SUBJECT:

BROWNS FERRY NUCLEAR PLANT - SECURITY BASELINE INSPECTION REPORT 05000259/2023401 AND 05000260/2023401 AND 05000296/2023401

Dear James Barstow:

On February 9, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Browns Ferry Nuclear Plant. On February 9, 2023, the NRC inspectors discussed the results of this inspection with D. Charlton and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000259 and 05000260 and 05000296 License Nos. DPR-33 and DPR-52 and DPR-68

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000259, 05000260 and 05000296

License Numbers:

DPR-33, DPR-52 and DPR-68

Report Numbers:

05000259/2023401, 05000260/2023401 and 05000296/2023401

Enterprise Identifier:

I-2023-401-0020

Licensee:

Tennessee Valley Authority

Facility:

Browns Ferry Nuclear Plant

Location:

Athens, AL

Inspection Dates:

January 9-13, 2023 (TVA Corporate Office)

February 6-9, 2023 (Browns Ferry Nuclear Plant)

Inspectors:

J. Tornow, Physical Security Inspector

J. Wallo, Senior Physical Security Inspector

R. Womack, Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Browns Ferry Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated:

Access Authorization

(1) Tier I: All Requirements Tier II: 02.05 a, b; 02.07 a, b; 02.08 a, c Tier III: 02.09; 02.10 a-c

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements Tier II: (02.05 a-c, 02.06 a, 02.07 a-d)

Tier III: (02.08)

71130.08 - Fitness For Duty Program

Fitness For Duty Program (1 Sample)

(1) Tier I: All Requirements Tier II: 02.05 a-h; 02.06 a-g; 02.07 a-e; 02.08 a, b; 02.09 a-e Tier III: 02.10; 02.11 a; 02.12 a - e; 02.14 a-c

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

procedure elements: Security Plan Changes

(1) Since the last NRC inspection of this program area, Security Plan Revision 22, was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2),that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) Unit 1 January 2022 through January 2023 Unit 2 January 2022 through January 2023 Unit 3 January 2022 through January

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On February 9, 2023, the inspectors presented the security baseline inspection results to D. Charlton and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.01

Corrective Action

Documents

1767276

Background Investigation Challenge

04/12/2022

71130.01

Corrective Action

Documents

1786072

CAS/SAS Access

10/04/2022

71130.01

Corrective Action

Documents

1803528

Interaction with Law Enforcement

09/20/2022

71130.01

Corrective Action

Documents

1805629

Control Room Access

10/03/2022

71130.01

Procedures

NPG-SPP-14.5

Access Authorization

Revision 23

71130.01

Procedures

NSDP-23

Plant Access / Badging Process

Revision 21

71130.01

Procedures

NSDP-24

Access Authorization Program

Revision 15

71130.01

Procedures

NSDP-38

Access Authorization - Reviewing Officials

Revision 11

71130.01

Procedures

NSDP-43

Adjudication Guidelines

Revision 7

71130.01

Self-Assessments 1799295

Self Assessment of the Access Authorization Program

2/07/2022

71130.02

Corrective Action

Documents

29439

Loss of Alarm Capability

2/02/2023

71130.02

Corrective Action

Documents

1831363

Unauthorized Individual Into a Vial Area

01/26/2023

71130.02

Procedures

NSDP-23

Plant Access/Badging Process

Rev. 21

71130.02

Procedures

NSDP-7.6

Personnel Access Control

Rev. 2

71130.08

Corrective Action

Documents

1770106

Recommend a review to determine if a post event FFD test

may be require

04/18/2022

71130.08

Corrective Action

Documents

1789640

Fatigue assessment for Security Event

07/21/2022

71130.08

Corrective Action

Documents

20164

Nuclear Fatigue Rule Violation

2/01/2022

71130.08

Procedures

NPG-SPP-03.21

Nuclear Fatigue Management Program

Revision 29

71130.08

Procedures

NPG-SPP-14.1

Fitness-For-Duty

Revision 21

71130.08

Procedures

NPG-SPP-14.10

Fitness-for-Duty - Alcohol and Drug Testing Requirements

Revision 6

71130.08

Procedures

NPG-SPP-14.11

Fitness-for-Duty - Medical Review Officers

Revision 3

71130.08

Procedures

NPG-SPP-14.12

Fitness-for-Duty - Intoxilyzers

Revision 6

71130.08

Procedures

NPG-SPP-14.14

Fitness-for-Duty - Training and Field Support for the Fitness-

Revision 5

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

for-Duty Program

71130.09

Procedures

NSDP-45

Security Plan and Procedure Control Processing

Rev. 0003

71151

Procedures

NSDP-29

Tracking and Trending and NRC Performance Indicators

Rev. 10