 960923-25 (Ref 10CFR73.21(c)(2)).No Violations Noted.Major Areas Inspected:Implementation of Land Vehicle Control Measures IAW 10CFR73 IR 05000259/19960081996-09-25025 September 1996 Insp Repts 50-259/96-08,50-260/96-08 & 50-296/96-08 on 960721-0831.Two non-cited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000259/19960031996-04-15015 April 1996 Insp Repts 50-259/96-03,50-260/96-03 & 50-296/96-03 on 940204-0316.Violations Noted.Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML18038B6101996-01-29029 January 1996 Insp Repts 50-259/95-64,50-260/95-64 & 50-296/95-64 on 951119-951230.Violations Noted.Major Areas Inspected: Operations Which Included Unit 3 Restart,Review of Biological Shield Block Removal Practices,Fire Protection IR 05000259/19950631996-01-0202 January 1996 Insp Repts 50-259/95-63,50-260/95-63 & 50-296/95-63 on 951211-15.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program During Period 951211-15 IR 05000259/19950651995-12-19019 December 1995 Insp Repts 50-259/95-65,50-260/95-65 & 50-296/95-65 on 951128-1201.No Violations Noted.Major Areas Inspected: Radiation Levels of Plant That Would Be Affected by Restart of Unit 3 ML18038B5921995-12-15015 December 1995 Insp Repts 50-259/95-57,50-260/95-57 & 50-296/95-57 on 951002-1117.Violations Noted.Major Areas Inspected:Small Bore Pipe Supports,Instrument Tubing & Supports,Seismic Ii/I Issues & Unit 3 Startup Issues IR 05000296/19952011995-12-0707 December 1995 Insp Rept 50-296/95-201 on 951010-20.Deficiencies Noted. Major Areas Inspected:Facility Mgt,Operations,Maint, Surveillance Testing,Safety Assessment & Quality Verification,Fire Protection Program & Tech Support IR 05000259/19950621995-12-0707 December 1995 Insp Repts 50-259/95-62,50-260/95-62 & 50-296/95-62 on 951030-1103.No Violations Noted.Major Areas Inspected: Adequacy of Licensee Self Assessment & Status of CA IR 05000259/19950591995-11-30030 November 1995 Insp Repts 50-259/95-59,50-260/95-59 & 50-296/95-59 on 951030-1103.No Violations Noted.Major Areas Inspected: Pass,Accident Monitoring Instrumentation,Water Chemistry Control,Liquid Radwaste Processing & CREVS ML18038B5421995-11-0707 November 1995 Insp Repts 50-259/95-56,50-260/95-56 & 50-296/95-56 on 950917-1014.Violations Noted.Major Areas Inspected: Operations,Maint & Surveillance Testing Activities,Unit 3 Restart Including Numerous Equipment Testing Activities IR 05000259/19950581995-10-24024 October 1995 Insp Repts 50-259/95-58,50-260/95-58 & 50-296/95-58 on 951003-05.No Violations Noted.Major Areas Inspected:Licensee Access Authorization Program IR 05000259/19950551995-10-18018 October 1995 Insp Repts 50-259/95-55,50-260/95-55 & 50-296/95-55 on 950925-29.No Violations Noted.Major Areas Inspected:Area Radiation Monitoring Sys Operations Associated W/Unit 3 Restart IR 05000259/19950491995-10-11011 October 1995 Insp Repts 50-259/95-49,50-260/95-49 & 50-296/95-49 on 950918-22.No Violations Noted.Major Areas Inspected:Facility Performance in Operations,Engineering & Maint of Selected risk-related Components & Activities IR 05000259/19950531995-10-0505 October 1995 Insp Repts 50-259/95-53,50-260/95-53 & 50-296/95-53 on 950911-15.No Violations Noted.Major Areas Inspected: Implementation of MOV Program to Meet Commitments Made for Unit 3 IAW GL 89-10, SR MOV Testing & Surveillance IR 05000259/19950471995-09-12012 September 1995 Insp Repts 50-259/95-47,50-260/95-47 & 50-296/95-47 on 950807-11 & 21-25.No Violations Noted. Major Areas Inspected:Pass,Accident Modeling Instrumentation,Lab QA, Crev Sys,Liquid Radwaste Processing & SBGTSs IR 05000259/19950501995-09-0606 September 1995 Insp Repts 50-259/95-50,50-260/95-50 & 50-296/95-50 on 950815-18.No Violations or Deviations Noted.Major Areas Inspected:Design Engineering & Plant Mod Issues Associated W/Restart of Unit 3 IR 05000259/19950461995-08-22022 August 1995 Insp Repts 50-259/95-46,50-260/95-46 & 50-296/95-46 on 950807-11.No Violations Noted.Major Areas Inspected: Operational Readiness of Emergency Preparedness Program for Unit 3 Restart Activities IR 05000259/19940221994-10-0707 October 1994 Insp Repts 50-259/94-22,50-260/94-22 & 50-296/94-22 on 940912-16.No Violations Noted.Major Areas Inspected: Engineering & Technical Support Activities & Design Changes & Plant Mods IR 05000259/19940211994-10-0505 October 1994 Insp Repts 50-259/94-21,50-260/94-21 & 50-296/94-21 on 940912-16.No Violations or Deviations Noted.Major Areas Inspected:Emergency Operating Procedure follow-up Insp & Unit 3 Control Room Design Review IR 05000259/19940201994-09-29029 September 1994 Insp Repts 50-259/94-20,50-260/94-20 & 50-296/94-20 on 940814-0910.No Violations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint Activities,Unit 3 Recovery Activities & Problem Resolution Issues IR 05000259/19940191994-09-13013 September 1994 Insp Repts 50-259/94-19,50-260/94-19 & 50-296/94-19 on 940815-19.No Violations Noted.Major Areas Inspected: Emergency Plan & Implementing Procedures,Facilities, Equipment & Instrumentation IR 05000259/19940181994-08-25025 August 1994 Insp Repts 50-259/94-18,50-260/94-18 & 50-296/94-18 on 940717-0813.No Violations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint Activities & Plant Support Activities IR 05000259/19940171994-07-28028 July 1994 Insp Repts 50-259/94-17,50-260/94-17 & 50-296/94-17 on 940618-0716.Violations Noted.Major Areas Inspected:Maint & Surveillance Observation,Operational Safety Verification, Unit 3 Restart Activities & Reportable Occurrences 1999-08-23
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000259/19990041999-08-23023 August 1999 Insp Repts 50-259/99-04,50-260/99-04 & 50-296/99-04 on 990613-0724.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000259/19990031999-07-0808 July 1999 Insp Repts 50-259/99-03,50-260/99-03 & 50-296/99-03 on 990502-0612.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering,Plant Support & Licensee bi-annual Emergency Preparedness Exercise IR 05000259/19990021999-05-28028 May 1999 Insp Repts 50-259/99-02,50-260/99-02 & 50-296/99-02 on 990321-0501.Four Violation Noted & Being Treated as non-cited Violations.Major Areas Inspected:Aspects of Licensee Operation,Maint,Engineering & Plant Support IR 05000259/19990011999-04-15015 April 1999 Insp Repts 50-259/99-01,50-260/99-01 & 50-296/99-01 on 990207-0320.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support.Also Insp,Licensee Emergency Preparedness & Security Programs IR 05000259/19980091999-03-0505 March 1999 Insp Repts 50-259/98-09,50-260/98-09 & 50-296/98-09 on 981227-990206.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support Re Plant Security ML18039A7201999-03-0505 March 1999 Notice of Violation from Insp on 981115-1226.Violation Noted:During Period of 981202-07,Procedure 2/3-SR-2 Not Adequately Established or Maintained IR 05000260/19980111999-01-30030 January 1999 Insp Repts 50-260/98-11 & 50-296/98-11 on 981116-1204. No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000259/19980081999-01-25025 January 1999 Insp Repts 50-259/98-08,50-260/98-08 & 50-296/98-08 on 981115-1226.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML18039A6791999-01-25025 January 1999 Notice of Violation from Insp on 981115-1226.Violation Noted:As of 981104,written Procedures Not Adequately Maintained in That SI O-SI-4.2.A-12 Did Not Provide Adequate Instructions for Testing Heater Flow Switch Relay Contacts ML18039A6521998-12-24024 December 1998 Notice of Violation from Insp on 981004-1114.Violation Noted:On 981014,licensee Failed to Comply with TS 3.0.4 When Specified Condition in Applicability of TS 3.5.1 Was Entered Without Meeting LCO IR 05000259/19980071998-12-0909 December 1998 Insp Repts 50-259/98-07,50-260/98-07 & 50-296/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML18039A6001998-11-0202 November 1998 Notice of Violation from Insp on 980823-1003.Violation Noted:Until 980828,written Procedures Not Adequately Maintained IR 05000259/19980061998-11-0202 November 1998 Insp Repts 50-259/98-06,50-260/98-06 & 50-296/98-06 on 980823-1023.Violation Noted.Major Areas Inspected:Operation, Maint,Engineering & Plant Support IR 05000259/19980121998-10-22022 October 1998 Partially Withheld Insp Repts 50-259/98-12,50-260/98-12 & 50-296/98-12 on 980928-1002.No Violations Noted.Major Areas Inspected:Plant Support,Physical Security Program for Power Reactors IR 05000259/19980051998-09-18018 September 1998 Insp Repts 50-259/98-05,50-260/98-05 & 50-296/98-05 on 980712-0822.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000259/19980041998-08-0707 August 1998 Insp Repts 50-259/98-04,50-260/98-04 & 50-296/98-04 on 980524-0711.No Violations Noted.Major Areas Inspected: Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000259/19980031998-06-16016 June 1998 Insp Repts 50-259/98-03,50-260/98-03 & 50-296/98-03 on 980412-0523.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support.Addl Rept Includes GL 89-01 Implementation of Motor Operated Valve ML18039A3751998-05-21021 May 1998 SALP Repts 50-259/98-99,50-260/98-99 & 50-296/98-99 for 960908-980418 ML18039A3481998-05-0505 May 1998 Insp Repts 50-259/98-02,50-260/98-02 & 50-296/98-02 on 980301-0411.Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support ML18039A3471998-05-0505 May 1998 Notice of Violations from Insp on 980301-0411.Violations Noted:Written Procedures Not Implemented in That Model TDA-5A (or Equivalent) DOP Generator Not Used to Perform Testing IR 05000259/19980011998-03-24024 March 1998 Insp Repts 50-259/98-01,50-260/98-01 & 50-296/98-01 on 980118-0228.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18039A2531998-02-12012 February 1998 Insp Repts 50-259/97-12,50-260/97-12 & 50-296/97-12 on 971207-980117.Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18039A2331998-01-0202 January 1998 Insp Repts 50-259/97-11,50-260/97-11 & 50-296/97-11 on 971026-1206.Violations & Deviations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML18039A2311998-01-0202 January 1998 Notice of Violation from Insp on 971026-1206.Violations Noted:On 971119,trend Rept Required by Procedure MMDP-5 & Site Std Prace SSP-6.51 Had Not Been Prepared ML18038C0031997-11-24024 November 1997 Notice of Violation from Insp on 970914-1025.Violation Noted:Between 970824-28,while in Condition Requiring Primary Containment Integrity,Inoperable Containment Isolation Valve 3-FCV-64-34 Not Restored to Operable Status within 4 Hours ML18038C0041997-11-24024 November 1997 Insp Repts 50-259/97-10,50-260/97-10 & 50-296/97-10. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint,Plant Support,Radiological Controls & Fire Protection ML18038B9781997-10-0808 October 1997 Notice of Violation from Insp on 970903-0913.Violation Noted:Snubber Functional Testing Was Not Being Performed During Refueling Outage ML18038B9791997-10-0808 October 1997 Insp Repts 50-259/97-09 50-260/97-09 & 50-296/97-09 on 970803-0913.Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18038B9431997-08-29029 August 1997 Notice of Violation from Insp on 970622-0802.Violation Noted:On 960520,SE Was Not Prepared for Plant Mod Dcn S39677A Which Revised Load Limitation Notes on Drawings 0-45E732-1 & 0-45E732-3 (FSAR Figures 8.5-12A & 8.5-13A) ML18038B9441997-08-29029 August 1997 Insp Repts 50-259/97-08,50-260/97-08 & 50-296/97-08 on 970622-0802.Violation Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support IR 05000259/19970061997-07-21021 July 1997 Insp Repts 50-259/97-06,50-260/97-06 & 50-296/97-06 on 970602-06.Violations Noted.Major Areas Inspected.Observation & Evaluation of Biennial Emergency Preparedness Exercise ML18038B9181997-07-17017 July 1997 Insp Repts 50-259/97-07,50-260/97-07 & 50-296/97-07 on 970511-0621.Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000259/19970051997-06-0505 June 1997 Insp Repts 50-259/97-05,50-260/97-05 & 50-296/97-05 on 970330-0510.Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support IR 05000259/19970031997-04-22022 April 1997 Insp Repts 50-259/97-03,50-260/97-03 & 50-296/97-03 on 970216-0329.No Violations Noted.Major Areas Inspected:Maint, Engineering & Plant Support IR 05000259/19970011997-03-11011 March 1997 Insp Repts 50-259/97-01,50-260/97-01 & 50-296/97-01 on 970105-0215.No Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support PNO-II-97-014, on 970305,Unit 3 Experienced Loss of Offsite Power & Declared Notification of Unusual Event.Unit 2 Operating at 100 Percent During Event & Unaffected.Unit 1 in Long Term Shutdown Condition & Also Unaffected1997-03-0505 March 1997 PNO-II-97-014:on 970305,Unit 3 Experienced Loss of Offsite Power & Declared Notification of Unusual Event.Unit 2 Operating at 100 Percent During Event & Unaffected.Unit 1 in Long Term Shutdown Condition & Also Unaffected ML18038B8151997-01-27027 January 1997 Insp Repts 50-259/96-13,50-260/96-13 & 50-296/96-13 on 961124-970104.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML18038B8141997-01-27027 January 1997 Notice of Violation from Insp on 961124-970104.Violation Noted:Work Request Was Not Prepared & Assessment of Potential Impacts Was Not Conducted for Tailored Tarpaulin Cover Erected Over & Around Upper Surface Area of Unit 2 ML20138M0061997-01-13013 January 1997 EN-97-003:notice of Order Prohibiting Involvement in NRC- Licensed Activities (Effective Immediately) Issued to Jr Byrum.Action Based on NRC Investigation & Testimony Before DOL IR 05000260/19960991996-10-16016 October 1996 SALP Repts 50-260/96-99 & 50-296/96-99 for Period 950319- 960907 IR 05000259/19960111996-10-0606 October 1996 Partially Withheld Insp Repts 50-259/96-11,50-260/96-11 & 50-296/11 on 960923-25 (Ref 10CFR73.21(c)(2)).No Violations Noted.Major Areas Inspected:Implementation of Land Vehicle Control Measures IAW 10CFR73 IR 05000259/19960081996-09-25025 September 1996 Insp Repts 50-259/96-08,50-260/96-08 & 50-296/96-08 on 960721-0831.Two non-cited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML18038B7431996-08-15015 August 1996 Notice of Violation from Insp on 960609-0720.Violation Noted:Written Procedures Not Implemented in Listed Areas ML20129D2931996-07-19019 July 1996 Notice of Violation from Insp on 960617-20.Violation Noted: During Test,Two Members of Security Force Failed to Detect Firearm Visible on x-ray & Take Action to Neutralize Possibility of Threat After Identifying Part of Firearm IR 05000259/19963001996-07-12012 July 1996 Exam Repts 50-259/96-300,50-260/96-300 & 50-296/96-300 on 960614-20.Exam Results:All Nine Candidates Successfully Passed Exams ML18038B7171996-06-19019 June 1996 Notice of Violation from Insp on 960428-0608.Violation Noted:From 960326-28,written Procedures Not Implemented When Customer Group Workers Performed Safety Related Functions in Excess of SSP-1.7 Limitations W/O Approved Exemption IR 05000259/19960031996-04-15015 April 1996 Insp Repts 50-259/96-03,50-260/96-03 & 50-296/96-03 on 940204-0316.Violations Noted.Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20205C6581996-02-14014 February 1996 Notice of Violation from Secretary of Labor Decision & Order .Violation Noted:On 930202 & 04,SWEC,discriminated Against D Harrison for Engaging in Protected Activities ML18038B6111996-01-29029 January 1996 Notice of Violation from Insp on 951119-951230.Violation Noted:Preaction Sys 3-26-77 Inoperable from Some Time on 951122-23 W/O Continuous Fire Watch Being Established ML18038B6101996-01-29029 January 1996 Insp Repts 50-259/95-64,50-260/95-64 & 50-296/95-64 on 951119-951230.Violations Noted.Major Areas Inspected: Operations Which Included Unit 3 Restart,Review of Biological Shield Block Removal Practices,Fire Protection 1999-08-23
[Table view] |
Text
gp,R IlE0II Vp
+
Cy A
I O
IlA0 UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTASTREET, N.IN.
ATLANTA,GEORGIA 30323 Report Nos.:
50-259/90-36, 50-260/90-36, and 50-296/90-36 Licensee:
Tennessee Valley Authority 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Docket Nos.:
50-259, 50-260 and 50-296 License Nos.:
DPR-33, DPR-52, and DPR-68 Facility Name:
Browns Ferry 1, 2, and
Inspection Conducte November 5-9, 1990
c~
Inspector:
R.
oore Team Members:
R. Wright C.
Rapp Accompanying Personnel:
F. Jape - November 7-9, 1990 Approved by:
F.
ape,
~e Engineering Assessment Section Engineering Branch Division of Reactor Safety po ate igne at
)gne SUMMARY Scope:
This routine, unannounced inspection was conducted in the areas of corrective action program and procurement practices.
Results:
In the areas inspected, violations or deviations'were not identified.
The corrective action program was found to be adequate and working well.
Concerns identified in previous NRC inspection (50-259, 260, 296/90-20)
were addressed by the licensee and resolved.
Browns Ferry procurement program and implementation was adequate based on a
sample review of current Unit 2 procurement activities.
90i2170088 90ii30 PDR ADDCK 05000259 Q
PDR
REPORT DETAILS Persons Contacted Licensee Employees P. Carier, Site Licensing W. Clothier, PEG Engineer
'M. Coston, Site guality Manager, Materials and Receiving J. Davidson, Nuclear Stores Manager D. Hicks, Materials and Procurement Manager S.
Holm, Mechanical - Civil Supervisor, PEG R. Hyde, PEG Lead Engineer S.
Holm, Mechanical - Civil Supervisor, PEG
- L. Jones, Manager, Special Projects and Support L. Lemon, PEG, Contractor Engineer
- B. McKinney, Manager Technical Support
- B. Morris, Corrective Action Coordinator
- L. Myers, Plant Manager G. Peterson, PEG Engineer.
- C. Reed, Procurement Manager
- J. Wallace, Site Licensing J.
Watson, Procedure Writer, PEG 0. Zeringue, Site Director Other licensee employees contacted
. during this inspection included engineers, technicians, and administrative personnel.
NRC Resident Inspectors
- Attended exit interview 2.
Corrective Action Program (92720)
The corrective action program was reviewed to verify that NRC concerns were resolved prior to Unit 2 restart.
The program was previously reviewed in June 1990, (NRC Inspection Report Number 50-259,260,296/90-20)
and assessed as effective in resolving identified deficiencies.
This inspection reviewed corrective action performance from June 1990 to November 1990.
Aspects of the corrective action process reviewed
i r'
included; corrective action completion and closure, closure of conditions adverse to quality reports (CAQRs) that required little or no action, management involvement, site quality involvement, and licensee actions to address concerns identified in the previous NRC inspection.
Overall the corrective action program continued to be effective in correction of identified deficiencies.
This assessment was based on the corrective action process currently in use at Browns Ferry.
It was noted the licensee anticipates standardizing the program sometime after restart of Unit 2.
This review provides no assumptions or projections regarding corrective action process effectiveness following the anticipated program change.
Site quality overview was assessed via, review of audits and monitoring reports performed since June 1990.
Audit Report BFA 90021, Correction of Deficiencies reviewed plant performance related to the CAQR and CAQ/ACP processing of identified deficiencies.
The evaluation of plant and management review committee performance was objective and demonstrated SQ commitment to maintaining an effective corrective action process.
Audit findings included; inappropriate CAQR closures, trending and timeliness of Incident Investigation Reports, and administrative documentation errors.
Audit findings were appropriately documented and entered into the corrective action process.
The 'audit was issued October 22, 1990; therefore, the elapsed time had not been sufficient for development of corrective action.
Monitoring reports are limited scope reviews of specific programatic aspects of plant activities.
The following monitoring reports related to
"
the corrective action process were reviewed.
QBF-M-90-289 QBF-M-90-1473 QBF-M-90-1492 QBF-M-90-1486 QBF-M-90-1500 QBF-M-90-0495 QBF-M-90-0457 QBF-R-90-0506 QBF-R-90-0529 QBF-R-90-0499 QBF-M-90-0579 QBF-M-90-0599 QBF-M-90-0598 Radiological Incident Reports Work Order (maintenance)
Inspection Reports and COTS (QC)
Test Deficiencies Receipt Inspection Reports Closure of CAQR CAQRs Applicable to SPOC Process Closure of CAQR - BFP880746 Security Degradation Determinations Disposition of CAQR 900116 Disposition of CAQR BFP 900320 Receipt Inspection Reports Disposition of CAQR BFP 900136 Monitoring reports reviewed the adequacy of corrective action; determina-tion of CAQR applicability by line organizations, timeliness, and administrative closure.
, This evaluation activity was objective and in combination with audits, provided the iicensee an
~ade uate basis for assessment of the corrective action progra Closure and invalidation activity since June 1990 was generally adequate.
The following CARR closures were reviewed.
BFP890720 BFP890123 BFP890392 BFP890287905P BFA900066 BFP890792 BF890219 BFP880703 BFP880442 BFP890379D02 8 FP900102 BFP871060 BFP870319 BFP880826 BFA900025005 BFP890810 The CA(Rs were appropriately addressed and resolved.
Areas which could be strengthened included operability determinations and initial scoping of the identified problems.
Sg had previously identified these areas for increased attention.
Corrective action was to include the Operations staff in operability determinations, especially for determinations involving operating modes 1,
and 3 and the safety/nonsafety equipment interfaces.
CA(Rs BFP900066, 890123, 880703, and 871060 were revised to include additional examples of an identified problem.
For example, seven cracked angle plates on torus supports were identified at different times and were added to an existing CA(R.
Eventually a broad scope evaluation of torus supports was initiated.
These CA(R,revisions, to include additional examples of previously identified deficiencies, indicate that.
the initial generic reviews for CAgRs could be improved.
Closure of CAgRs by invalidation and transfer to CA(/ACPs was generally adequate.
Administrative deficiencies were identified; however, the identified problems were adequately resolved.
A total of 87 CA(Rs were.
'rocessed in this manner, 36 transferred to ACPs and 46 invalidated.
BFP900333 regarding a bypassed gC hold point for a weld removal area was transferred to an inappropriate ACP.
The ACP was not a designated CA(/ACP as required by the Corrective Action Program procedure SDSP 3. 13, Revision 9.
The actual hardware issue for this CARR was not safety significant.
BFP 9003344 was invalidated based on required actions which were not assigned to an ACP.
The CARR addressed an inadequate site procedure which resulted in a missed NDE examination on a support.
The invalidation stated
"the condition can be corrected by reworking the support and performing'he required NDE."
The practice of specifying corrective actions on the invalidation form is questionable because there is no feedback mechanism following CARR invalidation to verify actions were completed.
In this example the'ork was completed due to the associated work plan remaining open.
Overall the invalidation and transfers were adequate.
The examples discussed were of minor safety significance individually.
Review of Sg monitoring activity and discussions with Sg staff indicated this program aspect was adequately monitored..
A specific example of inappropriate CARR closure was identified related to CA(Rs BFP890147 and BF(900116.
The CAgRs addressed replacement of safety related circuit breakers and a field change to CAD system solenoid valve The Site guality Manager authorized closure of these CAgRs prior to completion of the designated corrective actions.
This, action directly conflicted with the licensee corrective action program requirements as indicated by SDSP 3. 13.
This authorization was granted despite a closure rejection previously issued by the Sg staff.
In discussion with the Sg manager regarding this inappropriate closure authorization he indicated he was knowledgeable of the CARR issues and status at the time and decided closure was acceptable.
It was notable that the authorization occurred on a weekend, the time period was near the end of the fiscal year, and the licensee had previously established goals regarding open CAgRs.
The significance of this issue was limited due to licensee identification of the issues and recognition that this was'
unique occurrence.
The Sg staff initiated a
PRD which is a lower tier CAg process to identify this deficiency.
This action will assure the identified CAgRs are adequately tracked and closed.
No similar inappropriate closure authorizations were identified, therefore this occurrence appeared unique.
A trend of deliberate program circumvention would have negatively impacted the quality of the corrective action program; however, this single example did not demonstrate a programatic or process weakness.
Overall, the corrective action process has continued to be effective in resolving identified problems at Browns Ferry.
Contributors to program
~
effectiveness were the cross organizational NRC and the close monitoring by Sg.
A review of NRC minutes from June to October 1990 indicated that the amount of management involvement has decreased due to the fact that fewer CAgs are required to be reviewed by the NRC.
The process continued to function adequately with less high level management involvement.
The cross organizational review was an important program aspect.
Sg monitoring activity was evident in all aspects of the corrective action program and demonstrated an uncompromising investigative function.
'I The corrective action program presently in use will remain through Unit 2 restart.
Changes to the process, Revisions 8,
9, and 10 of SDSP 3.13, since June 1990 have been minor.
Procurement (38701, 38703)
The purpose of this inspection was to ascertain that BF is implementing a
gA program which ensures procurement activities for safety related items/services and currently procured CG components/piece parts is in accordance with regulatory requirements, licensee commitments, and industry guides and standards.
The inspector met in conference 'with the various managers and supervisors involved in the procurement cycle which included, Nuclear Stores, PEG, Procurement, Purchasing, and gA.
At this meeting the BF procurement process was described in detail to the inspector and any questions he had regarding the procurement scenario were satisfactorily answered.
These discussions and review of procedures SDSP-16.9, Rev. 4, Technical Evaluation for Procurement of Materials and Services; and SDSP-16.2,
o
Rev. 2, Procurement of Material, Components, Spare Parts, and Services (under revision)
disclosed that BF's procurement program is generally patterned after Sequoyah Nuclear Plant's program which was previously inspected by Region II (Report No. 50-327,328/90-02)
and found acceptable.
The inspector selected the following sampling of recent Appendix B, Eg, licensee upgrades, and CG item procurement and dedication packages to review and assess their adequacy for specifying proper technical and gA requirements, testing, vendor documentation, dedication attributes, and acceptance criteria for the procured items.
QA Level Contract No. /Re ort No.
Descri tion IS IS IIIIII 90NJC-82218C 90NLF-448628/RD-139969 Yi9004575B 89NLC-44914B/RD-137300 89NLG-75294A 91NJG-82408C 91NJL-82465C SWE8908355 Technical Report 90-5694 M9100760 Carbon Steel, 45'lbows Electrical Insulation Sleeving Rosemont Transmitters (10 CFR 50.49)
Rebuild GE Circuit Breakers Repair/Refurbish Temperature Switches Pressure Controller Parts Cartridge Fuses Pump Parts, Upgraded to gA Level II by Dedication Copper Elbows and Tubing, Upgrade Terminal Lugs and Splices One discrepancy involving Contract 91 NJG-82408C was identified concerning an inadequate TVA source inspection of the parts manufacturer.
Contrary to contract requirements the source inspection conducted by TVA on October 24, 1990 did not verify the manufacturer's conformance to process and materials of construction.
The current proposed licensing basis for-restart of Unit 2 may allow deferral of evaluation of safety-related replacement items installed in safety-related application for other than
CFR 50.49 systems until after the restart 'of Unit 2.
Therefore, the subject discrepancy was identified as IFI 50-260/90-36-01, Inadequate Vendor Source Inspection.
(See NUREG 1232 Volume 3, Suppplment 2).
This discrepancy has been identified as PRD BFP900375 by the licensee who has been asked to determine the acceptability of these Pressure Controller Parts for their safety-related application and to review this source inspection deficiency for potential generic implications.
The inspector conducted a walk-through inspection of the newly. constructed MPC complex which is unique in that it houses the entire BF procurement organization under one roof.
The MPC building is well laid out in that it contains the main nuclear stores warehouse and stores personnel, PEG, purchasing, procuremont document control, and (A/gC personnel which enhances aood communication The inspector had discussions and queried several PEG personnel concerning procurement packages they were currently working.on'and questioned them on some of the above listed completed procurement packages, asking them to reverify some aspects of the packages.
The inspector found these engineers to be responsive, and knowledgeable of the procurement process and their responsibilities.
The inspector examined the NPC warehouse and was impressed with its cleanliness, its spacious modern facilities, and the identification and storage of materials stored therein.
The inspector talked to and observed stores personnel receiving and issuing materials and identified no significant problems.
Discussion with and observation of gC receipt inspection personnel revealed they appeared to be adequately staffed and knowledgeable of their duties.
Onsite gA testing capability of critical characteristics is generally limited to material hardness testing and dimensional checks since BF depends primarily on audits and source surveillances of CG suppliers at the present time.
The inspector has concluded from this broad based performance oriented procurement inspection that BF has a continually improving, viable, and workable procurement program currently in place that has been adequately implemented for the recent safety-related Unit 2 procurements examined.
The centralization of all procurement activities under one roof (new.
NPC Complex)
appears to greatly enhance the complex organizational interfaces required and is a definite asset to the program.
4.
Action on Previous Inspection Findings (92701, 92702)
a
~
(Closed)
IFI 50-259,260,296/90-20-01, Completion of Action Identified to Safety STD 3.1. 10, Trend Analysis This item involved four Administrative Control Procedures used to process conditions adverse to quality which did not contain adequate trend analysis requirements.
The following ACPs were addressed.
(1)
SDSP 7.6 Naintenance Nanagement System (2)
SDSP 9. 1 Processing Drawing Deficiencies 3)
PNI 17. 1 Conduct of Testing (4)
SDSP 27.6 Engineering Evaluation Request Review of draft revisions for ACPs (1)
and (2) above identified the inclusion of trend analysis requirements.
ACPS (3)
and, (4) were deleted from the designated CAg/ACP list in SDSP 3.13, Corrective Action, Revision 10.
These actions adequately addressed
=this issue.
This IFI is close I
b.
(Closed)
IFI 50-259,260, 296/90-20-02, Site Quality Corrective Action Program Overview SQ overview of the corrective action program did not include overview of the following program aspects.
(1)
CAQR - CAQ/ACP determinations by the plant staff.
(2)
Verification of corrective action activity by plant.
Review of Audit Report BFA 90021 and'Q monitoring reports performed between June and October 1990, demonstrate these program aspects were appropriately monitored by SQ.
This IFI is closed.
5.
Exit Interview The inspection scope and results were summarized on November 9, 1990, with those persons indicated in paragraph 1.
The inspectors described the areas inspected and dis'cussed in detail the inspection results.
Proprietary information is not contained in this report.
Dissenting comments were not received from the licensee.
6.
Acronyms and Initialisms ACP BF CAQ CAQR CAD CG COTS EQ MPC MRC NDE PEG PRD SDSP SQ Administrative Control Procedure Browns Ferry Condition Adverse to Quality Condition Adverse to Quality Report Containment Atmosphere Dilution Commercial Grade Corrected on the Spot Equipment Qualification Materials and Procurement Complex Management Review Committee Non-Destructive Examination Procurement Engineering Group