GO2-86-223, Forwards Request for Amend to License NPF-21,revising Physical Security Plan.Request Withheld (Ref 10CFR73.21). Fee Paid

From kanterella
Jump to navigation Jump to search

Forwards Request for Amend to License NPF-21,revising Physical Security Plan.Request Withheld (Ref 10CFR73.21). Fee Paid
ML20140F767
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/20/1986
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Adensam E
Office of Nuclear Reactor Regulation
References
GO2-86-223, TAC-61482, NUDOCS 8604010154
Download: ML20140F767 (4)


Text

-

THE ATTACHED DOCUMENT CONTAINS SAFEGUARDS INFORMATION. (10CFR 73.21)

Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 March 20,1986 G02-86-223 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention: Ms. E . G. Adensam, Project Director BWR Project Directorate No. 3 Division of BWR Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

NUCLEAR PLANT NO. 2 REQUEST FOR LICENSE AMENDMENT TO THE WNP-2 PHYSICAL SECURITY PLAN AS AUTHORIZED IN OPERATING LICENSE NPF-021 PARAGRAPH 2.E In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, the Supply System hereby requests an amendment to the WNP-2 Physical Security Plan as authorized in paragraph 2.e of the WNP-2 operating license (see attachment).

The attachment contains. safeguards infomation concerning security measures for the physical protection of Supply System facilities in which special nuclear material is used. This information is to be protected in accordance with 10 CFR 73.21. As such, justification for the change and supporting evaluation, which are safeguards infomation, are provided in the attachment.

The Supply System has reviewed the attached change per 10 CFR 50.59 and 50.92 and has determined that it does not present an unreviewed safety question nor, as discussed in the attachment, does it:

1. Involve a significant increase in the probability or consequences of an accident previously evaluated;
2. Create the possibility of a new or different kind of accident from any accident previously evaluated; or -
3. Involve a significant reduction in the margin of safety.

This change has been reviewed and approved by the WNP-2 Plant Operations Committee and the Supply System Corporate Nuclear Safety Review Board. In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter.

The Supply System has evaluated this request in accordance with the criteria contained in 10 CFR 10.21, and has included a warrant for One hundred fifty dollars ($150.00) as initial payment for this application for amendment under ()h Facility Category A (Power Reactors). s g%0 P

ggm PDR

,CHED DOCUMENT CONTAINS THIS PAGE UNCONTROLLED MIEN SEPARATED FROM ENCLOSURES. I S INFORMATl0N. (10CFR 73.21)

- q THE ATTACHED DOCUMENT CONTAINS S.CECUARDS INFORMATl0N. (ICCFR 73.21)

. Ms. E. G. Adensam Page 2 Amendment to WNP-2 Physical Security Plan Because the attachment is safeguards infomation and requires accountability, distribution has been purposely limited. Should specific members of your staff require the attachment for review purposes, please contact Mr. P. L.

Powell, Manager, WNP-2 Licensing.

A c' /

/ /

  1. G. C. Sorensen, Manager Regulatory Programs

Attachment:

Revision 11, WNP-2 Physical Security Plan License Considerations (6 copies)

CC: R. C. Barr, Nuclear Regulatory Commission (w/o attachments)

J. O. Bradfute - Nuclear Regulatory Comission (w/o attachments)

C. Eschels, EFSEC (w/o attachments)

J. B. Martin, Nuclear Regulatory Comission, Region V (copy attached)

E. Revell, Bonneville Power Authority, (w/o attachments)

N. S. Reynolds, B. L. C. P AND R (w/o attachments)

THIS PAGE UNCONTROLLED WHEN SEPARATED FROM ENCLOSURES.

T!1E ATT/.CHED DOCUMENT CONTAINS e --- pg;; -,

"P.'. (!0CFR 73.21)

o License Amendment Request WNP-2 Physical Security Plan STATE OF WASHINGTON )

Subject:

)

County of Benton )

I, G. C. SORENSEN, being duly sworn, subscribe to and say that I am the Manager Regulatory Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the ~appitcant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the. statements made in it are true. The foregoing contains safeguards information which is to be withheld from public disclosure and protected in accordance with 10CFR73.21.

DATE ja //?},M/J ,1986

[

  1. G. C. Sorefisen, Manager Regulatory Programs On this day personally appeared before me G. C. SORENSEN to me known to be the individual who executed the foregoing instrument and acknowledge that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIVEN under my hand and seal this J0. . day of % , r.t ) , ,1986.

ANotaryAPublic%dn A in ' tLd for the n

State of Washington Residing at c oh b ryid ) W CO k@M