SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2 & 3 - COMMERCIAL GRADE DEDICATION INSPECTION REPORT 05000259/2023010 AND 05000260/2023010 AND 05000296/2023010
Dear James Barstow:
On November 2, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Browns Ferry Nuclear Plant, Units 1, 2 & 3 and discussed the results of this inspection with Mr. Manu Sivaraman and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 05000259 and 05000260 and 05000296 License Nos. DPR-33 and DPR-52 and DPR-68
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000259, 05000260, and 05000296
License Numbers:
Report Numbers:
05000259/2023010, 05000260/2023010, and 05000296/2023010
Enterprise Identifier:
I-2023-010-0051
Licensee:
Tennessee Valley Authority
Facility:
Browns Ferry Nuclear Plant, Units 1, 2 & 3
Location:
Athens, AL
Inspection Dates:
October 16, 2023, to November 02, 2023
Inspectors:
P. Braxton, Reactor Inspector
L. Day, Reactor Inspector
R. Fanner, Reactor Inspector
M. Hagen, Reactor Inspector
G. Ottenberg, Senior Reactor Inspector
Approved By:
James B. Baptist, Chief
Engineering Branch 1
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Commercial Grade Dedication Inspection at Browns Ferry Nuclear Plant, Units 1, 2 & 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.21N.03 - Commercial Grade Dedication Commercial Grade Dedication (section 03.01)
The inspectors reviewed the implementation of the licensees processes for dedicating commercial-grade items/services as basic components and/or for procuring safety-related structures, systems, and components for the following samples:
- (1) Item No. AEP589N, PEG PKG No. DCN51215M0-VER13, WO 119177439,
Description:
HEATER,OVERLOAD, QA 2, CR123C148A, THERMAL RELEASE, (BFN-3-BKR-074-0007, RHR SYSTEM I MINIMUM FLOW VLV)
- (2) Item No. CJN777K, PEG PKG No. DCN51240M4, WO 119785629,
Description:
VALVE,SOLENOID, QA 1, SSPV, 1/2 IN, FNPT, 120, 60, 9, SCRAM PILOT VALVE AB, 2 (BFN-1-FSV-085-39A/1427, CRD SOLENOID SCRAM PILOT VALVE A)
- (3) Item No. CWR391W, PEG PKG No. 01066200-BFNM0, WO 122914074,
Description:
FLUID,TYPICAL, QA 1, DAMPING, 5 GAL (BFN-2-FCV-001-0027, MAIN STEAM LINE B OUTBD ISOL VLV)
- (4) Item No. CDK662K, PEG PKG No. G3439-2-1720,
Description:
SOLDER, WELDING, QA 2, TIN LEAD, 1 LB, 0.031 IN, SPOOL, 63% TIN/37% LEAD (BFN-3-FCV-074-0057, RHR SYSTEM I SUPP POOL VLV)
- (5) Item No. CBX430D, PEG PKG No. G5945-2-124-DLB, WO 119099273,
Description:
RELAY,AUXILIARY, QA 2 (BFN-2-RLY-064-LRB1, RX ZONE SEC CTMT CH B INIT AUX RLY 1)
- (6) Item No. BBJ078C, PEG PKG No. CPEGM-2-00048, WO 120251565,
Description:
FUSE,ONE-TIME, QA 2, CARTRIDGE, FAST ACTING, 600 AC/DC, 2, 100 K AC/100 K DC, 13/32 IN, 1-1/2 IN (BFN-1-PMP-063-0006A, STANDBY LIQ CONT PMP A)
- (7) Item No. CAB581F, PEG PKG No. G5905-2-020, WO 116498195,
Description:
RESISTOR,ELECTRICAL DEVICE, QA 2, FIXED, 250 DC, 5.1 K, CYLINDRICAL/SOLID, PUSH/TWIST/PLUG-IN, (BFN-1-BKR-248-0001A/6D, 480 SD 1A/6D FDR TO 250V BATT CHGR 1)
- (8) Item No. BPH292E, PEG PKG No. G5940-2-1508, WO 118762176,
Description:
SPLICE,CABLE, QA 2, COMPRESSION, #12-#10 AWG, TEFZEL, YELLOW, BUTT (BFN-3-PMP-074-0005, RESIDUAL HEAT REMOVAL PUMP 3A)
- (9) Item No. CKX094W, PEG PKG No. DCN51017M0, WO 121952531,
Description:
JACK,BANANA, QA 1, ADAPTER, RED, #6-32, 1.04 IN, 1100 VRMS MAX, 25 AMPS MAX, 0.250 IN LONG MALE STUD, ALLOY 360 1/2 HARD PER (BFN-3-GEN-082-0003A, DIESEL GENERATOR 3A)
- (10) Item No. BVR803E, PEG PKG No. G6145-1-011, WO 122097285,
Description:
CABLE,INSULATED, QA 1, SWITCHBOARD, #14 AWG, COPPER, STRANDED, FRXLPE, GRAY, 600, 90 DEG C, 41, 1E-LOCA (BFN-0-BKR-023-0012, 4KV SD BD B PNL 15, RHRSW PUMP C2)
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On November 2, 2023, the inspectors presented the Commercial Grade Dedication Inspection results to Mr. Manu Sivaraman and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
CRs
1436123, 157108, 1836145, 1839554, 1863311,
various
CR 1886795
BFN 2023 NRC CGD Inspection: QA 2 AEP589N &
DCN51215M0-VER13 did not include Seismic Justification
10/17/2023
CR 1886813
CGD NRC INSPECTION NUMBER 2023-010, repair
recommendation for the CSC.
10/17/2023
CR 1887229
23 BFN CGDI: Retention of forms (10 CFR 21.51)
10/19/2023
CR 1888477
BFN 2023 NRC CGD Inspection:CKX094W &
DCN51017M0: Lack of Technical Basis for TPD of Banana
Jacks
10/25/2023
CR 1888487
BFN 2023 NRC CGD Inspection: Basis for Test Values in
ECI-0-000-BKR008 unable to be Identified
10/25/2023
CR 1888489
BFN 2023 NRC CGD Inspection: Station Drawings and
Calculations Do not Depict As-Built Configuration
10/26/2023
CR 1889185
BFN 2023 NRC CGD Inspection: Unable to locate valve
contract
10/30/2023
CR 1889538
BFN 2023 NRC CGD Inspection: Revision to MCI-0-001-
VLV001
10/31/2023
Corrective Action
Documents
Resulting from
Inspection
CR 1889808
BFN 2023 NRC CGD Inspection: UL44 VW1 Evaluation
11/01/2023
1-0124B3723-33
480V shutdown BD 1A Batt Chg 1 Trip Ckt Sub. NO.10
1-45E749-1
Wiring Diagram 480V Shutdown BD 1A Single Line
1-45E779-5
Wiring Diagram 480V Shutdown Aux Power Schematic
Diagram
3-45E36451-5
Wiring Diagrams Unit Control Boards Panel 9-3
3-45E3749-4
480V Reactor MOV BD 3A Connection Diagram
3-45E751-9
Wiring Diagram 480V Reactor MOV BD 3D Single Line
3-45E779-9
Wiring Diagram 480V Shutdown Auxiliary Power
Schematic Diagram
B7122-145,
Sheet 1
SERIES: U06, DESCRIPTION: VALVE SSPV U06,
MODEL NUMBER: B7122-145-**
2/01/2020
BFN-0-45E724-2
Wiring Diagram 4160V Shutdown BD B Single Line
71111.21N.03
Drawings
BFN-0-45E765-5
Wiring Diagram 4160V Shutdown Aux Power Schematic
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Diagram
Engineering
Changes
DCN 71857
NFPA 805 Issue 81 b - Pull-to-Lock Function for RHR
Pumps 1B, 2C, and 3A
4/19/2017
AU29080
TENNESSEE VALLEY AUTHORITY CENTRAL
LABORATORIES SERVICES TECHNICAL REPORT-
Overload Heater
11/22/2017
BFN-50-7001
Main Steam System
BFN-50-7074
RESIDUAL HEAT REMOVAL SYSTEM
BFN-50-7082
Standby Diesel Generator
BFN-50-7085
CONTROL ROD DRIVE SYSTEM
BFN-50-7200D
480V AC Auxiliary Power System
BFN-50-739
Classification of Structures, System and Components
BFN-VTD-A585-
0010
INSTRUCTION MANUAL FOR
INSTALLATION/MAINTENANCE OF 26 MAIN STEAM
ISOLATION VALVE
BFN-VTD-A585-
0030
MAIN STEAM ISOLATION VALVE ATWOOD & MORRILL
CO., INC
BFN-VTD-A613-
0070
U-1 SCRAM SOLENOID PILOT VALVE MANIFOLD
PRECAUTIONS, ENGINEERING AND MAINTENANCE
BFN-VTD-G080-
240
NEMA SIZE 1 CR209 MAGNETIC REVERSING
CONTROLLER
BFN-VTD-G080-
3605
GENERAL ELECTRIC INSTRUCTIONS FOR OPEN OR
IN TYPE 1 ENCLOSURE 300-LINE AC OR DC THERMAL
OVERLOAD RELAYS CR324C-F Al SERIES
BFN-VTD-W993-
0080
INSTRUCTION MANUAL FOR INSTALLATION /
MAINTENANCE 26 MAIN STEAM ISOLATION VALVE
CGIEL01
EPRI CGI JOINT UTILITY TASK GROUP COMMERCIAL
GRADE ITEM EVALUATION FOR LUGS,
COMPRESSION, INSULATED
DCN51215M0-
VER13
HEATER, THERMAL RELEASE OVERLOAD, QA2
Miscellaneous
DG-C1.2.7
SEISMIC/STRUCTURAL QUALIFICATION OF
SELECTED MECHANICAL AND ELECTRICAL
COMPONENTS
2/10/2004
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
DS-C1.2.11
MAINTAINING SEISMIC/STRUCTURAL QUALIFICATION
- REPLACEMENT ITEMS
G-28
Construction of Piping Systems for Boiling Water Nuclear
Power Plants
Supplement 1
MSIV hydraulic fluid contamination
GE Silicones
Fluids, Emulsions, And Specialties
2001
JOB NUMBER
2-02
TEST PLAN GENERIC PLAN FOR TESTING OF MOTOR
STARTER OVERLOAD RELAYS AND HEATERS
MIF 3336520
Item AEP589N
11/15/2017
MIF 7247802
Item CWR391W
06/28/2022
MIF_PO 2722149
SPLICE,CABLE, QA 2, COMPRESSION, #12-#10 AWG,
TEFZEL, YELLOW, BUTT
01/19/2017
MIF_PO 6709875
Material Inspection Form
4/9/2021
NEDP-8
Technical Evaluation for Procurement of Materials and
Services
9/12/2005
PDS BPH292E
SPLICE, CABLE, Q LEVEL: QA 2, TYPE:
COMPRESSION, CABLE SIZE: #12-#10 AWG,
INSULATION: TEFZEL, COLOR: YELLOW, BODY
STYLE: BUTT, MATERIAL: TIN PLATED COPPER
1/13/2016
PEG Package
Number:
01066200-
BFNM0
DAMPING FLUID (SNUBBER HYDRAULIC FLUID)
PEG PKG NO.
AEP589N
HEATER, OVERLOAD, Q LEVEL: QA 2, HEATER NO.:
CR123C148A, TYPE: THERMAL RELEASE
PEG PKG NO.
CJN777K
VALVE, SOLENOID, Q LEVEL: QA 1, TYPE: SSPV, SIZE:
1/2 IN, END STYLE: FNPT, VOLTS: 120, CYCLE: 60,
WATTS: 10.8, APPLICATION: SCRAM PILOT VALVE AB
, NO. COILS: 2 NORMAL OPERATING PRESSURE: 50 -
150 PSIG, W/72" LONG LEAD WIRES.
PEG PKG NO.
CKX094W
JACK, BANANA, Q LEVEL: QA 1, TYPE: ADAPTER,
COLOR: RED, SIZE: #6-32, LENGTH: 1.04 IN, VOLTS:
8/2/2005
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1100 VRMS MAX, AMPS: 25 AMPS MAX,
CONNECTION: 0.250 IN LONG MALE STUD,
CONSTRUCTION: ALLOY 360 1/2 HARD PER MIL-C-
26074, NICKEL PLATED, INSULATION: NYLON 6, 20%
GLASS FILLED.
PEG PKG NO.
CWR391W
FLUID, TYPICAL, QA 1, DAMPING, 5 GAL METHYL
ALKYL SILICONE HYDRAULIC FLUID; GE SILICONE
PART # SF 1147 OR MOMENTIVE PERFORMANCE
PART# SF 1147 TYP TVA USE: PAUL MUNROE
HYDRAULIC SNUBBER, UPPER S/G SUPPORT
PEG PKG NO.
DCN51240M4
AVCO SCRAM PILOT SOLENOID VALVES
PEG PKG No.
G5940-2-1508
TERMINAL LUGS OR COMPRESSION TYPE
ELECTRICAL CONNECTOR
- S. OEM, THOMAS AND
BETTS (COLOR KEYED PRODUCT LINE INSULATED
AND NON INSULATED)
9/12/2014
PO 3336520
QA 2, PR 1787250, HEATER.OVERLOAD, QA 2,
CR123C148A-IN ACCORDANCE WITH TVA RFQ
25284
PO 3575212
VALVE, SOLENOID, QA 1, SSPV, 1/2 IN, FNPT, 120, 60,
10.8, SCRAM PILOT VALVE AB, 2 NORMAL
OPERATING PRESSURE: 50 - 150 PSIG, W/72" LONG
LEAD WIRES.
PO 7247802
FLUID, TYPICAL, QA 1, DAMPING, 5 GAL METHYL
ALKYL SILICONE HYDRAULIC FLUID; GE SILICONE
PART # SF 1147 OR MOMENTIVE PERFORMANCE
PART# SF 1147 TYP TVA USE: PAUL MUNROE
HYDRAULIC SNUBBER, UPPER S/G SUPPORT
PO_6709875
CABLE,INSULATED, QA 1, SWITCHBOARD, #14 AWG,
COPPER, STRANDED, FRXLPE, GRAY, 600, 90 DEG C,
41, 1E-L
SCR 108494-0
CABLE,INSULATED, QA 1, SWITCHBOARD, #14 AWG,
STRANDED, FRXLPE, GRAY, 600, 90 DEG C, 41, 1E-
5/3/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SS-E12.7.01
SWITCHBOARD WIRE WITH FLAME-RETARDANT
CROSS-LINKED
POLYETHYLENE INSULATION
9/10/1997
TE CGIOH01
EPRI CGI JOINT UTILITY TASK GROUP COMMERCIAL
GRADE ITEM EVALUATION FOR BIMETALLIC
OVERLOAD HEATERS
TVA Audit No.:
2015N-26
Automatic Valve Corporation
04/10/2015
TVA Audit/Survey
No.: 2018N-02
Automatic Valve Corporation
2/14/2018
TVA Audit/Survey
No.: 2022N-27
LAKE ENGINEERING CO
06/03/2022
TVA-NQA-
PLN89-A
Nuclear Quality Assurance Plan (NQAP) (Quality
Assurance Program Description)
NEDP-8.0
Evaluations for Procurement of Materials, Items, and
Services
1, 3, 6, 7
NEDP-8.1
Technical Evaluation for Safety Classification of Materials,
Items, and Services
NEDP-8.2
Technical Evaluation for Procurement of Safety Related
and Quality Related Material, Items, and Services
NEDP-9
Seismic/Structural Qualification
NPG-SPP-03.16
Supplier Audits, Surveys, Source Surveillances and ASL
Maintenance
NPG-SPP-03.5
Regulatory Reporting Requirements
NPG-SPP-04.001
Procurement of Material, Labor and Services
NPG-SPP-04.003
Material Storage and Handling
NPG-SPP-04.2
Material Receipt and Inspection
NPG-SPP-04.2
Material Receipt and Inspection
NPG-SPP-
09.18.16
Parts Quality Initiative (PQI) Process
SC-SPP-04.022
Material Receipt, Inspection, Storage and Handling Issue,
Control and Return
Procedures
SC-SPP-04.023
Inventory Accuracy
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Work Orders
119177439, 118981414, 121014518, 120320942,
118581204, 121154701
various