SVP-05-058, Regulatory Commitment Change Summary Report
ML052220358 | |
Person / Time | |
---|---|
Site: | Quad Cities |
Issue date: | 07/28/2005 |
From: | Tulon T Exelon Generation Co, Exelon Nuclear |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
SVP-05-058 | |
Download: ML052220358 (2) | |
Similar Documents at Quad Cities | |
---|---|
Category:Letter type:SVP
MONTHYEARSVP-24-065, Offsite Dose Calculation Manual (ODCM) Section 12.2.2 Radioactive Gaseous Effluent Monitoring Instrumentation Report Main Chimney High Range Noble Gas Monitor2024-10-29029 October 2024
[Table view]Offsite Dose Calculation Manual (ODCM) Section 12.2.2 Radioactive Gaseous Effluent Monitoring Instrumentation Report Main Chimney High Range Noble Gas Monitor SVP-24-059, Correction to Registration of Use of Casks to Store Spent Fuel2024-10-0404 October 2024 Correction to Registration of Use of Casks to Store Spent Fuel SVP-24-054, Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of Top Guide Rim Welds2024-09-11011 September 2024 Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of Top Guide Rim Welds SVP-24-049, Owners Activity Report Submittal Sixth 10-Year Interval 2024 Refueling Outage Activities2024-08-0707 August 2024 Owners Activity Report Submittal Sixth 10-Year Interval 2024 Refueling Outage Activities SVP-24-048, Registration of Use of Casks to Store Spent Fuel2024-07-31031 July 2024 Registration of Use of Casks to Store Spent Fuel SVP-24-043, Registration of Use of Casks to Store Spent Fuel2024-07-0505 July 2024 Registration of Use of Casks to Store Spent Fuel SVP-24-041, Regulatory Commitment Change Summary Report2024-07-0505 July 2024 Regulatory Commitment Change Summary Report SVP-24-040, Registration of Use of Casks to Store Spent Fuel2024-06-25025 June 2024 Registration of Use of Casks to Store Spent Fuel SVP-24-039, Ile Post Exam Package Letter2024-06-12012 June 2024 Ile Post Exam Package Letter SVP-24-034, Annual Radiological Environmental Operating Report2024-05-10010 May 2024 Annual Radiological Environmental Operating Report SVP-24-028, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2024-04-26026 April 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVP-24-029, Radioactive Effluent Release Report for 20232024-04-26026 April 2024 Radioactive Effluent Release Report for 2023 SVP-24-024, Corrected Radioactive Effluent Release Report for 20222024-04-0505 April 2024 Corrected Radioactive Effluent Release Report for 2022 SVP-24-023, Ile Outline Submittal Letter2024-03-29029 March 2024 Ile Outline Submittal Letter SVP-24-018, Ile Proposed Exam Submittal Letter2024-03-13013 March 2024 Ile Proposed Exam Submittal Letter SVP-23-038, Owners Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities2023-08-14014 August 2023 Owners Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities SVP-23-031, Regulatory Commitment Change Summary Report2023-07-14014 July 2023 Regulatory Commitment Change Summary Report SVP-23-018, Radioactive Effluent Release Report for 20222023-04-28028 April 2023 Radioactive Effluent Release Report for 2022 SVP-23-016, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2023-04-20020 April 2023 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVP-23-015, Annual Dose Report for 20222023-04-18018 April 2023 Annual Dose Report for 2022 SVP-23-011, Notification of Readiness for NRC 95001 Inspection (EA-22-062)2023-03-28028 March 2023 Notification of Readiness for NRC 95001 Inspection (EA-22-062) SVP-22-072, Manual Scram Due to Feedwater Regulator Valve Failure Increasing Reactor Water Level2022-12-30030 December 2022 Manual Scram Due to Feedwater Regulator Valve Failure Increasing Reactor Water Level SVP-22-061, Registration of Use of Casks to Store Spent Fuel2022-10-0404 October 2022 Registration of Use of Casks to Store Spent Fuel SVP-22-057, Response to Apparent Violation EA-22-062 and Preliminary White Finding Regarding the Failure of One Electromatic Relief Valve2022-09-15015 September 2022 Response to Apparent Violation EA-22-062 and Preliminary White Finding Regarding the Failure of One Electromatic Relief Valve SVP-22-056, Registration of Use of Casks to Store Spent Fuel2022-09-13013 September 2022 Registration of Use of Casks to Store Spent Fuel SVP-22-050, Response to NRC Inspection Report and Preliminary White Finding2022-08-18018 August 2022 Response to NRC Inspection Report and Preliminary White Finding SVP-22-046, Registration of Use of Casks to Store Spent Fuel2022-08-17017 August 2022 Registration of Use of Casks to Store Spent Fuel SVP-22-042, Owners Activity Report Submittal Fifth 10-Year Interval 2020 Refueling Outage Activities2022-07-22022 July 2022 Owners Activity Report Submittal Fifth 10-Year Interval 2020 Refueling Outage Activities SVP-22-041, Registration of Use of Casks to Store Spent Fuel2022-07-13013 July 2022 Registration of Use of Casks to Store Spent Fuel SVP-22-036, Offsite Dose Calculation Manual (ODCM) Section 12.2.2, Radioactive Gaseous Effluent Monitoring Instrumentation Report Main Chimney High Range Noble Gas Monitor2022-06-10010 June 2022 Offsite Dose Calculation Manual (ODCM) Section 12.2.2, Radioactive Gaseous Effluent Monitoring Instrumentation Report Main Chimney High Range Noble Gas Monitor SVP-22-029, Annual Radiological Environmental Operating Report for 20212022-05-13013 May 2022 Annual Radiological Environmental Operating Report for 2021 SVP-22-026, Radioactive Effluent Release Report for 20212022-04-29029 April 2022 Radioactive Effluent Release Report for 2021 SVP-22-024, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2022-04-21021 April 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVP-22-021, Annual Dose Report for 20212022-04-14014 April 2022 Annual Dose Report for 2021 SVP-22-018, Core Operating Limits Report for Quad Cities Unit 2 Cycle 272022-04-0808 April 2022 Core Operating Limits Report for Quad Cities Unit 2 Cycle 27 SVP-21-041, Regulatory Commitment Change Summary Report2021-07-15015 July 2021 Regulatory Commitment Change Summary Report SVP-21-040, Owner'S Activity Report Submittal Fifth 10-Year Interval 2021 Refueling Outage Activities2021-06-29029 June 2021 Owner'S Activity Report Submittal Fifth 10-Year Interval 2021 Refueling Outage Activities SVP-21-028, Annual Radiological Environmental Operating Report2021-05-13013 May 2021 Annual Radiological Environmental Operating Report SVP-21-024, Annual Dose Report for 20202021-04-22022 April 2021 Annual Dose Report for 2020 SVP-21-001, 10 CFR 50.59 /10 CFR 72.48 Summary Report2021-01-0404 January 2021 10 CFR 50.59 /10 CFR 72.48 Summary Report SVP-20-074, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report2020-10-0808 October 2020 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report SVP-20-069, Registration of Use of Casks to Store Spent Fuel2020-10-0101 October 2020 Registration of Use of Casks to Store Spent Fuel SVP-20-064, Registration of Use of Casks to Store Spent Fuel2020-09-0808 September 2020 Registration of Use of Casks to Store Spent Fuel SVP-20-056, Registration of Use of Casks to Store Spent Fuel for Quad Cities Nuclear Power Station, Units 1 and 22020-08-13013 August 2020 Registration of Use of Casks to Store Spent Fuel for Quad Cities Nuclear Power Station, Units 1 and 2 SVP-20-049, Regulatory Commitment Change Summary Report2020-07-14014 July 2020 Regulatory Commitment Change Summary Report SVP-20-053, Owner'S Activity Report Submittal: Fifth 10-Year Interval 2020 Refueling Outage Activities2020-07-14014 July 2020 Owner'S Activity Report Submittal: Fifth 10-Year Interval 2020 Refueling Outage Activities SVP-20-046, Registration of Use of Casks to Store Spent Fuel2020-06-30030 June 2020 Registration of Use of Casks to Store Spent Fuel SVP-20-035, Annual Radiological Environmental Operating Report2020-05-14014 May 2020 Annual Radiological Environmental Operating Report SVP-20-030, Radioactive Effluent Release Report for 20192020-04-30030 April 2020 Radioactive Effluent Release Report for 2019 SVP-20-026, Annual Dose Report for 20192020-04-30030 April 2020 Annual Dose Report for 2019 2024-09-11 Category:Report MONTHYEARRS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024
[Table view]Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-046, 10 CFR 50.46 Annual Report2024-05-0606 May 2024 10 CFR 50.46 Annual Report RS-22-090, Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies2022-07-13013 July 2022 Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-22-006, Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome Fuel2022-01-20020 January 2022 Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome Fuel SVP-21-041, Regulatory Commitment Change Summary Report2021-07-15015 July 2021 Regulatory Commitment Change Summary Report RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting SVP-20-074, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report2020-10-0808 October 2020 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report RS-20-086, Renewed Facility Operating License Nos. DPR-29 and DPR-302020-09-24024 September 2020 Renewed Facility Operating License Nos. DPR-29 and DPR-30 ML19168A1962019-08-29029 August 2019 Staff Assessment of Flood Hazard Integrated Assessment RS-19-049, Submittal of 10 CFR 50.46 Annual Report2019-05-0202 May 2019 Submittal of 10 CFR 50.46 Annual Report ML19064B3712019-03-0505 March 2019 Enclosure B - QDC-0000-N-1481, Revision 3, Quad Cities Units 1 & 2 Post-LOCA Eab, LPZ, and CR Dose - AST Analysis. ML19064B3702019-03-0505 March 2019 Enclosure a - QDC-7500-M-2341, Revision 0, Quad Cities Units 1 & 2 Secondary Containment Drawdown Analysis. SVP-19-002, Submittal of 10 CFR 50.59, 10 CFR 72.48 Summary Report2019-01-0404 January 2019 Submittal of 10 CFR 50.59, 10 CFR 72.48 Summary Report RS-18-089, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109)2018-08-14014 August 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109) RS-18-087, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2018-08-14014 August 2018 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) RS-18-048, Submittal of 10 CFR 50.46 Annual Report Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors.2018-05-0202 May 2018 Submittal of 10 CFR 50.46 Annual Report Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors. SVP-17-046, Regulatory Commitment Change Summary Report2017-07-0606 July 2017 Regulatory Commitment Change Summary Report ML16271A3242016-10-31031 October 2016 Technical Review Documentation for Flooding Hazard Reevaluation of Quad Cities Nuclear Power Station, Units 1 and 2 RS-16-044, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima..2016-02-19019 February 2016 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.. ML15309A4932016-02-10010 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force ML15251A3842015-08-31031 August 2015 Attachment 9 - NP-3305NP, Revision 1, Mechanical Design Report for Quad Cities and Dresden Atrium 10XN Fuel Assemblies - Licensing Report. (Non-Proprietary) SVP-15-052, Submittal of Regulatory Commitment Change Summary Report2015-07-0808 July 2015 Submittal of Regulatory Commitment Change Summary Report RS-15-085, Provides Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentaiton (Order Number EA-12-051)2015-05-0707 May 2015 Provides Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentaiton (Order Number EA-12-051) RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 SVP-14-057, Owner'S Activity Report Submittal Fifth 10 Year Interval 2014 Refueling Outage Activities2014-08-0101 August 2014 Owner'S Activity Report Submittal Fifth 10 Year Interval 2014 Refueling Outage Activities ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14101A2282014-04-0707 April 2014 Holtec International Report No. HI-2125245, Revision 5, Licensing Report for Quad Cities Criticality Analysis for Inserts. RS-14-072, Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights..2014-03-31031 March 2014 Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights.. RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report.2013-12-19019 December 2013 Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. ML13317A9572013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Quad Cities Nuclear Power Station, TAC Nos.: MF1048 and MF1049 ML13199A0382013-07-16016 July 2013 Attachment 5 - Holtec International Report No. HI-2125245, Revision 2, Licensing Report for Quad Cities Criticality Analysis for Inserts - Non Proprietary Version IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee SVP-13-001, Summary Report of Completed Changes, Tests and Experiments for January 2011 - December 20122013-01-0404 January 2013 Summary Report of Completed Changes, Tests and Experiments for January 2011 - December 2012 ML12361A1002012-10-31031 October 2012 Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 1 of 10 ML12361A0952012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 12 of 15 ML12361A0942012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 11 of 15 ML12361A0932012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 10 of 15 2024-05-06 Category:Miscellaneous MONTHYEARSVP-21-041, Regulatory Commitment Change Summary Report2021-07-15015 July 2021
[Table view]Regulatory Commitment Change Summary Report ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML19168A1962019-08-29029 August 2019 Staff Assessment of Flood Hazard Integrated Assessment SVP-19-002, Submittal of 10 CFR 50.59, 10 CFR 72.48 Summary Report2019-01-0404 January 2019 Submittal of 10 CFR 50.59, 10 CFR 72.48 Summary Report RS-18-048, Submittal of 10 CFR 50.46 Annual Report Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors.2018-05-0202 May 2018 Submittal of 10 CFR 50.46 Annual Report Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors. SVP-17-046, Regulatory Commitment Change Summary Report2017-07-0606 July 2017 Regulatory Commitment Change Summary Report RS-16-044, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima..2016-02-19019 February 2016 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.. ML15309A4932016-02-10010 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force SVP-15-052, Submittal of Regulatory Commitment Change Summary Report2015-07-0808 July 2015 Submittal of Regulatory Commitment Change Summary Report RS-15-085, Provides Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentaiton (Order Number EA-12-051)2015-05-0707 May 2015 Provides Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentaiton (Order Number EA-12-051) SVP-14-057, Owner'S Activity Report Submittal Fifth 10 Year Interval 2014 Refueling Outage Activities2014-08-0101 August 2014 Owner'S Activity Report Submittal Fifth 10 Year Interval 2014 Refueling Outage Activities RS-14-072, Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights..2014-03-31031 March 2014 Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights.. IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee SVP-13-001, Summary Report of Completed Changes, Tests and Experiments for January 2011 - December 20122013-01-0404 January 2013 Summary Report of Completed Changes, Tests and Experiments for January 2011 - December 2012 ML12178A2152012-08-0202 August 2012 Closeout of Bulletin 2011-01 Migrating Strategies. SVP-12-062, Post Outage Inservice Inspection (ISI) Summary Report2012-07-13013 July 2012 Post Outage Inservice Inspection (ISI) Summary Report ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants SVP-11-050, Regulatory Commitment Change Summary Report2011-06-11011 June 2011 Regulatory Commitment Change Summary Report ML1108712502011-03-24024 March 2011 BWR Vessel and Internals Inspection Summaries for Spring 2010 Outages ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML0802800922008-01-15015 January 2008 U.S. Dept of Homeland Security/Quad Cities Nuclear Power Station Medical Services (MS-1) Drill Report/Report ML0731000992007-11-0606 November 2007 Federal Emergency Management Agency, Final Report for September 28, 2007 Medical Service Drill of the Offsite Radiological Emergency Response Plans Site-Specific to the Quad Cities Nuclear Power Station ML0711004532007-04-0404 April 2007 Westinghouse Application for Withholding, Affidavit, and Non-Proprietary Version of Attachment 2 (Attachment 3) SVP-06-081, Extension of the Provisional Variance of National Pollutant Discharge Elimination System Permit No. IL00050372006-08-10010 August 2006 Extension of the Provisional Variance of National Pollutant Discharge Elimination System Permit No. IL0005037 RS-06-113, Startup and Power Ascension Testing Following Installation of Acoustic Side Branch Modifications2006-08-0202 August 2006 Startup and Power Ascension Testing Following Installation of Acoustic Side Branch Modifications ML0600301402005-11-30030 November 2005 Enclosure 6 - Non-Proprietary GE Report GE-NE-0000-0048-1485-01-NP, Damping Value for Steam Dryer Hood Focused on a Single Frequency Regime. SVP-05-058, Regulatory Commitment Change Summary Report2005-07-28028 July 2005 Regulatory Commitment Change Summary Report SVP-05-043, Core Operating Limits Report for Plant Cycle 19, Rev 12005-05-31031 May 2005 Core Operating Limits Report for Plant Cycle 19, Rev 1 ML0611504632005-04-30030 April 2005 C.D.I. Technical Note No. 05-04, Quad Cities 2 New Dryer Smt Loads, Revision 5, Dated April 2005, Non-Proprietary SVP-05-031, Occupational Radiation Exposure Report for January Through December 20042005-04-22022 April 2005 Occupational Radiation Exposure Report for January Through December 2004 RS-05-040, Technical Documentation Related to Analysis and Design of New Quad Cities Steam Dryers, and Responses to Requests for Additional Information Related to EPU Operation at Dresden and Quad Cities Nuclear Power Stations2005-04-0101 April 2005 Technical Documentation Related to Analysis and Design of New Quad Cities Steam Dryers, and Responses to Requests for Additional Information Related to EPU Operation at Dresden and Quad Cities Nuclear Power Stations ML0611504572005-01-31031 January 2005 C.D.I. Report No. 04-09P, Methodology to Determine Unsteady Pressure Loading on Components in Reactor Steam Domes, Revision 5, Dated January 2005, Non-Proprietary ML0727008492005-01-31031 January 2005 Caldon Experience in Nuclear Feedwater Flow Measurement SVP-05-001, Summary Report of Changes, Tests, and Experiments Completed2005-01-0303 January 2005 Summary Report of Changes, Tests, and Experiments Completed SVP-04-067, Regulatory Commitment Change Summary Report2004-08-13013 August 2004 Regulatory Commitment Change Summary Report ML0309006662003-03-19019 March 2003 Additional Information Regarding Notice of Proposed Amendments to Trust Agreement to Implement Assignment of Decommissioning Trust Funds for Exelon Generation Company, LLC SVP-03-034, Day Post Outage ISI Letter2003-02-24024 February 2003 Day Post Outage ISI Letter SVP-03-002, 10 CFR 50.59 Summary Report2003-01-0303 January 2003 10 CFR 50.59 Summary Report ML0326713602002-08-22022 August 2002 Calculation QDC-0000-N-1117, Site Boundary and Control Doses Following a Loss of Coolant Accident Using Alternative Source Terms, Revision 0 2021-07-15 |
Text
Exelon Generation Company, LLC www.exeloncorp.com Exelekn NucleaT Quad Cities Nuclear Power Station 22710 206th Avenue North Cordova, IL61242-9740 July 28, 2005 SVP-05-058 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265
Subject:
Regulatory Commitment Change Summary Report Please find enclosed the "Regulatory Commitment Change Summary Report" for Quad Cities Nuclear Power Station. This report contains summary information from June 1, 2004, through May 31, 2005. Revisions to docketed correspondence were processed using NEI (Nuclear Energy Institute) 99-04, Revision 0, "Guidelines for Managing NRC Commitment Changes," dated July 1999, and applicable station procedures.
Should you have any questions concerning this letter, please contact Mr. W. J. Beck at (309) 227-2800.
Respectfully, Timothy J. Tulon Site Vice President Quad Cities Nuclear Power Station Attachment cc: Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - Quad Cities Nuclear Power Station p001
Quad Cities Nuclear Power Station, Units 1 and 2 Regulatory Commitment Change Summary Report for June 1, 2004, through May 31, 2005 Page 1 of 1 I' Tracking Date of Original Original Commitment Revised Commitment Basis For Revision No. Commitment Document Revision 05-001 2/14/05 Quad Cities/ The Quad Cities/ Dresden License Renewal A procedure revision The original commitment stated Dresden License Application, Appendix A and B includes a changed the goal value. that the EPRI document that is Renewal commitment to have a water chemistry program that The revised range is the basis for this procedure is Application, meets EPRI TR-103515 R2. Procedure CY-AB-1 20- >/=0.2 to </=1.5 ppb periodically updated, and that the Appendix A and B 110, "Condensate and Feedwater Chemistry," total Iron. This change changes should be evaluated describes the frequency of analysis, chemical control is based on EPRI using the commitment change specifications, and corrective actions for condensate document #1008192 process. This change is to the and reactor feedwater chemistry control. It defines issued in 2004 that goal values, and is in accordance the requirements for monitoring and control of updated the EPRI with the EPRI document. The condensate and feedwater chemistry based on EPRI document #TR-1 03515 action levels are not changed.
TR-1 03515 R2. The goal value for feedwater iron in R2 issued in 2000.
the procedure was >/=0.5 to </=2.0 ppb total Iron.