SVP-24-018, Ile Proposed Exam Submittal Letter

From kanterella
Jump to navigation Jump to search
Ile Proposed Exam Submittal Letter
ML24173A157
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 03/13/2024
From:
Exelon Generation Co
To:
Exelon Generation Co, NRC/RGN-III
Bryan Bergeon
Shared Package
ML22251A228 List:
References
SVP-24-018
Download: ML24173A157 (1)


Text

Constellation SVP-24-018 March 13, 2024 Regional Administrator, Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352

Subject:

Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Submittal of Initial Operator Licensing Examination Materials Enclosed are the examination materials that Quad Cities Nuclear Power Station (QCNPS) is submitting in support of the Initial License Examination scheduled for the week of May 27, 2024, at QCNPS.

This submittal includes the Senior Reactor Operator (SRO) and Reactor Operator (RO) written examinations, job performance measures, and Integrated Plant Operation Scenario Guides.

These examination materials have been developed in accordance with NUREG-1021,

"Operator Licensing Examination Standard for Power Reactors," Revision 12. Please note that reference materials are attached to each individual examination question or item.

There have been no modifications to the Integrated Examination Outline with regards to the operating examinations.

Some modifications or adjustments to the examination material may be required due to procedural changes.

In accordance with NUREG-1021, Revision 12, Section ES-1.3, Examination Security, please ensure that these materials are withheld from public disclosure until after the examinations are complete.

Should you have any questions concerning this letter, please contact Rachel Luebbe, Acting Regulatory Assurance Manager, at (309) 227-2813. For questions concerning examination outlines, please contact Joshua Roos (309) 227-2300.

Respectfully, Doug Hild Site Vice President Quad Cities Nuclear Power Station

SVP-24-018 U.S. Nuclear Regulatory Commission

Enclosures:

(electronically delivered to Bryan Bergeon, Chief Examiner, NRC Reg ion Ill)

RO/SRO Composite Examination with references attached Control Room Systems and Facility Walk-Through Job Performance Measures with references attached Administrative Topic Job Performance Measures with references attached Integrated Plant Operation Scenario Guides Completed Checklists:

Examination Security Agreements (Form 1.3-1)

Operating Test Quality Checklist (Form 2.3-2)

Written Exam Quality Checklist (Form 2.3-4)

Events and Evolutions Checklist (Form 3.4-1)

Record of Rejected K/As (Form 4.1-1) cc:

Chief, NRC Operator Licensing Branch - NRC Region Ill (w/o enclosures)

NRC Senior Resident Inspector - Quad Cities Nuclear Power Station (w/o enclosures)

SVP-24-018 U. S. Nuclear Regulatory Commission bee:

Robert Kuntz, NRC Project Manager-NRR Robert.Kuntz@NRC.gov (ECopy w/o enclosures)

Kevin Lueshen, Director, Licensing and Regulatory Affairs - Cantera (ECopy w/o enclosures)

Mark Humphrey, Manager, Licensing, Dresden and Quad Cities Stations (ECopy w/o enclosures)

Dave Gullett, Vice President - Licensing and Regulated (ECopy w/o enclosures)

Sean Sullivan, Training - Quad Cities Nuclear Power Station (ECopy w/o enclosures)

Constellation Document Control Desk-Licensing (Hard Copy w/o enclosures)

Constellation Document Control Desk - Licensing (ECopy w/o enclosures)

Rachel Luebbe, Acting Regulatory Assurance Manager - Quad Cities Nuclear Power Station (ECopy w/o enclosures)

Kelly Muehler, Human Resources - Quad Cities Nuclear Power Station (ECopy w/o enclosures)

Ryan Merema, Training Director - Quad Cities Nuclear Power Station (ECopy w/o enclosures)

Rick Swart, NRC Coordinator - Quad Cities Nuclear Power Station (Electronic Copy w/o enclosures)

Doug Hild, Site Vice President - QCNPS (ecopy w/o enclosures)

SVP Letter File - Q:/SVP Reg Assurance Clerk (copy for records turnover w/o enclosures)