MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] Category:Inspection Report
MONTHYEARIR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 IR 05000259/20234022023-06-12012 June 2023 Material Control and Accounting Program Inspection Report 05000259 2023402, 05000260 2023402 and 05000296 2023402 IR 05000259/20230912023-05-0808 May 2023 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter; NRC Inspection Report 05000259/2023091 IR 05000259/20230012023-05-0303 May 2023 Integrated Inspection Report 05000259/2023001, 05000260/2023001 and 05000296/2023001 IR 05000259/20234402023-03-23023 March 2023 Special Inspection Supplemental Report 05000259 2023440 and 05000260 2023440 and 05000296 2023440 Cover Letter IR 05000259/20234012023-03-0808 March 2023 Security Baseline Inspection Report 05000259 2023401 and 05000260/2023401 and 05000296/2023401 IR 05000259/20230902023-03-0202 March 2023 NRC Inspection Report 05000259/2023090 and 05000260 2023090 and Preliminary White Finding and Apparent Violation IR 05000259/20220062023-03-0101 March 2023 Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 Report 05000259/2022006, 05000260/2022006 and 05000296/2022006 IR 05000259/20220042023-02-0707 February 2023 Integrated Inspection Report 05000259/2022004, 05000260/2022004 and 05000296/2022004 IR 05000259/20220032022-11-0909 November 2022 Browns Perry Nuclear Plant - Integrated Inspection Report 05000259/2022003, 05000260/2022003 and 05000296/2022003 IR 05000259/20220122022-09-20020 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000259 2022012, 05000260 2022012 and 05000296 2022012 IR 05000259/20220112022-09-16016 September 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000259/2022011 and 05000260/2022011 and 05000296/2022011 IR 05000259/20224022022-09-0606 September 2022 Security Baseline Inspection Report 05000259/2022402 and 05000260/2022402 and 05000296/2022402 Cover Letter IR 05000259/20220052022-08-30030 August 2022 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 Report 05000259/2022005, 05000260/2022005 and 05000296/2022005 IR 05000259/20220022022-08-0808 August 2022 Integrated Inspection Report 05000259/2022002, 05000260/2022002 and 05000296/2022002 IR 05000259/20224202022-07-19019 July 2022 Security Baseline Inspection Report 05000259/2022420, 05000260/2022420 and 05000296/2022420 ML22181A9562022-06-29029 June 2022 Bf Report 2022-401 Base Public Cover Letter ML22173A1622022-06-21021 June 2022 Replacement Steam Dryer Visual Inspection Results (U3R20) IR 05000259/20220012022-05-12012 May 2022 Integrated Inspection Report 05000259/2022001, 05000260/2022001, 05000296/2022001 and Exercise of Enforcement Discretion IR 05000259/20220102022-03-30030 March 2022 Triennial Fire Protection Inspection Report 05000259/2022010 and 05000260/2022010 and 05000296/2022010 and Apparent Violation IR 05000259/20224012022-03-0808 March 2022 Information Request for the Cyber-Security Baseline Inspection Notification to Perform Inspection 05000259/2022401; 05000260/2022401; 05000296/2022401 IR 05000259/20210062022-03-0202 March 2022 Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 (Report No. 05000259/2021006, 05000260/2021006 and 05000296/2021006 IR 05000259/20210042022-01-31031 January 2022 Integrated Inspection Report 05000259/2021004, 05000260/2021004 and 05000296/2021004 IR 05000259/20214032022-01-19019 January 2022 NRC Inspection Report 05000259/2021403, 05000260/2021403 and 05000296/2021403 IR 05000259/20214022022-01-18018 January 2022 Brows Ferry Nuclear Plant - Security Baseline Inspection Report 05000259/2021402 and 05000260/2021402 and 05000296/2021402 IR 05000259/20210032021-11-0909 November 2021 Integrated Inspection Report 05000259/2021003, 05000260/2021003, 05000296/2021003 and 07200052/2021001 IR 05000259/20214012021-08-31031 August 2021 Security Baseline Inspection Report 05000259/2021401 and 05000260/2021401 and 05000296/2021401 IR 05000259/20210112021-08-24024 August 2021 Temporary Instruction 2515/TI-193 Inspection Report 05000259/2021011, 05000260/2021011, and 05000296/2021011 IR 05000259/20210052021-08-23023 August 2021 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2, and 3- Report Nos. 05000259/2021005, 05000260/2021005 and 5000296/2021005 ML21217A2832021-08-0505 August 2021 Resident Integrated Inspection Report 2021-002 IR 05000259/20213012021-07-28028 July 2021 NRC Operator License Examination Report Nos. 05000259/2021301, 05000260/2021301, 05000296/2021301 IR 05000259/20210102021-07-26026 July 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000259/2021010 and 05000260/2021010 and 05000296/2021010 IR 05000259/20204012021-05-26026 May 2021 Security Baseline Inspection Report 05000259/2020401 and 05000260/2020401 and 05000296/2020401(U) IR 05000259/20210012021-04-28028 April 2021 Integrated Inspection Report 05000259/2021001, 05000260/2021001 and 05000296/2021001 IR 05000259/20200062021-03-0303 March 2021 Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2020006, 05000260/2020006 and 05000296/2020006 IR 05000259/20200042021-01-28028 January 2021 Integrated Inspection Report 05000259/2020004, 05000260/2020004, 05000296/2020004, 07200052/2020002 and Exercise of Enforcement Discretion IR 05000259/20204022021-01-0808 January 2021 Material Control and Accounting Program Inspection Report 05000259/2020402, 05000260/2020402 and 05000296/2020402 IR 05000259/20200032020-11-10010 November 2020 Integrated Inspection Report 05000259/2020003, 05000260/2020003 and 05000296/2020003 IR 05000254/20200032020-11-0909 November 2020 Integrated Inspection Report 05000254/2020003; 05000265/2020003 and 07200053/2020001 IR 05000259/20200112020-10-26026 October 2020 Biennial Problem Identification and Resolution Inspection Report 05000259/2020011, 05000260/2020011 and 05000296/2020011 IR 05000259/20204042020-09-29029 September 2020 NRC Security Inspection Report 05000259/2020404 and 05000260/2020404 and 05000296/2020404 and Apparent Violation (U) IR 05000259/20200052020-08-18018 August 2020 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2020005, 05000260/2020005, and 05000296/2020005 IR 05000259/20200022020-08-0606 August 2020 Brown Ferry Nuclear Plant Integrated Inspection Report 05000259/2020002, 05000260/2020002, 05000296/2020002, and 07200052/2020001 IR 05000259/20200102020-06-19019 June 2020 Triennial Inspection of Evaluation of Changes, Test and Experiments Baseline Inspection Report 0500259/2020010 and 05000260/2020010 and 05000296/2020010 IR 05000259/20200012020-05-0707 May 2020 Integrated Inspection Report 05000259/2020001, 05000260/2020001, and 05000296/2020001 2023-08-29
[Table view] |
Text
December 11, 2023
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2 & 3 - COMMERCIAL GRADE DEDICATION INSPECTION REPORT 05000259/2023010 AND 05000260/2023010 AND 05000296/2023010
Dear James Barstow:
On November 2, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Browns Ferry Nuclear Plant, Units 1, 2 & 3 and discussed the results of this inspection with Mr. Manu Sivaraman and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Signed by Baptist, James on 12/11/23 James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 05000259 and 05000260 and 05000296 License Nos. DPR-33 and DPR-52 and DPR-68
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000259, 05000260, and 05000296 License Numbers: DPR-33, DPR-52, and DPR-68 Report Numbers: 05000259/2023010, 05000260/2023010, and 05000296/2023010 Enterprise Identifier: I-2023-010-0051 Licensee: Tennessee Valley Authority Facility: Browns Ferry Nuclear Plant, Units 1, 2 & 3 Location: Athens, AL Inspection Dates: October 16, 2023, to November 02, 2023 Inspectors: P. Braxton, Reactor Inspector L. Day, Reactor Inspector R. Fanner, Reactor Inspector M. Hagen, Reactor Inspector G. Ottenberg, Senior Reactor Inspector Approved By: James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Commercial Grade Dedication Inspection at Browns Ferry Nuclear Plant, Units 1, 2 & 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
Main article: IP 71111.21
The inspectors reviewed the implementation of the licensees processes for dedicating commercial-grade items/services as basic components and/or for procuring safety-related structures, systems, and components for the following samples:
- (1) Item No. AEP589N, PEG PKG No. DCN51215M0-VER13, WO 119177439,
Description:
HEATER,OVERLOAD, QA 2, CR123C148A, THERMAL RELEASE, (BFN-3-BKR-074-0007, RHR SYSTEM I MINIMUM FLOW VLV)
- (2) Item No. CJN777K, PEG PKG No. DCN51240M4, WO 119785629,
Description:
VALVE,SOLENOID, QA 1, SSPV, 1/2 IN, FNPT, 120, 60, 9, SCRAM PILOT VALVE AB, 2 (BFN-1-FSV-085-39A/1427, CRD SOLENOID SCRAM PILOT VALVE A)
- (3) Item No. CWR391W, PEG PKG No. 01066200-BFNM0, WO 122914074,
Description:
FLUID,TYPICAL, QA 1, DAMPING, 5 GAL (BFN-2-FCV-001-0027, MAIN STEAM LINE B OUTBD ISOL VLV)
- (4) Item No. CDK662K, PEG PKG No. G3439-2-1720,
Description:
SOLDER, WELDING, QA 2, TIN LEAD, 1 LB, 0.031 IN, SPOOL, 63% TIN/37% LEAD (BFN-3-FCV-074-0057, RHR SYSTEM I SUPP POOL VLV)
- (5) Item No. CBX430D, PEG PKG No. G5945-2-124-DLB, WO 119099273,
Description:
RELAY,AUXILIARY, QA 2 (BFN-2-RLY-064-LRB1, RX ZONE SEC CTMT CH B INIT AUX RLY 1)
- (6) Item No. BBJ078C, PEG PKG No. CPEGM-2-00048, WO 120251565,
Description:
FUSE,ONE-TIME, QA 2, CARTRIDGE, FAST ACTING, 600 AC/DC, 2, 100 K AC/100 K DC, 13/32 IN, 1-1/2 IN (BFN-1-PMP-063-0006A, STANDBY LIQ CONT PMP A)
- (7) Item No. CAB581F, PEG PKG No. G5905-2-020, WO 116498195,
Description:
RESISTOR,ELECTRICAL DEVICE, QA 2, FIXED, 250 DC, 5.1 K, CYLINDRICAL/SOLID, PUSH/TWIST/PLUG-IN, (BFN-1-BKR-248-0001A/6D, 480 SD 1A/6D FDR TO 250V BATT CHGR 1)
- (8) Item No. BPH292E, PEG PKG No. G5940-2-1508, WO 118762176,
Description:
SPLICE,CABLE, QA 2, COMPRESSION, #12-#10 AWG, TEFZEL, YELLOW, BUTT (BFN-3-PMP-074-0005, RESIDUAL HEAT REMOVAL PUMP 3A)
- (9) Item No. CKX094W, PEG PKG No. DCN51017M0, WO 121952531,
Description:
JACK,BANANA, QA 1, ADAPTER, RED, #6-32, 1.04 IN, 1100 VRMS MAX, 25 AMPS MAX, 0.250 IN LONG MALE STUD, ALLOY 360 1/2 HARD PER (BFN-3-GEN-082-0003A, DIESEL GENERATOR 3A)
- (10) Item No. BVR803E, PEG PKG No. G6145-1-011, WO 122097285,
Description:
CABLE,INSULATED, QA 1, SWITCHBOARD, #14 AWG, COPPER, STRANDED, FRXLPE, GRAY, 600, 90 DEG C, 41, 1E-LOCA (BFN-0-BKR-023-0012, 4KV SD BD B PNL 15, RHRSW PUMP C2)
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On November 2, 2023, the inspectors presented the Commercial Grade Dedication Inspection results to Mr. Manu Sivaraman and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.21N.03 Corrective Action CRs 1436123, 157108, 1836145, 1839554, 1863311, various
Documents
Corrective Action CR 1886795 BFN 2023 NRC CGD Inspection: QA 2 AEP589N & 10/17/2023
Documents DCN51215M0-VER13 did not include Seismic Justification
Resulting from CR 1886813 CGD NRC INSPECTION NUMBER 2023-010, repair 10/17/2023
Inspection recommendation for the CSC.
CR 1887229 2023 BFN CGDI: Retention of forms (10 CFR 21.51) 10/19/2023
CR 1888477 BFN 2023 NRC CGD Inspection:CKX094W & 10/25/2023
DCN51017M0: Lack of Technical Basis for TPD of Banana
Jacks
CR 1888487 BFN 2023 NRC CGD Inspection: Basis for Test Values in 10/25/2023
ECI-0-000-BKR008 unable to be Identified
CR 1888489 BFN 2023 NRC CGD Inspection: Station Drawings and 10/26/2023
Calculations Do not Depict As-Built Configuration
CR 1889185 BFN 2023 NRC CGD Inspection: Unable to locate valve 10/30/2023
contract
CR 1889538 BFN 2023 NRC CGD Inspection: Revision to MCI-0-001- 10/31/2023
VLV001
CR 1889808 BFN 2023 NRC CGD Inspection: UL44 VW1 Evaluation 11/01/2023
Drawings 1-0124B3723-33 480V shutdown BD 1A Batt Chg 1 Trip Ckt Sub. NO.10 0
1-45E749-1 Wiring Diagram 480V Shutdown BD 1A Single Line 53
1-45E779-5 Wiring Diagram 480V Shutdown Aux Power Schematic 18
Diagram
3-45E36451-5 Wiring Diagrams Unit Control Boards Panel 9-3 5
3-45E3749-4 480V Reactor MOV BD 3A Connection Diagram 4
3-45E751-9 Wiring Diagram 480V Reactor MOV BD 3D Single Line 19
3-45E779-9 Wiring Diagram 480V Shutdown Auxiliary Power 14
Schematic Diagram
B7122-145, SERIES: U06, DESCRIPTION: VALVE SSPV U06, 12/01/2020
Sheet 1 MODEL NUMBER: B7122-145-**
BFN-0-45E724-2 Wiring Diagram 4160V Shutdown BD B Single Line 49
BFN-0-45E765-5 Wiring Diagram 4160V Shutdown Aux Power Schematic 68
Inspection Type Designation Description or Title Revision or
Procedure Date
Diagram
Engineering DCN 71857 NFPA 805 Issue 81 b - Pull-to-Lock Function for RHR 4/19/2017
Changes Pumps 1B, 2C, and 3A
Miscellaneous AU29080 TENNESSEE VALLEY AUTHORITY CENTRAL 11/22/2017
LABORATORIES SERVICES TECHNICAL REPORT-
Overload Heater
BFN-50-7001 Main Steam System 39
BFN-50-7074 RESIDUAL HEAT REMOVAL SYSTEM 30
BFN-50-7082 Standby Diesel Generator 16
BFN-50-7085 CONTROL ROD DRIVE SYSTEM 15
BFN-50-7200D 480V AC Auxiliary Power System 12
BFN-50-739 Classification of Structures, System and Components 9
BFN-VTD-A585- INSTRUCTION MANUAL FOR 4
0010 INSTALLATION/MAINTENANCE OF 26 MAIN STEAM
ISOLATION VALVE
BFN-VTD-A585- MAIN STEAM ISOLATION VALVE ATWOOD & MORRILL 25
0030 CO., INC
BFN-VTD-A613- U-1 SCRAM SOLENOID PILOT VALVE MANIFOLD 0
0070 PRECAUTIONS, ENGINEERING AND MAINTENANCE
BFN-VTD-G080- NEMA SIZE 1 CR209 MAGNETIC REVERSING 1
240 CONTROLLER
BFN-VTD-G080- GENERAL ELECTRIC INSTRUCTIONS FOR OPEN OR 0
3605 IN TYPE 1 ENCLOSURE 300-LINE AC OR DC THERMAL
OVERLOAD RELAYS CR324C-F Al SERIES
BFN-VTD-W993- INSTRUCTION MANUAL FOR INSTALLATION / 6
0080 MAINTENANCE 26 MAIN STEAM ISOLATION VALVE
CGIEL01 EPRI CGI JOINT UTILITY TASK GROUP COMMERCIAL 0
GRADE ITEM EVALUATION FOR LUGS,
COMPRESSION, INSULATED
DCN51215M0- HEATER, THERMAL RELEASE OVERLOAD, QA2 0
VER13
DG-C1.2.7 SEISMIC/STRUCTURAL QUALIFICATION OF 02/10/2004
SELECTED MECHANICAL AND ELECTRICAL
COMPONENTS
Inspection Type Designation Description or Title Revision or
Procedure Date
DS-C1.2.11 MAINTAINING SEISMIC/STRUCTURAL QUALIFICATION 6
- REPLACEMENT ITEMS
G-28 Construction of Piping Systems for Boiling Water Nuclear 12
Power Plants
GE SIL 329, MSIV hydraulic fluid contamination 1
Supplement 1
GE Silicones Fluids, Emulsions, And Specialties 2001
JOB NUMBER TEST PLAN GENERIC PLAN FOR TESTING OF MOTOR 0
2-02 STARTER OVERLOAD RELAYS AND HEATERS
MIF 3336520 Item AEP589N 11/15/2017
MIF 7247802 Item CWR391W 06/28/2022
MIF_PO 2722149 SPLICE,CABLE, QA 2, COMPRESSION, #12-#10 AWG, 01/19/2017
TEFZEL, YELLOW, BUTT
MATERIAL: TIN PLATED COPPER
MIF_PO 6709875 Material Inspection Form 4/9/2021
NEDP-8 Technical Evaluation for Procurement of Materials and 9/12/2005
Services
PDS BPH292E SPLICE, CABLE, Q LEVEL: QA 2, TYPE: 1/13/2016
COMPRESSION, CABLE SIZE: #12-#10 AWG,
INSULATION: TEFZEL, COLOR: YELLOW, BODY
STYLE: BUTT, MATERIAL: TIN PLATED COPPER
PEG Package DAMPING FLUID (SNUBBER HYDRAULIC FLUID) 3
Number:
01066200-
BFNM0
PEG PKG N
- O. HEATER, OVERLOAD, Q LEVEL: QA 2 , HEATER NO.: 6
AEP589N CR123C148A , TYPE: THERMAL RELEASE
PEG PKG N
- O. VALVE, SOLENOID, Q LEVEL: QA 1, TYPE: SSPV, SIZE: 6
CJN777K 1/2 IN, END STYLE: FNPT, VOLTS: 120, CYCLE: 60,
WATTS: 10.8, APPLICATION: SCRAM PILOT VALVE AB
, NO. COILS: 2 NORMAL OPERATING PRESSURE: 50 -
150 PSIG, W/72" LONG LEAD WIRE
- S.
PEG PKG NO. JACK, BANANA, Q LEVEL: QA 1 , TYPE: ADAPTER , 8/2/2005
CKX094W COLOR: RED , SIZE: #6-32 , LENGTH: 1.04 IN , VOLTS:
Inspection Type Designation Description or Title Revision or
Procedure Date
1100 VRMS MAX , AMPS: 25 AMPS MAX ,
CONNECTION: 0.250 IN LONG MALE STUD ,
CONSTRUCTION: ALLOY 360 1/2 HARD PER MIL-C-
26074, NICKEL PLATED, INSULATION: NYLON 6, 20%
GLASS FILLE
- D.
PEG PKG NO. FLUID, TYPICAL, QA 1, DAMPING, 5 GAL METHYL 3
CWR391W ALKYL SILICONE HYDRAULIC FLUID; GE SILICONE
PART # SF 1147 OR MOMENTIVE PERFORMANCE
PART# SF 1147 TYP TVA USE: PAUL MUNROE
HYDRAULIC SNUBBER, UPPER S/G SUPPORT
PEG PKG NO. AVCO SCRAM PILOT SOLENOID VALVES 2
DCN51240M4
PEG PKG No. TERMINAL LUGS OR COMPRESSION TYPE 9/12/2014
G5940-2-1508 ELECTRICAL CONNECTOR
- S. OEM, THOMAS AND
BETTS (COLOR KEYED PRODUCT LINE INSULATED
AND NON INSULATED)
PO 3336520 QA 2, PR 1787250, HEATER.OVERLOAD, QA 2, 0
CR123C148A- IN ACCORDANCE WITH TVA RFQ
25284
PO 3575212 VALVE, SOLENOID, QA 1, SSPV, 1/2 IN, FNPT, 120, 60, 0
10.8, SCRAM PILOT VALVE AB, 2 NORMAL
OPERATING PRESSURE: 50 - 150 PSIG, W/72" LONG
LEAD WIRE
- S.
PO 7247802 FLUID, TYPICAL, QA 1, DAMPING, 5 GAL METHYL 0
ALKYL SILICONE HYDRAULIC FLUID; GE SILICONE
PART # SF 1147 OR MOMENTIVE PERFORMANCE
PART# SF 1147 TYP TVA USE: PAUL MUNROE
HYDRAULIC SNUBBER, UPPER S/G SUPPORT
PO_6709875 CABLE,INSULATED, QA 1, SWITCHBOARD, #14 AWG, 1
COPPER, STRANDED, FRXLPE, GRAY, 600, 90 DEG C,
41, 1E-L
SCR 108494-0 CABLE,INSULATED, QA 1, SWITCHBOARD, #14 AWG, 5/3/2021
COPPER,
STRANDED, FRXLPE, GRAY, 600, 90 DEG C, 41, 1E-
Inspection Type Designation Description or Title Revision or
Procedure Date
LOCA
SS-E12.7.01 SWITCHBOARD WIRE WITH FLAME-RETARDANT 9/10/1997
CROSS-LINKED
POLYETHYLENE INSULATION
TE CGIOH01 EPRI CGI JOINT UTILITY TASK GROUP COMMERCIAL 0
GRADE ITEM EVALUATION FOR BIMETALLIC
OVERLOAD HEATERS
TVA Audit No.: Automatic Valve Corporation 04/10/2015
2015N-26
TVA Audit/Survey Automatic Valve Corporation 02/14/2018
No.: 2018N-02
TVA Audit/Survey LAKE ENGINEERING CO 06/03/2022
No.: 2022N-27
TVA-NQA- Nuclear Quality Assurance Plan (NQAP) (Quality 41
PLN89-A Assurance Program Description)
Procedures NEDP-8.0 Evaluations for Procurement of Materials, Items, and 1, 3, 6, 7
Services
NEDP-8.1 Technical Evaluation for Safety Classification of Materials, 1
Items, and Services
NEDP-8.2 Technical Evaluation for Procurement of Safety Related 1
and Quality Related Material, Items, and Services
NEDP-9 Seismic/Structural Qualification 12
NPG-SPP-03.16 Supplier Audits, Surveys, Source Surveillances and ASL 5
Maintenance
NPG-SPP-03.5 Regulatory Reporting Requirements 18
NPG-SPP-04.001 Procurement of Material, Labor and Services 15
NPG-SPP-04.003 Material Storage and Handling 4
NPG-SPP-04.2 Material Receipt and Inspection 4
NPG-SPP-04.2 Material Receipt and Inspection 5
NPG-SPP- Parts Quality Initiative (PQI) Process 0
09.18.16
SC-SPP-04.022 Material Receipt, Inspection, Storage and Handling Issue, 3
Control and Return
SC-SPP-04.023 Inventory Accuracy 2
Inspection Type Designation Description or Title Revision or
Procedure Date
Work Orders WOs 119177439, 118981414, 121014518, 120320942, various
118581204, 121154701
10