WO 02-0061, November 2002 Monthly Operating Report for Wolf Creek Generating Station

From kanterella
Jump to navigation Jump to search
November 2002 Monthly Operating Report for Wolf Creek Generating Station
ML023520040
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/10/2002
From: Jacobs D
Wolf Creek
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
WO 02-0061
Download: ML023520040 (3)


Text

W@LF CREEK

-'NUCLEAR OPERATING CORPORATION ,

Donna Jacobs Plant Manager - _-: - l-..

"WO02-0061 U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk Washington, DC 20555

Subject:

Docket No. 50-482: November 2002 Monthly Operating Report Gentlemen:

Attached to this' letter is the Ndverfiber,'2002, Monthly Operating Report for the Wolf

"-Creek Generating -Station., This submittal s- being made in ' accordance with the requirements of Wolf Creek Generating Station Technical -Specification 5.6.4)-"Monthly Operating Reports." This submittal also follows-the guidance*oftGeneric Letter 97-02, "Revised Contents of the MonthlyOperating Report." If you have questions regarding this report, please contact me at (620) 364.4246, or Mr.oTdn, H'arrii at (620) 364-4038, Very trly yours

- - - -Donna Jacobs DJ~rlg Attachment cc: J. N. Donohew (NRC), w/a D. N. Graves (NRC), w/a E. W. Merschoff (NRC), w/a -

Senior Resident Inspector (NRC), wla.

P.O. Box 411 /Burlington, KS 66839 I Phone. (620) 364.-8831

. . An Equal Opportunty Employer M/F/HC/VET-

Attachment to WO 02-0061 Page 1 of 2 OPERATING DATA REPORT Report Number: 213 DOCKET NO.: 50-482 UNIT NAME: Wolf Creek Generating Station DATE: December 6, 2002 COMPLETED BY: J. L. Yunk TELEPHONE: (620) 364-4272 REPORT MONTH: November 2002 I1. IDesign Electrical Rating (MWe - Net): I 1170

2. Maximum Dependable Capacity (MWe - Net: 1170 This Month Year to Date Cumulative 3.. Number of Hours Reactor Critical: 720.0 7,027.1 129,391.8
4. Number of Hours Generator On-Line: 720.0 6,951.6 128,201.8

.5. Unit Reserve Shutdown Hours: 0.0 0.0 339.8 6.-- Net Electrical*Energy Generated (MWH) 858,367 8,154,031 145,191,033 Wolf Creek Generating Station Monthly Operating Report November 2002 Page 1 of 2

Attachment to WO 02-0061 Page 2 of 2 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.: 50-482 UNIT NAME: Wolf Creek Generating Station DATE: December 6, 2002 COMPLETED BY: J. L. Yunk TELEPHONE: (620) 364-4272 Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS/COMMENTS No. Date S: SCHEDULED (Hours) (1) (2)

.1 £ .1 a ________________________________ a

SUMMARY

The unit operated in Mode 1, 100% power, from November 1, 2002, through November 30, 2002.

(1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD: 1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2. MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4. CONTINUATION

5. OTHER Wolf Creek Generating Station Monthly Operating Report November 2002 Page 2 of 2