Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F8911999-10-13013 October 1999 Forwards Copy of FEMA Region IV Final Rept for 990623-24, Grand Gulf Nuclear Station Exercise.Rept Indicates No Deficiencies or Areas Requiring Corrective Action Identified During Exercise ML20216J8891999-10-0404 October 1999 Forwards Details of Existing Procedural Guidance & Planned Administrative Controls.Util Respectfully Requests NRC Review & Approval of Changes by 991020.Date Will Permit to Implement Changes & Realize Full Benefit During Refueling ML20217B0361999-10-0404 October 1999 Refers to Investigation Conducted by NRC OI Re Activities at Grand Gulf Nuclear Station.Investigation Conducted to deter- Mine Whether Security Supervisor Deliberately Falsified Unescorted Access Authorizations.Allegation Unsubstantiated ML20212J8151999-09-29029 September 1999 Forwards Insp Rept 50-416/99-12 on 990725-0904.One Violation Noted & Being Treated as Noncited Violation.Licensee Conduct of Activities at Grand Gulf Facility Characterized by Safety Conscious Operations,Sound Engineering & Maint Practices ML20216J6811999-09-28028 September 1999 Ack Receipt of ,Transmitting Rev 31 to Physical Security Plan for GGNS Under Provisions of 10CFR50.54(p). NRC Approval Not Required,Based on Determination That Changes Do Not Decrease Effectiveness & Limited Review ML20212J7361999-09-28028 September 1999 Forwards Insp Rept 50-416/99-11 on 990830-0903.No Violations Noted.Purpose of Insp to Review Solid Radioactive Waste Management & Radioactive Matl Transportation Programs ML20212J5321999-09-27027 September 1999 Forwards Insp Rept 50-416/99-14 on 990830-0903.No Violations Noted.Inspectors Determined That Radioactive Waste Effluent Releases Properly Controlled,Monitored & Quantified ML20216J7101999-09-26026 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator License Examinations ML20216J8141999-09-26026 September 1999 Forwards Proprietary Renewal Applications for Licensed Operators for Wk Gordon & SA Elliott at Grand Gulf Nuclear Station.Proprietary Info Withheld ML20212F5521999-09-23023 September 1999 Forwards SER Accepting Util Analytical Approach for Ampacity Derating Determinations at Grand Gulf Nuclear Station,Unit 1 & That No Outstanding Ampacity Derating Issues as Identified in GL 92-08 Noted ML20212D9211999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of GGNS on 990818 & Identified No Areas in Which Licensee Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through March 2000 Encl ML20212A9331999-09-13013 September 1999 Forwards Partially Withheld Insp Rept 50-416/99-15 on 990816-20 (Ref 10CFR73.21).One Violation of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20211P7631999-09-10010 September 1999 Discusses Staff Issuance of SECY-99-204, Kaowool & FP-60 Fire Barriers at Plant.Proposed Meeting to Discuss Subj Issues Will Take Place in Oct or Nov 1999 ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211Q3471999-09-0909 September 1999 Forwards Federal Emergency Mgt Agency Final Rept for 990623 Plant Emergency Preparedness Exercise.No Deficiencies Noted & One Area Requiring Corrective Action Identified ML20211Q3091999-09-0909 September 1999 Forwards Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 ML20211Q4861999-09-0808 September 1999 Informs That Util Has Discovered Dose Calculation Utilized non-conservative Geometry Factor for Parameter.Calculation Error Being Evaluated in Accordance with Corrective Action Program ML20211Q0091999-09-0808 September 1999 Forwards Request for Addl Info Re Individual Plant Exam of External Events for Grand Gulf Nuclear Station,Unit 1. Response Requested by 000615 ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20211P4171999-09-0707 September 1999 Ack Receipt of ,Which Transmitted Addendum to Rev 30 to Physical Security Plan for Ggns,Per 10CFR50.54(p).NRC Approval Is Not Required,Since Util Determined That Changes Do Not Decrease Effectiveness of Plan ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) ML20211K6061999-08-31031 August 1999 Informs That Plant Has No Candidates to Take 991006 Generic Fundamentals Exam ML20211K5641999-08-31031 August 1999 Forwards Rev 39 to Grand Gulf Nuclear Station Emergency Plan Non-Safety Related, IAW 10CFR50,App E,Section V. Changes Do Not Decrease Effectiveness of Plan & Continues to Meets Stds of 10CFR50.47(b) & Requirements of App E ML20211J2321999-08-26026 August 1999 Advises That Info Contained in to Support NRC Review of GE Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Will Be Withheld from Public Disclosure ML20211J3761999-08-25025 August 1999 Corrected Ltr Informing That Info Provided (on Computer Disk & in Ltr to Ineel ) Marked as Proprietary Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended.Corrected 990827 ML20211F4881999-08-25025 August 1999 Advises That Info Submitted by 990716 Application & Affidavit Containing Diskette & to Ineel Mareked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20211F7751999-08-24024 August 1999 Forwards Insp Rept 50-416/99-10 on 990809-13.No Violations Noted.Insp Covered Licensed Operator Requalification Program & Observations of Requalification Activities ML20211C4381999-08-20020 August 1999 Forwards Rev 31 to Physical Security Plan for Protection of Grand Gulf Nuclear Station,Iaw 10CFR50.54(p).Util Has Determined That Rev Does Not Decrease Effectiveness of Plan. Encl Withheld,Per 10CFR73.21 ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211B3761999-08-16016 August 1999 Submits Voluntary Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001, ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211A9481999-08-12012 August 1999 Informs of Completion of Analysis of Heat Transfer in Cooler During Fan Coast Down & Concludes That Potential Exists for Steam Foundation,Under Conditions Where Dcw Sys Flow Is Lost Prior to Full Isolation Valve Closure ML20210P8411999-08-0909 August 1999 Forwards Insp Rept 50-416/99-09 on 990613-0724.No Violations Noted.Activities at Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20210N6401999-08-0303 August 1999 Informs That Eighteeen Identified Penetrations Will Be Restored to Conformance with Licensing Requirements Prior to Restart from RFO10,scheduled for Fall 1999,per GL 96-06. Example of Piping Analysis Being Performed,Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1951999-07-30030 July 1999 Forwards Insp Rept 50-416/99-03 on 990405-08 & 0510-11.No Violations Identified ML20211K7491999-07-30030 July 1999 Forwards Ltr Rept Documenting Work Completed Under JCN-W6095,analyses Performed at Ineel to Calculate Minimum Time to Fuel Pin Failure in Boiling Water Reactors (BWR) ML20210K6661999-07-29029 July 1999 Forwards Fitness for Duty Program Performance six-month Rept for Period Covering Jan-June 1999,per 10CFR26.71 ML20210F3591999-07-26026 July 1999 Forwards Proprietary Version & Redacted Version of Wyle Test Rept M-J5.08-Q1-45161-0-8.0-1-0,re Pressure Locking & Thermal Binding Test Program.Proprietary Version Withheld ML20210E3251999-07-23023 July 1999 Forwards Insp Rept 50-416/99-07 on 990622-25.No Violations Noted.Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise Was Conducted ML20210D2401999-07-21021 July 1999 Informs of Resignation of Operator WE Griffith,License OP-20806-1,from Entergy Operations,Inc ML20209J0311999-07-16016 July 1999 Forwards Proprietary Info Supporting Review of Generic Alternate Source Term Request.Proprietary Info Withheld Per 10CFR2.790 ML20209G4791999-07-15015 July 1999 Forwards Proposed Emergency Plan Change as Addendum to Changes Previously Submitted Via GNRO-98/00028 & GNRO-99/00007,for NRC Review & Approval ML20210B1031999-07-15015 July 1999 Forwards Insp Rept 50-416/99-08 on 990502-0612.Determined That Three Severity Level IV Violations Occurred & Being Treated as Noncited Violations ML20210H3211999-07-14014 July 1999 Forwards Proprietary Info Supporting Review of 970506 Submittal of BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic Bwr. Proprietary Info Withheld Per 10CFR2.790 ML20209D7511999-07-0909 July 1999 Responds to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. as Result of NRC Review of Util Responses,Info Revised in Rvid & Rvid Version 2 Will Be Released ML20209D7671999-07-0101 July 1999 Submits Response to Violations Noted in Insp Rept 50-416/99-02 on 990222-26 & 0308-12.Corrective Actions: Contractor Performance Has Been re-evaluated in Regards to UFSAR Reviews ML20196K4901999-07-0101 July 1999 Discusses Relief Requests PRR-E12-01,PRR-E21-01,PRR-E22-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01 Submitted by EOI on 971126 & 990218.SE Accepting Alternatives Proposed by Util Encl ML20196J5711999-06-30030 June 1999 Advises That Versions of Submitted Info in 990506 Application & Affidavit, Re Proposed Amend to Revise Ts,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20216J8891999-10-0404 October 1999 Forwards Details of Existing Procedural Guidance & Planned Administrative Controls.Util Respectfully Requests NRC Review & Approval of Changes by 991020.Date Will Permit to Implement Changes & Realize Full Benefit During Refueling ML20216J7101999-09-26026 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator License Examinations ML20216J8141999-09-26026 September 1999 Forwards Proprietary Renewal Applications for Licensed Operators for Wk Gordon & SA Elliott at Grand Gulf Nuclear Station.Proprietary Info Withheld ML20211Q4861999-09-0808 September 1999 Informs That Util Has Discovered Dose Calculation Utilized non-conservative Geometry Factor for Parameter.Calculation Error Being Evaluated in Accordance with Corrective Action Program ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) ML20211K6061999-08-31031 August 1999 Informs That Plant Has No Candidates to Take 991006 Generic Fundamentals Exam ML20211K5641999-08-31031 August 1999 Forwards Rev 39 to Grand Gulf Nuclear Station Emergency Plan Non-Safety Related, IAW 10CFR50,App E,Section V. Changes Do Not Decrease Effectiveness of Plan & Continues to Meets Stds of 10CFR50.47(b) & Requirements of App E ML20211C4381999-08-20020 August 1999 Forwards Rev 31 to Physical Security Plan for Protection of Grand Gulf Nuclear Station,Iaw 10CFR50.54(p).Util Has Determined That Rev Does Not Decrease Effectiveness of Plan. Encl Withheld,Per 10CFR73.21 ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211B3761999-08-16016 August 1999 Submits Voluntary Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001, ML20211A9481999-08-12012 August 1999 Informs of Completion of Analysis of Heat Transfer in Cooler During Fan Coast Down & Concludes That Potential Exists for Steam Foundation,Under Conditions Where Dcw Sys Flow Is Lost Prior to Full Isolation Valve Closure ML20210N6401999-08-0303 August 1999 Informs That Eighteeen Identified Penetrations Will Be Restored to Conformance with Licensing Requirements Prior to Restart from RFO10,scheduled for Fall 1999,per GL 96-06. Example of Piping Analysis Being Performed,Encl ML20211K7491999-07-30030 July 1999 Forwards Ltr Rept Documenting Work Completed Under JCN-W6095,analyses Performed at Ineel to Calculate Minimum Time to Fuel Pin Failure in Boiling Water Reactors (BWR) ML20210K6661999-07-29029 July 1999 Forwards Fitness for Duty Program Performance six-month Rept for Period Covering Jan-June 1999,per 10CFR26.71 ML20210F3591999-07-26026 July 1999 Forwards Proprietary Version & Redacted Version of Wyle Test Rept M-J5.08-Q1-45161-0-8.0-1-0,re Pressure Locking & Thermal Binding Test Program.Proprietary Version Withheld ML20210D2401999-07-21021 July 1999 Informs of Resignation of Operator WE Griffith,License OP-20806-1,from Entergy Operations,Inc ML20209J0311999-07-16016 July 1999 Forwards Proprietary Info Supporting Review of Generic Alternate Source Term Request.Proprietary Info Withheld Per 10CFR2.790 ML20209G4791999-07-15015 July 1999 Forwards Proposed Emergency Plan Change as Addendum to Changes Previously Submitted Via GNRO-98/00028 & GNRO-99/00007,for NRC Review & Approval ML20210H3211999-07-14014 July 1999 Forwards Proprietary Info Supporting Review of 970506 Submittal of BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic Bwr. Proprietary Info Withheld Per 10CFR2.790 ML20209D7671999-07-0101 July 1999 Submits Response to Violations Noted in Insp Rept 50-416/99-02 on 990222-26 & 0308-12.Corrective Actions: Contractor Performance Has Been re-evaluated in Regards to UFSAR Reviews ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20195J6351999-06-16016 June 1999 Forwards Addendum to Rev 30 of GGNS Physical Security Plan IAW 10CFR50.54(p).Addendum Is Submitted to Announce Relocation/Reconfiguration of Plant Central & Secondary Alarm Station Facilities.Rev Withheld,Per 10CFR73.21 ML20195G0281999-06-0909 June 1999 Submits Summary on Resolution of GL 96-06 Re Eighteen Penetrations Previously Identified as Being Potentially Susceptible to Overpressurization ML20207F5041999-06-0202 June 1999 Forwards Updated Medical Rept IAW License Condition 3 for DA Killingsworth License OP-20942-1.Without Encls ML20206P2981999-05-13013 May 1999 Forwards Responses to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, Cancelling 990402 Submittal ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 ML20206J0941999-05-0404 May 1999 Forwards Proprietary & Redacted ME-98-001-00,both Entitled, Pressure Locking & Thermal Binding Test Program on Two Gate Valves with Limitorque Actuators. Rept ME-98-002-00 Re Flexible Wedge Gate Valves,Encl.Proprietary Rept Withheld ML20206E7811999-04-29029 April 1999 Proposes Alternatives to Requirements of ASME B&PV Code Section XI,1992 Edition,1992 Addenda,As Listed.Approval of Alternative Request on or Before 990915,requested ML20206D8171999-04-29029 April 1999 Informs NRC of Results of Plant Improvement Considerations Identified in GGNS Ipe,As Requested in NRC . Licensee Found Efforts Have Minimized Extent of Radiological Release in Unlikely Event That Severe Accident Occurred ML20206D7281999-04-28028 April 1999 Forwards South Mississippi Electric Power Association 1998 Annual Rept, Per 10CFR50.71(b).Licensee Will Submit 1998 Annual Repts for System Energy Resources,Inc,Entergy Mississippi,Inc & EOI as Part of Entergy Corp Annual Rept ML20206C9551999-04-22022 April 1999 Forwards 1999 Biennial Emergency Preparedness Exercise Scenario. Without Encl ML20205M1311999-04-0202 April 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. Info Was Discussed During Conference Call with NRC on 990126.Wyle Position Paper Encl.Subj Paper Withheld ML20205H5861999-04-0101 April 1999 Requests Relief from ASME B&PV Code,Section XI for Period of Time That Temporary non-code Repair Was in Effect,Per 10CFR50.55a(g)(5)(iii) ML20205F1781999-03-31031 March 1999 Forwards Consolidated Entergy Submittal to Document Primary & Excess Property Damage Insurance Coverage for Nuclear Sites of Entergy Operations,Inc,Per 10CFR50.54(w)(3) ML20196K7101999-03-26026 March 1999 Submits Reporting & Recordkeeping for Decommissioning Planning,Per 10CFR50.75(f)(1) ML20205A6511999-03-25025 March 1999 Responds to NRC Re Violations Noted in Insp Rept 50-416/99-01 on 990201-05.Corrective Actions:Program Will Be Implemented to Ensure Accessible Areas with Radiation Levels Greater than 1000 Mrem/H ML20204E7391999-03-15015 March 1999 Forwards Objectives for June 1999 Emergency Preparedness Exercise for Plant.Without Encl ML20207H9291999-03-0404 March 1999 Submits Update to Original Certification of Grand Gulf Nuclear Station Simulation Facility IAW Requirements of 10CFR55.45(b)(5) ML20207E3081999-03-0303 March 1999 Informs That GGNS Severe Accident Mgt Implementation Was Completed on 981223.Effort Was Worthwhile & Station Ability to Respond & Mitigate Events That May Lead to Core Melt Has Been Enhanced ML20207E3221999-03-0303 March 1999 Notifies of Change in Status of Mj Ellis,License SOP-43846. Conditional License Requested to Accommodate Medical Condition.Revised NRC Form 396 with Supporting Medical Evidence Attached.Without Encls ML20207A8161999-02-24024 February 1999 Forwards 1998 Annual Operating Rept for Ggns,Unit 1. Listed Attachments Are Encl ML20207A9901999-02-24024 February 1999 Informs That Util Has No Candidates from GGNS to Nominate for Participation in Planned Gfes,Scheduled for 990407 ML20203A1551999-02-0101 February 1999 Forwards Grand Gulf Nuclear Station Fitness for Duty Program Performance six-month Rept for Reporting Period 980701-981231 ML20202G0791999-01-26026 January 1999 Informs That He Mcknight Has Been Permanently Reassigned from Position Requiring License to Perform Assigned Duties. License Is No Longer Needed,Effective 981231 ML20199K4151999-01-20020 January 1999 Forwards Proposed Addendum to Emergency Plan Changes Previously Submitted Via GNRO-98/00028 for NRC Review & Approval as Required by 10CFR50.54(q) & 50.4 ML20199K6771999-01-14014 January 1999 Provides Notification of Planned ERDS Software Change Scheduled to Take Place on 990215 ML20199D8811999-01-11011 January 1999 Submits Response to SE JOG Program on Periodic Verification of motor-operated Valves,In Response to GL 96-05 ML20199D9521999-01-0808 January 1999 Informs That CE Cresap,License SOP-4220-4,has Been Permanently Reassigned from Position Requiring License & No Longer Has Need for License,Per 10CFR50.74 ML20199A6081999-01-0606 January 1999 Submits List of Plant Info Brochures Disseminated Annually to Public & List of Updated State &/Or Local Emergency Plan Info,Per NRC Administrative Ltr 94-07, Distribution of Site-Specific & State Emergency Planning Info ML20202B7531998-12-21021 December 1998 Submits Ltr Confirming Discussion with J Tapia,Documenting Extension for Response to NOV 50-416/98-13.Util Response Will Be Submitted by 990212 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARAECM-90-0169, Forwards Operator Licensing Natl Exam Schedule for FY91 Through FY94,per Generic Ltr 90-071990-09-17017 September 1990 Forwards Operator Licensing Natl Exam Schedule for FY91 Through FY94,per Generic Ltr 90-07 AECM-90-0172, Forwards Endorsement 67 to Nelia Policy NF-257 & Endorsement 46 to Maelu Policy MF-1061990-09-17017 September 1990 Forwards Endorsement 67 to Nelia Policy NF-257 & Endorsement 46 to Maelu Policy MF-106 AECM-90-0174, Forwards List of Submittals Pending NRR Review Re Grand Gulf Licensing Activities1990-09-14014 September 1990 Forwards List of Submittals Pending NRR Review Re Grand Gulf Licensing Activities AECM-90-0165, Forwards Addl Info on NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount1990-09-12012 September 1990 Forwards Addl Info on NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount AECM-90-0158, Forwards Quarterly Status Rept for Reg Guide 1.97 Re Neutron Monitoring Sys for Period Ending 900630.Rept Includes Major Actions Completed to Date for Unit ex-core Sys.Estimated Milestone Schedule for Activities Also Encl1990-09-0808 September 1990 Forwards Quarterly Status Rept for Reg Guide 1.97 Re Neutron Monitoring Sys for Period Ending 900630.Rept Includes Major Actions Completed to Date for Unit ex-core Sys.Estimated Milestone Schedule for Activities Also Encl AECM-90-0163, Forwards Endorsement 61 to Nelia Policy NF-257,Endorsement 40 to Maelu Policy MF-106,Endorsement 62 to Nelia Policy NF-257,Endorsement 41 to Maelu Policy MF-106 & Endorsement 63 to Nelia Policy NF-2571990-09-0606 September 1990 Forwards Endorsement 61 to Nelia Policy NF-257,Endorsement 40 to Maelu Policy MF-106,Endorsement 62 to Nelia Policy NF-257,Endorsement 41 to Maelu Policy MF-106 & Endorsement 63 to Nelia Policy NF-257 AECM-90-0161, Forwards Quarterly Status Rept Re Degraded Core Accident Hydrogen Control Program, for Apr-June 19901990-08-30030 August 1990 Forwards Quarterly Status Rept Re Degraded Core Accident Hydrogen Control Program, for Apr-June 1990 AECM-90-0149, Forwards Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Rev 3 to Process Control Program1990-08-30030 August 1990 Forwards Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Rev 3 to Process Control Program AECM-90-0162, Forwards fitness-for-duty 6-month Rept for Period Ending June 1990,per 10CFR26.Success of Program Evident in Statistical Data Indicating Extremely Low Incident Rate1990-08-29029 August 1990 Forwards fitness-for-duty 6-month Rept for Period Ending June 1990,per 10CFR26.Success of Program Evident in Statistical Data Indicating Extremely Low Incident Rate ML20028G8591990-08-27027 August 1990 Forwards Updated Svc List to Be Used for Licensee Correspondence.Requests That Author Be Primary Addressee for All Correspondence Re Plant AECM-90-0144, Forwards Security Boundary Upgrade Bimonthly Status Rept for Period Ending 900731,per 900330 Commitment.Rept Covering Period 900801-0930 Will Be Submitted in Oct 19901990-08-22022 August 1990 Forwards Security Boundary Upgrade Bimonthly Status Rept for Period Ending 900731,per 900330 Commitment.Rept Covering Period 900801-0930 Will Be Submitted in Oct 1990 ML20056B3511990-08-20020 August 1990 Suppls Info Re 900806 Application for Amend to License NPF-29,changing Tech Specs on Alternate DHR Sys,Per NRC Comments.Proposed Tech Spec 3/4.5.2 Encl AECM-90-0147, Informs That Annual Emergency Preparedness Exercise for Facility Scheduled for Wk of 9108261990-08-14014 August 1990 Informs That Annual Emergency Preparedness Exercise for Facility Scheduled for Wk of 910826 AECM-90-0142, Forwards Supplemental Info Re 900705 Application for Amend to License NPF-29,revising Tech Specs Due to Addition of Alternate DHR Sys1990-08-0909 August 1990 Forwards Supplemental Info Re 900705 Application for Amend to License NPF-29,revising Tech Specs Due to Addition of Alternate DHR Sys AECM-90-0143, Notifies That Cd Bland No Longer Employed by Util,Effective 9007191990-08-0202 August 1990 Notifies That Cd Bland No Longer Employed by Util,Effective 900719 AECM-90-0139, Forwards Endorsement 68 to Nelia Policy NF-257,Endorsement 47 to Maelu Policy MF-106 & Revised Endorsement 35 to Maelu Policy MF-1061990-08-0202 August 1990 Forwards Endorsement 68 to Nelia Policy NF-257,Endorsement 47 to Maelu Policy MF-106 & Revised Endorsement 35 to Maelu Policy MF-106 ML20055J0551990-07-27027 July 1990 Forwards Summary of Environ Protection Program Re Const of Unit for 6-months Ending 900630,per Exhibit 2-A in Subsection 3.E.1 of CPPR-119 AECM-90-0136, Forwards Executed Amend 4 to Indemnity Agreement B-72,per NRC 891214 Request1990-07-27027 July 1990 Forwards Executed Amend 4 to Indemnity Agreement B-72,per NRC 891214 Request AECM-90-0130, Forwards Corrected Pages to Rev 17 to Physical Security Plan.Pages Withheld (Ref 10CFR73.21)1990-07-17017 July 1990 Forwards Corrected Pages to Rev 17 to Physical Security Plan.Pages Withheld (Ref 10CFR73.21) ML20044A9251990-07-0909 July 1990 Forwards Rev 1 to Relief Request I-00018 Correcting Valve Number & Description of One Component.Review & Approval Requested Prior to 901001 ML20044A7861990-06-29029 June 1990 Responds to NRC 900601 Ltr Re Violations Noted in Insp Rept 50-416/90-08.Corrective Actions:Operations Superintendent Counseled Individuals Re Inoperable Reactor Water Level Transmitter & Met W/All Shift Senior Reactor Operators AECM-90-0121, Withdraws 880831 & 890324 Proposed Amends,Deleting Certain Test,Vent & Drain Valves from Tech Spec Table 3.6.4-11990-06-27027 June 1990 Withdraws 880831 & 890324 Proposed Amends,Deleting Certain Test,Vent & Drain Valves from Tech Spec Table 3.6.4-1 AECM-90-0115, Forwards List of Followup Actions as Result of NRC Requalification Reexam of Three Licensed Operators on 900531.Lessons Learned Guideline Will Be Prepared Re Ability of Training Personnel to Evaluate Simulator Crew1990-06-26026 June 1990 Forwards List of Followup Actions as Result of NRC Requalification Reexam of Three Licensed Operators on 900531.Lessons Learned Guideline Will Be Prepared Re Ability of Training Personnel to Evaluate Simulator Crew ML20044A2931990-06-22022 June 1990 Responds to NRC Request for Addl Info Re Boraflex Gap Analysis.If Vibratory Ground Motion Exceeding OBE Occurs,Per 10CFR100,App a & as Previously Committed,Plant Will Be Shut Down.Listed Addl Surveillance Will Be Performed ML20043G6231990-06-14014 June 1990 Forwards Evidence That Cash Flow Would Be Available for Payment of Deferred Premium Obligation for Facility.Sys Energy Resources,Inc Responsible for Generating 90% of Required Cash Flow ML20043G3341990-06-11011 June 1990 Forwards Rev 9 to GGNS-TOP-1A, Operational QA Manual, for Evaluation ML20043G5861990-06-0808 June 1990 Forwards Bimonthly Status Repts Re Security Boundary Upgrade Project for Period Ending 900531 ML20043F5121990-06-0808 June 1990 Forwards List of Directors & Officers of Entergy Operations, Inc.Operation of All Plants Transferred to Entergy on 900606 ML20043E8011990-06-0707 June 1990 Forwards Nonproprietary ANF-90-060(NP), Criticality Safety Analysis for Grand Gulf Fuel Storage Racks W/ANF-1.4 Fuel Assemblies. ML20043E7831990-06-0707 June 1990 Forwards Updated Svc List to Be Used Re Plant Correspondence.Requests WT Cottle Be Primary Addressee for All Correspondence Concerning Plant ML20043E8161990-06-0606 June 1990 Informs That Sys Energy Resources,Inc Received Necessary Regulatory Approvals to Transfer Performance Activities for Facility to Entergy Operations & All Conditions in Amend 9 to CP CPPR-119 Implemented,Effective on 900606 ML20043F2061990-06-0606 June 1990 Forwards 1989 Annual Financial Repts for Sys Energy Resources,Inc & South Mississippi Electric Power Assoc ML20043E8111990-06-0606 June 1990 Informs That Sys Energy Resources,Inc Received Necessary Regulatory Approvals to Transfer Operating Responsibility for Facility to Entergy Operations & All Conditions in Amend 65 to License NPF-29 Implemented,Effective on 900606 ML20043C8611990-05-31031 May 1990 Forwards Preliminary Drafts of Plant Specific Tech Specs in Order to Facilitate NRC Validation of BWR Owners Group Improved Tech Specs,Per NRC Request.Understands That Util & NRC Will Meet During Wk of 900716 to Discuss NRC Review ML20043B6811990-05-24024 May 1990 Forwards Degraded Core Accident Hydrogen Control Program, Quarterly Status Rept for Jan-Mar 1990 ML20043B6021990-05-23023 May 1990 Confirms NRC Understanding That Safety Evaluation Will Be Written for Use of New Tech Spec 3.0.4 Flexibility Regardless of Plant Condition at Time Flexibility Required ML20043B2471990-05-18018 May 1990 Forwards Final Response to Generic Ltr 89-04, Guidance on Developing Acceptable Inservice Testing Programs & Rev 4 to Pump & Valve Inservice Testing Program. ML20043A9651990-05-17017 May 1990 Forwards Draft Tech Specs for Power Distribution Limits,Rcs, ECCS & Plant Sys as Part of Util Involvement W/Bwr Owners Group as BWR-6 Lead Plant ML20042G6931990-05-0909 May 1990 Forwards Rev 4 to Fire Hazards Analysis. Design Changes Include Installation of Alternate DHR Sys & Access Hatch in Pipe Chase ML20042G8681990-05-0909 May 1990 Forwards Response to Recommendations Re Areas of Concern Noted in NRC SER Dtd 900316 & 900316 Request for Addl Info Re Design Criteria for Cable Tray Supports in Turbine Bldg ML20042G6731990-05-0909 May 1990 Notifies of Cancellation of Emergency Plan Procedure 10-S-01-13, Onsite Radiological Monitoring. Info Incorporated Into Procedure 10-S-01-14,Rev 13, Radiological Monitoring. ML20042F4891990-05-0404 May 1990 Requests Extension of 90 Days to Provide Addl Time for Securities & Exchange Commission Review Re Implementation of Amend 65 to License NPF-29 ML20042F4441990-05-0404 May 1990 Forwards Response to Generic Ltr 89-19 Re USI A-47, Safety Implications of Control Sys in LWR Nuclear Power Plants. Plant Has Adequate Automatic Reactor Vessel Overfill Protection,Procedures & Tech Specs ML20042F1791990-04-30030 April 1990 Responds to NRC 900402 Ltr Re Violations Noted in Insp Rept 50-416/90-03.Corrective Actions:Valves Closed,Effectively Isolating Flow of Contaminated Water Into Makeup Water Sys & Demineralized Water Sys Flushed & Cleaned of Contamination ML20042F1811990-04-30030 April 1990 Responds to Generic Ltr 89-15, Emergency Response Data Sys. Util Volunteers to Participate in Emergency Response Data Sys ML20042F3711990-04-30030 April 1990 Forwards Certificate of Insurance for Nuclear Property Insurance Submitted by Nuclear Mutual Ltd for Policy Period 900401-910401 & Certificate of Insurance Evidencing Increased Excess Property Insurance,Per 900330 Ltr ML20042F1751990-04-30030 April 1990 Advises That Util Will Not Be Able to Provide Complete Supplemental Summary Rept on Dcrdr by 900430,as Indicated in Util 891221 Ltr.Supplemental Rept Will Be Submitted by 900930 ML20012F3311990-04-0202 April 1990 Forwards GE Affidavit Requesting That All Drawings Presently Denoted as Proprietary in Rev 4 to Updated FSAR Re Offgas Sys Should Remain Proprietary (Ref 10CFR2.790) ML20012E2961990-03-26026 March 1990 Forwards Updated Svc List for NRC Correspondence to Util. Facility Fee Bills Sent to Wrong Primary Addressee ML20011F2171990-02-23023 February 1990 Responds to NRC 900131 Ltr Re Violations Noted in Insp Rept 50-416/89-30.Corrective Actions:Quality Deficiency Rept Initiated to Document & Resolve Incident & Incident Rept & Reportable Events Procedure Enhanced 1990-09-08
[Table view] |
Text
a
%/ .
EVETEM ENERGY RESOtJRCEE, INC.
DfJ G C15/R J?
Qg, December 6, 1988 U. S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D. C. 20555 Attention: Document Control Desk Gentlemen:
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No, i'PF-29 Containment Pt.rge Progrem -
Response to NRC Staff Request AECM-88/0214 System Energy Resources, Inc. (SERI) submitted in letter AECM-87/0250, dated December 31, 1987 the Cycle 2 Containment Purge Monitoring Report for Grand Gulf Nuclear Station (GGNS). By letter dated August 9, 1988 (MAEC-88/0218), the NRC staff requested additional information regarding the GGNS long term containment purge criteria.
The attachments h this letter are SERI's response to the ItRC staff's request. SERI's respuuse incorporates the NRC staff guidance provided in an October 25, 1988 telaphone conference call between SERI and the NRC staff.
Attachment 1 provides a discussion of proposed revisions to the GGNS Unit i long term containment purge criteria and a marked up version of the containment purge system Technical Specification. The marked up pages reflect the incorporation of the GGNS Unit i long term containment purge criteria into the Technical Specifications. The proposed marked up pages are not intended at this time as a formal request to change the GGNS Technical Specifications.
These changes are provided for NRC staff information and to facilitate further discussions. A formal Technical Specification amendment request will be submitted to the NRC within 120 days following completion of the NRC staff review of the G6NS Unit I long term containment purge criteria.
Attachment 2 provides additional information requested by the NRC staff concerning the reasons why the containment purge system was used each time during GGNS Cycle 2.
$$k2]Q{y $h yf P
OY
, e o w l m n. .: wr.:.<.c lw , m a '\ \
J14AECM88110101 - 3
'AECN-86JYO!
Tage ?'
- Please advise if additional information is required.
Yours truly, N, 7 h-f JGC:jjb Attachments cc: .Mr.T.H.Cloninger(w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. H. O. Christensen (w/a)
Mr. Malcolm L. Ernst (w/a)
Acting Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 Mr. L. L. Kintner, Project Manager (w/a)
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 14B20 Washington, D.C. 20555 I
I i
I r
l J14AECM88110101 - 4 l
t Attachment 1 to AECM-88/0214 NRC REQUEST The original objective for the monitoring program was to u=,.'..r a basis for long term purge criteria, and the existing (TS) were intended to be used only until.this program is complete. Because the generated data
+ base shows that only 1% of the TS allowable purge time is required, your
. proposal to maintain the current TS limit is inappropriate. Therefore, yoo are requested to-send a revised purge program with accompanying ,
Technical Specifications that more adequately reflects the findings of
, containment purge data obtained during Cycle 2 operation.
RESPONSE
The Mark III Containment is unique when compared to earlier BWR containment designs in that a large portion of the reactor coolant carrying support systems are located inside the primary containment. Although desirable from an accident release containment view point, this design requires frequent access to containment during power operation for surveillances, maintenance and other routine activities that require containment access. ,
l On March 15, 1982 in letter AECM-82/0028, SERI provided the NRC an assessment of the radiological doses expected for personnel requiring entry into the '
containment and proposed guidelines for the use of the containment purge in order to limit personnel dose.
This assessment was based on expected coolant leakage into the containment atmosphere and design values for reactor coolant fission product concentrations ,
- based on BWR operating experience.
As discussed in the March 15, 1982 letter, SERI proposed use of the Containment l Ventilation and Filtration System in one of two modes for purging the containment atmosphere, namely, a low volume purge (LVP) and a high volume purge (HVP) mode. The LVP (500 cfm) uses single supply and exbnust ,
penetrations (6" nominal diameter) and is designed primarily to provide a l l constant source of fresh air for the comfort and protection of personnel i l
required to perform work in the containment during plant operation. The HVP !
is rated at a maximum of 6000 cfm and also utilizes single supply and exhaust j
penetrations (20" nominal diameter).
Usage of the high volume purge mode is currently limited in Operational i
Conditions 1, 2 and 3 to 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> per 365 days by GGNS Technical !
! Specification 3.6.1.9. Technical Specification 3.6.1.9 also prohibits the use !
of both the HVP and the LVP at the same time. I i
In light of the containment purge data obtained during Cycle 2 operation, as documented in letter AECM-87/0250 dated December 31, 1987, the following 7
, paragraphs describe the proposed long term containment purge program for GGNS l l
Unit 1. '
l i
i J14AECM88110101 - 6 1
Attachment 1 to AECM-88/0214 Proposed Containment Purae Program The LVP and HVP will remain isolated during Operational Conditions 1, 2 and 3 except as needed to maintain the primary containment atmosphere within the established guidelines described below. The guidelines will be administrative 1y controlled.
The Shift Superintendent will determine that the primary containment needs to be purged with either the LVP or HVP based on one of the following reasons:
a) Relative Humidity > 90%
b) Average Containment Temperature > 90*F c) Explosive Gas > 0% Lower Explosive Limit d) Oxygen Concentration < 19.5%
e) Airborne Particulate > 25% Maximum Permissible Concentration (MPC) f) Radioactive Gases > 25% MPC i
g) Containment Pressure Control (< -2" WC or > 5" WC) h) LVP or HVP required in service to perform surveillances and for purge system maintenance, modifications or retests.
If either the LVP or HVP are needed because of high MPC, the system may be l left running until the cause of the high MPC is found and corrected, even though this parameter may have dropped back below < 25% MPC. This is to prevent repeated initiation of the LVP or HVP. In all other cases, the LVP or HVP will be secured once the parameter has returned to an l acceptable value.
Unrestricted containment purge using the LVP or HVP will be limited to only Operational Conditions 4 and 5.
GGNS Technical Specification 3/4.6.1.9 and its Bases are included with this Attachment and are marked up to reflect the proposed long term containment purge program. As discussed above, the HVP would no longer be rettricted to
- 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> of operation per 365 days in Operational Conditions 1, 2 and 3. By l allowing the HVP to only operate to maintain the primary containment atmosphere within established guidelines or for surveillance tests or for purge system maintenance, modifications or retests which require the HVP, the HVP would only be used when needed.
J14AECM88110101 - 7 I
CONTAINMENT SYSTEMS CONTAINMENT PURGE SYSTEM LIMITING CONDITION FOR OPERATION 3.6.1.9 The containment purge system supply and exhaust isolation valves shall be OPERABLE and either the 20 inch or the 6 inch purge system may be in operation; however,Jthe 20 inch purge eystem sh;il not be in ;perati;n n;r sheli the 20 inch velves be spen fer acre than 1000 bcur; per 300 days.
APPL.ICABILITY: OPERATIONAL CONDITIONS 1, 2 and 3.
ACTION: .
- a. With a containment purge system supply and/or exhaust isolation valve (s) inoperable, close the inoperable valve (s) or oOerwise isolate the penetration (s) within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at leist HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUT 00WN witain the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
. the 20 inch containment purge system in operation d h ly and/or exhaust isolation v the 2 open for more than 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> pe s, disco inch purge system operation and close the valve (s) or otherwise isolate the penetratio ' n four hours or t least HOT SHUT 00WN wit next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUT 00WN wit ollowing
. hours.
h With a containment purge supply and/or exhaust isolation valve with resilient material seals having a measured leakage rate exceeding the limit of Surveillance Requirement 4.6.1.9.2, restore the inoperable valve (s) to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT SHUT 00WN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUTOOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4M.9.1 he-"la ive time that the 20 inch containm ' -
em as been in operation and the - H ma -
~
inch supply and/or x u en during dm p44t 3SLdays shall be 4.6.1.9.B- At least once per 92 days each containment purge supply and exhaust isolation valve with resilient material seals shall be demonstrated OPERABLE by verifying that the measured leakage rate is less than or equal to 0.01 L, when pressurized to P,.
GRAND GULF-UNIT 1 3/4 6-12
Insert to 3.6.1.9 both the 20 inch and 6 inch purge systems shall not be in operation simultaneously. The 20 inch and 6 inch purge systems shall be used only to maintain the primary containment atmosphere within established guidelines or for surveillance tests or for purge system maintenance, modifications or retasts which require a purge system operating.
J14AECM88110101 - 8
CONTAINMENT SYSTEMS BASES 3/4.6.1.5 FEEDWATER LEAKAGE CONTROL SYSTEM The feedwater leakage control system consists of two independent subsystems i designed to eliminate through-line leakage in the feedwater piping by pres- ;
surizing the feedwater lines to a higher pressure than the containment and ,
drywell pressure. This ensures that no release of radioactivity through the l feedwater line isolation valves will occur following a loss of all offsite power coincident with the postulated design basis loss-of-coolant accident.
3/4.6.1.6 CONTAINMENT STRUCTURAL INTEGRITY This limitatio,n ensures'tnat the structural integrity of the containment will be maintained comparable to the original design standards for the life of the unit. Structural integrity is required to ensure that the containment will ;
withstand the maximum pressure of 11.5 psig in the event of a LOCA. A visual inspection in conjunction with Type A leakage tests is sufficient to demonstrate .
this capability.
3/4.6.1.7 CONTAINMENT INTERNAL PRESSURE The limitations on containment-to-Auxiliary Building and Enclosure Building differential pressure ensure that the containment peak pressure of 11.5 psig does not exceed the design pressure of 15.0 psig during LOCA conditions or that the external pressure differential does not exceed the design maximum external pressure differential of 3.0 psid. The limit of -0.1 to 1.0 psid for initial containment-to-Auxiliary Building and Enclosure Building differential pressure will limit the containment pressure to 11.5 psid which is less than the design pressure and is consistent with the safety analysis.
3/4.6.1.8 CONTAINMENT AVERAGE AIR TEMPERATURE The limitation on containment average air temperature ensures that the i containment peak air temperature does not exceed the design temperature of 185'F during LOCA conditions and is consistent with the safety analysis.
3/4.6.1.9 CONTAINMENT PURGE SYSTEM N tinuous use of the containment purge lines during all a conditions is r W to the 6-inch purge supply and isolation valves; whereas, continuous ment pur e 20-inch purge system INSERT is limited to only OPERATIONAL CON 5. Intermittent use of the 20-inch pur e system du TIONAL CONDITI0t , 3 is allowed only to reduce a ctivity levels and shall not exceed 1000 se per The design of the 6-inch purge supply and exhaust isolation valves meets the requirements of Branch Technier Position CSB 6-4, "Containment Purging Ouring Normal Plant Operations."
GRAND GULF-UNIT 1 B 3/4 6-2
Insert to Bases 3/4.6.1.9 Use of either the 6-inch or 20-inch purge system during OPERATIONAL CONDITIONS 1, 2 and 3 is allowed only to maintain the primary containment atmosphere within established guidelines to facilitate personnel access for operational, surveillance and maintenance activities; or for surveillance tests and for purge system maintenance, modifications or retests which require a containment purge system to be operating. In OPERATIONAL CONDITIONS 4 and 5, usage of either the 6-inch or 20-inch purge system is unrestricted.
i J14AECM88110101 - 9
7= ,
.
,. . AECH-88/0214 NRC REQUEST In Table 1 attached to your submittal of AECM-87/0250. you have listed purging times as follows:
13.90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> for containment pressure relief 10.45 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br /> for reducing local MPC levels Various time periods for surveillance For these monitortd purges, provide the containment pressures, radioactivity levels, and temperatures at the beginning and end of each purging.
RESPONSE
During the Cycle 2 time period of February 17, 1986 to November 6, 1987, both the LVP and HVP systems were maintained as normally isolated.
Use of the LVP was required on fifteen occasions during the Cycle 2 time period while in Operational Conditions 1, 2 and 3. The total duration of LVP usage was 83.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or approximately 1.2% of the total applicable Cycle 2 duration.
The applicable Cycle 2 duration is considered to be the time period of February 17 to November 6, 1987. The unit was shut down on November 6, 1987 for the second refueling outage.
The HVP was used four times during the applicable Cycle 2 duration. The total duration of high volume purge was 11.25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> or 1.125% of the 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> per 365 days currently allowed by Technical Specification 3.6.1.9.
Table 1 of the Attachment to AECM-87/0250 provided a summary of the low and high volume purge usage dates, run times and purpose. This Table is also included in this submittal for ease of reference.
The containment pressures, radioactivity levels, and temperatur es at the beginning and end of each purge listed in Table 1 are not available. The containment pressure and temperature are recorded as required by Technical Specifications every twelve hours. The pressures and temperatures for the Table 1 purge dates are provided in Table 2 of this attachment. The containment radiation levels are measured weekly and were previously submitted for Cycle 2 in AECM-87/0250 as Figure 2 (Maximum Permissible Concentration fraction versus time).
The Table 3 provides a brief summary of why the LVP and HVP were used each time during Cycle 2.
i J14AECK88110101 - 10
Attachment 2 to
. AECM-88/0214 TABLE 1 HIGH AND LOW VOLUME CONTAINMENT PURGE USAGE DURING CYCLE 2 OPERATICNAL CONDITIONS 1, 2 OR 3 Date Run Time (Hours) Purpose 3/4/87 3.50 Surveillances*
3/7/87 1.10 Maintenance
- 3/17-18/87 23.90 Containment Pressure Relief
- 3/30/87 5.00 Surveillances*
4/30/87 4.68 Surveillances*
5/4/87 3.75 Maintenance
- 5/6/87 0.05 Maintenance Retest
- 5/8/87 7.15 Surveillances*
5/12/87 1.77 Maintenance
- 5/17/87 10.45 Reduce Local MPC Levels
- 5/28/87 6.83 Surveillances**
6/3/87 1.00 Surveillances**
7/11-12/87 5.87 Surveillances*
8/12/87 4.43 Surveillances*
l 8/13/87 0.92 Surveillances**
8/27/87 2.50 Surveillances**
9/12/87 7.20 Surveillances*
10/15/87 4.27 Surve111ances*
- LVP Usage Only l ** HVP Usage Only l
J14AECK88110101 - 11 l
t
Attachment'2 to
,. . AECM-88/0214 TABLE 2 CONTAINMENT PRESSURE AND TEMPERATURE FOR EACH CONTAINMENT PURGE DATE Average Containment Average Containment Date- Pressure (PSIG) Temperature (*F) 3/4/87 0.1 74 3/7/87 0.0 74 3/17/87, 0. 0 76
.3/18/87 0.0 77 3/30/87, 0.0 77 1
4/30/87 0.0 79 5/4/87 0.0 81 5/6/87 0. 0 80 5/8/87 0.0 79 6/12/87 0.0 79 5/14/87 0.0 81 5/17/97 0.0 81 5/28/87 0.0 76 6/3/87 0.0 78 7/11/87 0.0 78 7/12/87 0.0 79 l
8/12/87 0.0 81 8/13/87 0.0 81 8/27/87 0.0 81 9/12/87 0.0 81
[
10/15/87 0. 0 81 l
a J14AECM88110101 - 12 i
u.
g J 7 1
h
' ' =- Attachment 2 to
.. . AECM-88/0214 TABLE 3 CONTAINMENT PURGE USAGE
SUMMARY
On March 4, 1987, the LVP was operated for 3.50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> to perform surveillances CH 1063 and CH 1066. These two surveillances are performed monthly in ,
accordance with the requirements of Technical Specifications 4.11.2.1.1 and l 4.11.2.1.2. Both of these surveillances, in order to be performed, require the l operation of either the LVP or HVP. !
On March 7, 1987, one of the containment exhaust charcoal filter trains was !
. tested to ensure train bypass flow was within limits as required by ANSI f N510-1975. This test required LVP system flow be established. LVP was in oporation for 1.10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> for this test. ,
LVP was used on March 17 - 18, 1987 when containment pressure exceeded the 5" water column limit. The pressure transient was due primarily to a low pressure weather system that caused a drop in atmospheric pressure; thereby, causing a
- differential pressure between the auxiliary building and the containment. The LVP was utilized 13.90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> to relieve the differential pressure.
On March 30, 1987, the LVP was operated for 5.00 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> to perform surveillances CH 1063 and CH 1066.
On April 30, 1987, the LVP was operated for 4.68 hours7.87037e-4 days <br />0.0189 hours <br />1.124339e-4 weeks <br />2.5874e-5 months <br /> to perform surveillances
- CH 1063 and CH 1066.
On May 4, 1987, the quarterly surveillance INA947 was attempted to be performed in accordance with tbt requirements of Technical Specification 4.3.7.12. This surveillance test in order to be performed requires either the LVP or HVP be in operation. However, the exhaust fans would not run from the control room. A maintenance work order was written to correct the problem and troubleshooting was performed. The LVP ran for 3.75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br />. A faulty relay was found and i replaced on May 6, 1987 which required the LVP be opercted for 0.05 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> to perform a maintenance retest.
j Surveillance INA947 was attempted again on May 8, 1987 using the LVP for i' 7.15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br />; howover, difficulty with a flow monitor prevented successful completion. A maintenance work order was written to correct the pechlem. On l May 12, 1987 troubleshooting commenced which required the LVP be placed into operation for 1.77 hours8.912037e-4 days <br />0.0214 hours <br />1.273148e-4 weeks <br />2.92985e-5 months <br />. On May 14, 1987 the LVP was operated for 0.38 hours4.398148e-4 days <br />0.0106 hours <br />6.283069e-5 weeks <br />1.4459e-5 months <br /> l to allow engineering to witness the trouble. The surveillance procedure for INA947 was rewritten to correct the problem.
! During May 1987 containment MPC was gradually increasing. Upon investigation j it was determined a reactor water cleanup (RWCU) heat exchanger seal was leaking. In order to perform maintenance, the LVP was operated for 10.45 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br /> i on May 17, 1987 to reduce the local MPC value in the RWCU heat exchanger cubicle and lower maintenance personnel dose exposure as low as reasonably i
achievable.
l l
l
- J14AECM88110101 - 13 r
l j '* * .
Attachment 2 to
' * , AECM-88/0214 TABLE 3 a' CONTAINMENT PURGE USAGE
SUMMARY
(continued)
The HVF was used 6.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br /> on May 28, 1987 to perform surveillances CH 1063, CH 1066, INA947 and IN0517. IN0517 is a quarterly surveillance required by Technical Specification 4.3.7.12 and ner.Os a purge system in operation for performance.
Surveillance CH 1066 was performed on June 3,1987 using the HVP for 1.00 hour0 days <br />0 hours <br />0 weeks <br />0 months <br />.
The LVP was operated 5.87 hours0.00101 days <br />0.0242 hours <br />1.438492e-4 weeks <br />3.31035e-5 months <br /> on July 11 and 12, 1987 to perform surveillances CH '063 and CH 1066.
August 12, 1987, the LVP was operated 4.43 hours4.976852e-4 days <br />0.0119 hours <br />7.109788e-5 weeks <br />1.63615e-5 months <br /> for the performance of surveillances CH 1063 and CH 1066.
Surveillance INA947 was performed on August 13, 1987 using the HVP for 0.92 hour0.00106 days <br />0.0256 hours <br />1.521164e-4 weeks <br />3.5006e-5 months <br />.
The HVP operated for 2.50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> August 27, 1987 to perform surveillance IN0517.
Surveillances CH 1063 and CH 1066 were performed September 12, 1987 using the LVP for 7.20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />.
On October 15, 1987, the LVP ran for 4.27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> to allow performance of surveillances CH 1063 and CH 1066.
J14AECM88110101 - 14