Response to NRC Inspection Report and Preliminary White Finding
ML22230C923
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 08/18/2022
From: Wake B
Constellation Energy Generation
To: Robert Ruiz
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, NRC/RGN-III
References
SVP-22-050
Download: ML22230C923 (2)


Text

Constellation, SVP-22-050 August18, 2022 U.S. Nuclear Regulatory Commission, Region Ill ATTN: Robert Ruiz 2443 Warrenville Road, Suite 210

  • Lisle, IL 60532-4352 Quad Cities Nuclear Power Station, Unit 1 and 2 Renewed Facility Operating License No. DPR-29 and DPR-30 NRC Docket No. 50-254 and 50-265

Subject:

Response to NRC Inspection Report and Preliminary White Finding

Reference:

Letter from J. Lara for J. Heisserer (U.S. NRC Region Ill) to the D.. Rhoades (Constellation Energy Generation, LLC), "Quad Cities Nuclear Power Station -

NRC Inspection Report 05000254/2022090 and 05000265/2022090; Preliminary White Finding," dated August 8, 2022 In the referenced letter, the NRC documented a finding concerning a failure of one of the four electromatic relief valves (ERV) associated with the automatic depressurization subsystem (ADS). The ERV failed to actuate during surveillance testing, which was found to be caused by internal binding of the valve actuator due to the improper rebuild of the actuator prior to being installed on April 7, 2020.

The referenced letter requested verbal and written notification within 10 days of the date of the letter regarding Constellation Energy Generation, LLC (CEG) intention to (1) request a regulatory conference to present to the NRC CEG's perspective on the facts and assumptions the NRC used to arrive at the finding and assess its significance, or (2) submit CEG's position on the finding to the NRC in writing.

On August 18, 2022, Brian Wake verbally discussed CEG's decision to submit a written response to the preliminary White finding with the NRC. This letter confirms that CEG intends to respond to the preliminary White finding with a docketed letter. CEG's written response will be submitted no later than September 16, 2022, which is within the 40 days required in the referenced letter.

There are no regulatory commitments contained in this letter.

Should you have any questions regarding this matter, please contact Mark Humphrey at (309) 227-2800.

Brian Wake Site Vice President Quad Cities Nuclear Power Station cc:

NRC Document Control Desk NRC Project Manager, NRR for QCNPS - Robert.Kuntz@NRC.gov NRC SenioF Resident Inspector - Quad Cities Nuclear Power Station