MONTHYEARWO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations WO 23-0009, Financial Protection Levels2023-03-31031 March 2023 Financial Protection Levels WO 22-0056, Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082022-12-19019 December 2022 Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 22-0021, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2022-08-29029 August 2022 Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report WO 22-0015, Generation Station - Guarantee of Payment of Deferred Premiums2022-05-0606 May 2022 Generation Station - Guarantee of Payment of Deferred Premiums WO 22-0011, Operating Corp., Financial Protection Levels2022-03-29029 March 2022 Operating Corp., Financial Protection Levels WO 22-0007, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-0909 March 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations WO 21-0064, Operating Corporation, Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082021-12-29029 December 2021 Operating Corporation, Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 21-0031, (Wcgs), Supplement to One-Time Request for Exemption from the Biennial Emergency Preparedness2021-08-12012 August 2021 (Wcgs), Supplement to One-Time Request for Exemption from the Biennial Emergency Preparedness WO 21-0027, One-Time Request for Exemption from the Biennial Emergency Preparedness2021-07-29029 July 2021 One-Time Request for Exemption from the Biennial Emergency Preparedness WO 21-0015, License Amendment Request (LAR) for Revision to the Emergency Plan2021-05-25025 May 2021 License Amendment Request (LAR) for Revision to the Emergency Plan WO 21-0020, Operating Corp - Guarantee of Payment of Deferred Premiums2021-05-0707 May 2021 Operating Corp - Guarantee of Payment of Deferred Premiums WO 21-0019, Operating Corp Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations2021-04-14014 April 2021 Operating Corp Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations WO 21-0014, Financial Protection Levels2021-03-30030 March 2021 Financial Protection Levels WO 21-0010, Submittal of Revision 34 to Updated Safety Analysis Report2021-03-11011 March 2021 Submittal of Revision 34 to Updated Safety Analysis Report WO 21-0002, Notification of Readiness for Supplemental Inspection 927232021-01-28028 January 2021 Notification of Readiness for Supplemental Inspection 92723 WO 20-0058, Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082020-12-23023 December 2020 Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 20-0050, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange2020-11-10010 November 2020 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange WO 20-0040, Corrected Revision 33 of the Wolf Creek Generating Station Updated Safety Analysis Report2020-07-23023 July 2020 Corrected Revision 33 of the Wolf Creek Generating Station Updated Safety Analysis Report WO 20-0048, Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating2020-06-30030 June 2020 Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating WO 20-0047, Guarantee of Payment of Deferred Premiums2020-05-0707 May 2020 Guarantee of Payment of Deferred Premiums WO 20-0029, License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2020-04-20020 April 2020 License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies WO 20-0024, Financial Protection Levels2020-03-31031 March 2020 Financial Protection Levels WO 19-0059, Docket No. 50-482: Wolf Creek Nuclear Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082019-12-23023 December 2019 Docket No. 50-482: Wolf Creek Nuclear Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 19-0033, License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System2019-08-29029 August 2019 License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System WO 19-0031, Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-08-0808 August 2019 Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 WO 19-0011, Financial Protection Levels2019-03-27027 March 2019 Financial Protection Levels WO 19-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-03-11011 March 2019 Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 WO 18-0045, Submittal of Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Revision to the Emergency Plan2018-11-19019 November 2018 Submittal of Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Revision to the Emergency Plan WO 18-0047, Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term WO 18-0036, Operating Corporation (WCNOC) - Notification of Readiness for Supplemental Inspection2018-08-15015 August 2018 Operating Corporation (WCNOC) - Notification of Readiness for Supplemental Inspection WO 18-0034, Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-08-0909 August 2018 Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term WO 18-0031, Inservice Inspection (ISI) Program Relief Request from the Requirements of American Society of Mechanical Engineers (ASME) Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 12018-07-23023 July 2018 Inservice Inspection (ISI) Program Relief Request from the Requirements of American Society of Mechanical Engineers (ASME) Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 WO 18-0016, License Amendment Request for Revision to the Emergency Plan2018-05-0909 May 2018 License Amendment Request for Revision to the Emergency Plan WO 18-0014, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-16016 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations WO 18-0015, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2018-04-0505 April 2018 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) WO 18-0004, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ...2018-01-15015 January 2018 Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ... WO 17-0093, License Amendment Request (LAR) for Revision to the Emergency Plan2017-12-19019 December 2017 License Amendment Request (LAR) for Revision to the Emergency Plan WO 17-0092, Request for Regulatory Conference (EA-17-149)2017-11-0808 November 2017 Request for Regulatory Conference (EA-17-149) WO 17-0065, Submittal of LER 17-S01-00 for Wolf Creek Nuclear Operating Corp., Regarding Contraband Introduced Into the Protected Area Boundary2017-10-10010 October 2017 Submittal of LER 17-S01-00 for Wolf Creek Nuclear Operating Corp., Regarding Contraband Introduced Into the Protected Area Boundary WO 17-0042, Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme2017-04-26026 April 2017 Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme WO 17-0041, Supplement to Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2017-04-20020 April 2017 Supplement to Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report WO 17-0033, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations.2017-04-17017 April 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations. WO 17-0023, Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2017-03-27027 March 2017 Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report WO 17-0026, Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses2017-03-22022 March 2017 Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses WO 17-0013, Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme2017-03-16016 March 2017 Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme WO 17-0009, Revision 30 to Updated Safety Analysis Report2017-03-0909 March 2017 Revision 30 to Updated Safety Analysis Report WO 16-0068, Docket No. 50-482: Request for Regulatory Conference2016-12-21021 December 2016 Docket No. 50-482: Request for Regulatory Conference 2023-05-17
[Table view] |
Text
(ICM B.5.b compliance)
W4LF CREEK NUCLEAR OPERATING CORPORATION Stephen E. Hedges Vice President Operations and Plant Manager May 31, 2005 WO 05-0019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, Maryland 20852
Subject:
Docket No. 50-482: Response to NRC Guidance Regarding Mitigation Strategies Gentlemen:
The NRC issued Orders For Interim Safeguards and Security Compensatory Measures ("Order EA-02-026" or 1ICM Order") dated February 25, 2002, for the Wolf Creek Generating Station (WCGS).
Order EA-02-026 imposed requirements on nuclear power plants licensed pursuant to the Atomic Energy Act of 1954 and Title 10 of the Code of Federal Regulations.Section III.A of the Order required licensees to implement certain changes in physical security plans and safeguards contingency plans on an interim basis until final requirements were established.
Among other requirements, Wolf Creek Nuclear Operating Corporation (WCNOC) was required to complete implementation of the requirements of Section lI.B.5.b. of Order EA-02-026 by August 31, 2002.
Subsequently, the NRC issued Orders, dated April 29, 2003, Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors ('Order EA-03-086" or 'DBT Order") and other security related Orders (collectively "Orders") for WCGS. In many ways, Order EA-03-086 complemented or superseded requirements the interim measures imposed by Order EA-02-026.
NOTE: ATTACHMENT 1TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENT, THIS LETTER IS
'DECONTROLLED."
SAFEGUARDS INFORMATION
, ,f5 3 P.O. Box 411 I Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET
WO 05-0019 Page 2 of 3 (ICM B.5.b compliance)
As required by Order EA-03-086, the plans for the above-mentioned licensed facility have been implemented. Subsequently, WCNOC was requested to respond to your letter dated February 25, 2005, NRC Staff Guidance for Use in Achieving Satisfactory Compliance with February 25, 2002, Order Section B.5.b, ("NRC B.5.b. Guidance") by May 31, 2005, and to implement appropriate enhancement to current mitigation strategies by August 31, 2005. Specifically, nuclear power plant licensees were requested by Enclosure 2, Developing Mitigating Strategies
/ Guidance for Nuclear Power Plants to Respond to Loss of Large Areas of the Plant in Accordance with B.5.b of the February 25, 2002, Order (dated February 24, 2005) ("NRC B.5.b.
Guidance"), to the February 25, 2005, letter to review the Areas of Consideration delineated in Attachment A to that Enclosure and evaluate additional considerations for potential inclusion in the licensees' mitigating strategies that licensees deemed appropriate in accordance to Attachment B to that Enclosure.
Subsequently, the Nuclear Energy Institute ("NEI"), in conjunction with the NEI Security Working Group, developed and issued guidance for licensee use ("NEI Guidance") to assist licensees in responding to the February 25, 2005, letter.
As requested in the February 25, 2005, letter, WCNOC has reviewed the information in Attachments A and B in accordance with the NEI Guidance and is hereby submitting, as a Safeguards Information attachment to this letter (Attachment 1), WCNOC's evaluation of the information the NRC provided. Attachment 1 reflects the results of a comprehensive and thorough review of the guidance and describes the considerations that WCNOC either has already implemented or intends to implement at WCGS by August 31, 2005.
The primary guiding principles used in the conduct of this evaluation were (1) whether or not equipment and resources were "readily available," and (2) if equipment is readily available, can it be effectively utilized in a licensee's mitigating strategy. WCNOC considered "readily available" to mean that the equipment or resources were already licensee owned, under contract, or part of an existing Memorandum of Understanding. Further, even if equipment and resources are readily available, the second criterion is to ensure that the equipment can be used in a mitigating strategy in an effective manner. Even if the equipment is readily available, it is of no value if it cannot be effective in implementing the mitigating strategy.
In accordance with these principles, mitigative strategies are being implemented to address the NRC B.5.b. Guidance. The completion of actions required to implement these strategies are considered to be commitments for that purpose and will be managed to completion in accordance with WCNOC's commitment management system. to this letter is the schedule that WCNOC has developed regarding the implementation of commitments resulting from the evaluations documented in Attachment 1.
_ 1 NOTE: ATTACHMENT 1 TO THIS LETTER CONTAINS SAFEGUARDS INFORMATIONW AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENT, THIS LETTER IS
'DECONTROLLED."
SAFEGUARDS INFORMATION
WO 05-0019 Page 3 of 3 (ICM B.5.b compliance)
If you have any questions concerning this matter, please contact me at (620) 364-4190, or Mr.
Kevin Moles at (620) 364-4126.
Very truly rs, tephen E. Hedges SEH/rlg Attachments 1) WCNOC's evaluation of the information the NRC provided
- 2) Schedule for implementation/commitments cc: J. E. Dyer, Director, Office of Nuclear Reactor Regulation, w/a 2 J. N. Donohew (NRC), w/a 1 & 2 W. B. Jones (NRC), w/a 2 B. S. Mallett (NRC), w/a 2 Senior Resident Inspector (NRC), w/a 2 NOTE: ATTACHMENT 1TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENT, THIS LETTER IS
'DECONTROLLED."