SVP-24-023, Ile Outline Submittal Letter

From kanterella
Jump to navigation Jump to search
Ile Outline Submittal Letter
ML24173A128
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 03/29/2024
From: Hild D
Constellation Energy Generation
To:
NRC/RGN-III
Bryan Bergeon
Shared Package
ML22251A229 List:
References
SVP-24-023
Download: ML24173A128 (1)


Text

Constellation~

SVP-24-023

March 29, 2024

Regional Administrator, Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352

Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265

Subject:

Submittal of Initial Operator Licensing Examination Outlines

Enclosed are the examination outlines that Quad Cities Nuclear Power Station (QCNPS) is submitting in support of the Initial License Examination scheduled for the week of May 27, 2024, at QCNPS.

This submittal includes all appropriate examination standard forms and outlines in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 12.

In accordance with NUREG-1021, Revision 12, Section ES-1.3, "Examination Security,"

please ensure that these materials are withheld from public disclosure until after the examinations are complete.

Should you have any questions concerning this letter, please contact Rachel Luebbe, Acting Regulatory Assurance Manager, at (309) 227-2813. For questions concerning examination outlines, please contact Joshua Roos (309) 227-2300.

ReJully, ~

Doug !::f Site Vice President Quad Cities Nuclear Power Station

Enclosures:

(electronically delivered to Bryan Bergeon, Chief Examiner, NRC Region Ill)

Form 1.3-1 Examination Security agreement Form 2.3-1 Examination Outline Quality Checklist Form 3.2-1 Administrative Topics Outline Form 3.2-2 Control Room/In-Plant Systems Outline Form 3.3-1 Scenario Outline SVP-24-023 U.S. Nuclear Regulatory Commission

Form 3.4-1 Events and Evolutions Checklist Form 4.1 BWR Boiling Water Reactor Examination Outline Form 4. 1-1 Record of Rejected Knowledge and Abilities Draft Operating test administration schedule (B.18)

cc: Chief, NRC Operator Licensing Branch - NRC Region Ill (w/o enclosures)

NRC Senior Resident Inspector-Quad Cities Nuclear Power Station (w/o enclosures)

SVP-24-023 U. S. Nuclear Regulatory Commission

bee: Robert Kuntz, NRC Project Manager-NRR Robert.Kuntz@NRC.gov (ECopy w/o enclosures)

Kevin Lueshen, Director, Licensing and Regulatory Affairs - Cantera (ECopy w/o enclosures)

Mark Humphrey, Manager, Licensing, Dresden and Quad Cities Stations (ECopy w/o enclosures)

Dave Gullett, Vice President - Licensing and Regulated (ECopy w/o enclosures)

Sean Sullivan, Training - Quad Cities Nuclear Power Station (ECopy w/o enclosures)

Constellation Document Control Desk - Licensing (ECopy w/o enclosures)

Rachel Luebbe, Acting Regulatory Assurance Manager - Quad Cities Nuclear Power Station (ECopy w/o enclosures)

Kelly Muehler, Human Resources - Quad Cities Nuclear Power Station (ECopy w/o enclosures)

Ryan Merema, Training Director - Quad Cities Nuclear Power Station (ECopy w/o enclosures)

Rick Swart, NRC Coordinator - Quad Cities Nuclear Power Station (Electronic Copy w/o enclosures)

Doug Hild, Site Vice President - QCNPS (ecopy w/o enclosures)

SVP Letter File - Q:/SVP Reg Assurance Clerk (copy for records turnover w/o enclosures)