AECM-88-0214, Forwards Response to NRC 880809 Request for Addl Info Re long-term Containment Purge Criteria & marked-up Version of Containment Purge Sys Tech Specs

From kanterella
Jump to navigation Jump to search
Forwards Response to NRC 880809 Request for Addl Info Re long-term Containment Purge Criteria & marked-up Version of Containment Purge Sys Tech Specs
ML20196D807
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/06/1988
From: Cesare J
SYSTEM ENERGY RESOURCES, INC.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
AECM-88-0214, AECM-88-214, NUDOCS 8812090204
Download: ML20196D807 (13)


Text

a

%/ .

EVETEM ENERGY RESOtJRCEE, INC.

DfJ G C15/R J?

Qg, December 6, 1988 U. S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D. C. 20555 Attention: Document Control Desk Gentlemen:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No, i'PF-29 Containment Pt.rge Progrem -

Response to NRC Staff Request AECM-88/0214 System Energy Resources, Inc. (SERI) submitted in letter AECM-87/0250, dated December 31, 1987 the Cycle 2 Containment Purge Monitoring Report for Grand Gulf Nuclear Station (GGNS). By letter dated August 9, 1988 (MAEC-88/0218), the NRC staff requested additional information regarding the GGNS long term containment purge criteria.

The attachments h this letter are SERI's response to the ItRC staff's request. SERI's respuuse incorporates the NRC staff guidance provided in an October 25, 1988 telaphone conference call between SERI and the NRC staff.

Attachment 1 provides a discussion of proposed revisions to the GGNS Unit i long term containment purge criteria and a marked up version of the containment purge system Technical Specification. The marked up pages reflect the incorporation of the GGNS Unit i long term containment purge criteria into the Technical Specifications. The proposed marked up pages are not intended at this time as a formal request to change the GGNS Technical Specifications.

These changes are provided for NRC staff information and to facilitate further discussions. A formal Technical Specification amendment request will be submitted to the NRC within 120 days following completion of the NRC staff review of the G6NS Unit I long term containment purge criteria.

Attachment 2 provides additional information requested by the NRC staff concerning the reasons why the containment purge system was used each time during GGNS Cycle 2.

$$k2]Q{y $h yf P

OY

, e o w l m n. .: wr.:.<.c lw , m a '\ \

  • " " ' ~ ' * * "

J14AECM88110101 - 3

'AECN-86JYO!

Tage ?'

  • Please advise if additional information is required.

Yours truly, N, 7 h-f JGC:jjb Attachments cc: .Mr.T.H.Cloninger(w/a)

Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds (w/a)

Mr. H. L. Thomas (w/o)

Mr. H. O. Christensen (w/a)

Mr. Malcolm L. Ernst (w/a)

Acting Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 Mr. L. L. Kintner, Project Manager (w/a)

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 14B20 Washington, D.C. 20555 I

I i

I r

l J14AECM88110101 - 4 l

t Attachment 1 to AECM-88/0214 NRC REQUEST The original objective for the monitoring program was to u=,.'..r a basis for long term purge criteria, and the existing (TS) were intended to be used only until.this program is complete. Because the generated data

+ base shows that only 1% of the TS allowable purge time is required, your

. proposal to maintain the current TS limit is inappropriate. Therefore, yoo are requested to-send a revised purge program with accompanying ,

Technical Specifications that more adequately reflects the findings of

, containment purge data obtained during Cycle 2 operation.

RESPONSE

The Mark III Containment is unique when compared to earlier BWR containment designs in that a large portion of the reactor coolant carrying support systems are located inside the primary containment. Although desirable from an accident release containment view point, this design requires frequent access to containment during power operation for surveillances, maintenance and other routine activities that require containment access. ,

l On March 15, 1982 in letter AECM-82/0028, SERI provided the NRC an assessment of the radiological doses expected for personnel requiring entry into the '

containment and proposed guidelines for the use of the containment purge in order to limit personnel dose.

This assessment was based on expected coolant leakage into the containment atmosphere and design values for reactor coolant fission product concentrations ,

based on BWR operating experience.

As discussed in the March 15, 1982 letter, SERI proposed use of the Containment l Ventilation and Filtration System in one of two modes for purging the containment atmosphere, namely, a low volume purge (LVP) and a high volume purge (HVP) mode. The LVP (500 cfm) uses single supply and exbnust ,

penetrations (6" nominal diameter) and is designed primarily to provide a l l constant source of fresh air for the comfort and protection of personnel i l

required to perform work in the containment during plant operation. The HVP  !

is rated at a maximum of 6000 cfm and also utilizes single supply and exhaust j

penetrations (20" nominal diameter).

Usage of the high volume purge mode is currently limited in Operational i

Conditions 1, 2 and 3 to 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> per 365 days by GGNS Technical  !

! Specification 3.6.1.9. Technical Specification 3.6.1.9 also prohibits the use  !

of both the HVP and the LVP at the same time. I i

In light of the containment purge data obtained during Cycle 2 operation, as documented in letter AECM-87/0250 dated December 31, 1987, the following 7

, paragraphs describe the proposed long term containment purge program for GGNS l l

Unit 1. '

l i

i J14AECM88110101 - 6 1

Attachment 1 to AECM-88/0214 Proposed Containment Purae Program The LVP and HVP will remain isolated during Operational Conditions 1, 2 and 3 except as needed to maintain the primary containment atmosphere within the established guidelines described below. The guidelines will be administrative 1y controlled.

The Shift Superintendent will determine that the primary containment needs to be purged with either the LVP or HVP based on one of the following reasons:

a) Relative Humidity > 90%

b) Average Containment Temperature > 90*F c) Explosive Gas > 0% Lower Explosive Limit d) Oxygen Concentration < 19.5%

e) Airborne Particulate > 25% Maximum Permissible Concentration (MPC) f) Radioactive Gases > 25% MPC i

g) Containment Pressure Control (< -2" WC or > 5" WC) h) LVP or HVP required in service to perform surveillances and for purge system maintenance, modifications or retests.

If either the LVP or HVP are needed because of high MPC, the system may be l left running until the cause of the high MPC is found and corrected, even though this parameter may have dropped back below < 25% MPC. This is to prevent repeated initiation of the LVP or HVP. In all other cases, the LVP or HVP will be secured once the parameter has returned to an l acceptable value.

Unrestricted containment purge using the LVP or HVP will be limited to only Operational Conditions 4 and 5.

GGNS Technical Specification 3/4.6.1.9 and its Bases are included with this Attachment and are marked up to reflect the proposed long term containment purge program. As discussed above, the HVP would no longer be rettricted to

1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> of operation per 365 days in Operational Conditions 1, 2 and 3. By l allowing the HVP to only operate to maintain the primary containment atmosphere within established guidelines or for surveillance tests or for purge system maintenance, modifications or retests which require the HVP, the HVP would only be used when needed.

J14AECM88110101 - 7 I

CONTAINMENT SYSTEMS CONTAINMENT PURGE SYSTEM LIMITING CONDITION FOR OPERATION 3.6.1.9 The containment purge system supply and exhaust isolation valves shall be OPERABLE and either the 20 inch or the 6 inch purge system may be in operation; however,Jthe 20 inch purge eystem sh;il not be in ;perati;n n;r sheli the 20 inch velves be spen fer acre than 1000 bcur; per 300 days.

APPL.ICABILITY: OPERATIONAL CONDITIONS 1, 2 and 3.

ACTION: .

a. With a containment purge system supply and/or exhaust isolation valve (s) inoperable, close the inoperable valve (s) or oOerwise isolate the penetration (s) within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at leist HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUT 00WN witain the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

. the 20 inch containment purge system in operation d h ly and/or exhaust isolation v the 2 open for more than 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> pe s, disco inch purge system operation and close the valve (s) or otherwise isolate the penetratio ' n four hours or t least HOT SHUT 00WN wit next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUT 00WN wit ollowing

. hours.

h With a containment purge supply and/or exhaust isolation valve with resilient material seals having a measured leakage rate exceeding the limit of Surveillance Requirement 4.6.1.9.2, restore the inoperable valve (s) to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT SHUT 00WN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUTOOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4M.9.1 he-"la ive time that the 20 inch containm ' -

em as been in operation and the - H ma -

~

inch supply and/or x u en during dm p44t 3SLdays shall be 4.6.1.9.B- At least once per 92 days each containment purge supply and exhaust isolation valve with resilient material seals shall be demonstrated OPERABLE by verifying that the measured leakage rate is less than or equal to 0.01 L, when pressurized to P,.

GRAND GULF-UNIT 1 3/4 6-12

Insert to 3.6.1.9 both the 20 inch and 6 inch purge systems shall not be in operation simultaneously. The 20 inch and 6 inch purge systems shall be used only to maintain the primary containment atmosphere within established guidelines or for surveillance tests or for purge system maintenance, modifications or retasts which require a purge system operating.

J14AECM88110101 - 8

CONTAINMENT SYSTEMS BASES 3/4.6.1.5 FEEDWATER LEAKAGE CONTROL SYSTEM The feedwater leakage control system consists of two independent subsystems i designed to eliminate through-line leakage in the feedwater piping by pres-  ;

surizing the feedwater lines to a higher pressure than the containment and ,

drywell pressure. This ensures that no release of radioactivity through the l feedwater line isolation valves will occur following a loss of all offsite power coincident with the postulated design basis loss-of-coolant accident.

3/4.6.1.6 CONTAINMENT STRUCTURAL INTEGRITY This limitatio,n ensures'tnat the structural integrity of the containment will be maintained comparable to the original design standards for the life of the unit. Structural integrity is required to ensure that the containment will  ;

withstand the maximum pressure of 11.5 psig in the event of a LOCA. A visual inspection in conjunction with Type A leakage tests is sufficient to demonstrate .

this capability.

3/4.6.1.7 CONTAINMENT INTERNAL PRESSURE The limitations on containment-to-Auxiliary Building and Enclosure Building differential pressure ensure that the containment peak pressure of 11.5 psig does not exceed the design pressure of 15.0 psig during LOCA conditions or that the external pressure differential does not exceed the design maximum external pressure differential of 3.0 psid. The limit of -0.1 to 1.0 psid for initial containment-to-Auxiliary Building and Enclosure Building differential pressure will limit the containment pressure to 11.5 psid which is less than the design pressure and is consistent with the safety analysis.

3/4.6.1.8 CONTAINMENT AVERAGE AIR TEMPERATURE The limitation on containment average air temperature ensures that the i containment peak air temperature does not exceed the design temperature of 185'F during LOCA conditions and is consistent with the safety analysis.

3/4.6.1.9 CONTAINMENT PURGE SYSTEM N tinuous use of the containment purge lines during all a conditions is r W to the 6-inch purge supply and isolation valves; whereas, continuous ment pur e 20-inch purge system INSERT is limited to only OPERATIONAL CON 5. Intermittent use of the 20-inch pur e system du TIONAL CONDITI0t , 3 is allowed only to reduce a ctivity levels and shall not exceed 1000 se per The design of the 6-inch purge supply and exhaust isolation valves meets the requirements of Branch Technier Position CSB 6-4, "Containment Purging Ouring Normal Plant Operations."

GRAND GULF-UNIT 1 B 3/4 6-2

Insert to Bases 3/4.6.1.9 Use of either the 6-inch or 20-inch purge system during OPERATIONAL CONDITIONS 1, 2 and 3 is allowed only to maintain the primary containment atmosphere within established guidelines to facilitate personnel access for operational, surveillance and maintenance activities; or for surveillance tests and for purge system maintenance, modifications or retests which require a containment purge system to be operating. In OPERATIONAL CONDITIONS 4 and 5, usage of either the 6-inch or 20-inch purge system is unrestricted.

i J14AECM88110101 - 9

7= ,

.

  • Attachment 2 to

,. . AECH-88/0214 NRC REQUEST In Table 1 attached to your submittal of AECM-87/0250. you have listed purging times as follows:

13.90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> for containment pressure relief 10.45 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br /> for reducing local MPC levels Various time periods for surveillance For these monitortd purges, provide the containment pressures, radioactivity levels, and temperatures at the beginning and end of each purging.

RESPONSE

During the Cycle 2 time period of February 17, 1986 to November 6, 1987, both the LVP and HVP systems were maintained as normally isolated.

Use of the LVP was required on fifteen occasions during the Cycle 2 time period while in Operational Conditions 1, 2 and 3. The total duration of LVP usage was 83.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or approximately 1.2% of the total applicable Cycle 2 duration.

The applicable Cycle 2 duration is considered to be the time period of February 17 to November 6, 1987. The unit was shut down on November 6, 1987 for the second refueling outage.

The HVP was used four times during the applicable Cycle 2 duration. The total duration of high volume purge was 11.25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> or 1.125% of the 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> per 365 days currently allowed by Technical Specification 3.6.1.9.

Table 1 of the Attachment to AECM-87/0250 provided a summary of the low and high volume purge usage dates, run times and purpose. This Table is also included in this submittal for ease of reference.

The containment pressures, radioactivity levels, and temperatur es at the beginning and end of each purge listed in Table 1 are not available. The containment pressure and temperature are recorded as required by Technical Specifications every twelve hours. The pressures and temperatures for the Table 1 purge dates are provided in Table 2 of this attachment. The containment radiation levels are measured weekly and were previously submitted for Cycle 2 in AECM-87/0250 as Figure 2 (Maximum Permissible Concentration fraction versus time).

The Table 3 provides a brief summary of why the LVP and HVP were used each time during Cycle 2.

i J14AECK88110101 - 10

Attachment 2 to

. AECM-88/0214 TABLE 1 HIGH AND LOW VOLUME CONTAINMENT PURGE USAGE DURING CYCLE 2 OPERATICNAL CONDITIONS 1, 2 OR 3 Date Run Time (Hours) Purpose 3/4/87 3.50 Surveillances*

3/7/87 1.10 Maintenance

  • 3/17-18/87 23.90 Containment Pressure Relief
  • 3/30/87 5.00 Surveillances*

4/30/87 4.68 Surveillances*

5/4/87 3.75 Maintenance

  • 5/6/87 0.05 Maintenance Retest
  • 5/8/87 7.15 Surveillances*

5/12/87 1.77 Maintenance

  • 5/14/87 0.38 Maintenance
  • 5/17/87 10.45 Reduce Local MPC Levels
  • 5/28/87 6.83 Surveillances**

6/3/87 1.00 Surveillances**

7/11-12/87 5.87 Surveillances*

8/12/87 4.43 Surveillances*

l 8/13/87 0.92 Surveillances**

8/27/87 2.50 Surveillances**

9/12/87 7.20 Surveillances*

10/15/87 4.27 Surve111ances*

  • LVP Usage Only l ** HVP Usage Only l

J14AECK88110101 - 11 l

t

Attachment'2 to

,. . AECM-88/0214 TABLE 2 CONTAINMENT PRESSURE AND TEMPERATURE FOR EACH CONTAINMENT PURGE DATE Average Containment Average Containment Date- Pressure (PSIG) Temperature (*F) 3/4/87 0.1 74 3/7/87 0.0 74 3/17/87, 0. 0 76

.3/18/87 0.0 77 3/30/87, 0.0 77 1

4/30/87 0.0 79 5/4/87 0.0 81 5/6/87 0. 0 80 5/8/87 0.0 79 6/12/87 0.0 79 5/14/87 0.0 81 5/17/97 0.0 81 5/28/87 0.0 76 6/3/87 0.0 78 7/11/87 0.0 78 7/12/87 0.0 79 l

8/12/87 0.0 81 8/13/87 0.0 81 8/27/87 0.0 81 9/12/87 0.0 81

[

10/15/87 0. 0 81 l

a J14AECM88110101 - 12 i

u.

g J 7 1

h

' ' =- Attachment 2 to

.. . AECM-88/0214 TABLE 3 CONTAINMENT PURGE USAGE

SUMMARY

On March 4, 1987, the LVP was operated for 3.50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> to perform surveillances CH 1063 and CH 1066. These two surveillances are performed monthly in ,

accordance with the requirements of Technical Specifications 4.11.2.1.1 and l 4.11.2.1.2. Both of these surveillances, in order to be performed, require the l operation of either the LVP or HVP.  !

On March 7, 1987, one of the containment exhaust charcoal filter trains was  !

. tested to ensure train bypass flow was within limits as required by ANSI f N510-1975. This test required LVP system flow be established. LVP was in oporation for 1.10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> for this test. ,

LVP was used on March 17 - 18, 1987 when containment pressure exceeded the 5" water column limit. The pressure transient was due primarily to a low pressure weather system that caused a drop in atmospheric pressure; thereby, causing a

- differential pressure between the auxiliary building and the containment. The LVP was utilized 13.90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> to relieve the differential pressure.

On March 30, 1987, the LVP was operated for 5.00 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> to perform surveillances CH 1063 and CH 1066.

On April 30, 1987, the LVP was operated for 4.68 hours7.87037e-4 days <br />0.0189 hours <br />1.124339e-4 weeks <br />2.5874e-5 months <br /> to perform surveillances

CH 1063 and CH 1066.

On May 4, 1987, the quarterly surveillance INA947 was attempted to be performed in accordance with tbt requirements of Technical Specification 4.3.7.12. This surveillance test in order to be performed requires either the LVP or HVP be in operation. However, the exhaust fans would not run from the control room. A maintenance work order was written to correct the problem and troubleshooting was performed. The LVP ran for 3.75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br />. A faulty relay was found and i replaced on May 6, 1987 which required the LVP be opercted for 0.05 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> to perform a maintenance retest.

j Surveillance INA947 was attempted again on May 8, 1987 using the LVP for i' 7.15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br />; howover, difficulty with a flow monitor prevented successful completion. A maintenance work order was written to correct the pechlem. On l May 12, 1987 troubleshooting commenced which required the LVP be placed into operation for 1.77 hours8.912037e-4 days <br />0.0214 hours <br />1.273148e-4 weeks <br />2.92985e-5 months <br />. On May 14, 1987 the LVP was operated for 0.38 hours4.398148e-4 days <br />0.0106 hours <br />6.283069e-5 weeks <br />1.4459e-5 months <br /> l to allow engineering to witness the trouble. The surveillance procedure for INA947 was rewritten to correct the problem.

! During May 1987 containment MPC was gradually increasing. Upon investigation j it was determined a reactor water cleanup (RWCU) heat exchanger seal was leaking. In order to perform maintenance, the LVP was operated for 10.45 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br /> i on May 17, 1987 to reduce the local MPC value in the RWCU heat exchanger cubicle and lower maintenance personnel dose exposure as low as reasonably i

achievable.

l l

l

J14AECM88110101 - 13 r

l j '* * .

Attachment 2 to

' * , AECM-88/0214 TABLE 3 a' CONTAINMENT PURGE USAGE

SUMMARY

(continued)

The HVF was used 6.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br /> on May 28, 1987 to perform surveillances CH 1063, CH 1066, INA947 and IN0517. IN0517 is a quarterly surveillance required by Technical Specification 4.3.7.12 and ner.Os a purge system in operation for performance.

Surveillance CH 1066 was performed on June 3,1987 using the HVP for 1.00 hour0 days <br />0 hours <br />0 weeks <br />0 months <br />.

The LVP was operated 5.87 hours0.00101 days <br />0.0242 hours <br />1.438492e-4 weeks <br />3.31035e-5 months <br /> on July 11 and 12, 1987 to perform surveillances CH '063 and CH 1066.

August 12, 1987, the LVP was operated 4.43 hours4.976852e-4 days <br />0.0119 hours <br />7.109788e-5 weeks <br />1.63615e-5 months <br /> for the performance of surveillances CH 1063 and CH 1066.

Surveillance INA947 was performed on August 13, 1987 using the HVP for 0.92 hour0.00106 days <br />0.0256 hours <br />1.521164e-4 weeks <br />3.5006e-5 months <br />.

The HVP operated for 2.50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> August 27, 1987 to perform surveillance IN0517.

Surveillances CH 1063 and CH 1066 were performed September 12, 1987 using the LVP for 7.20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />.

On October 15, 1987, the LVP ran for 4.27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> to allow performance of surveillances CH 1063 and CH 1066.