Forwards Application for Amend to License NPF-29,requesting Tech Spec Exception to Rule Requiring 4 Yrs of Responsible Power Plant Experience Before Receiving Senior Reactor Operator License for Two Candidates
ML20135C095
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/30/1985
From: Kingsley O
MISSISSIPPI POWER & LIGHT CO.
To: Harold Denton, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20135C097 List:
References
AECM-85-0270, AECM-85-270, TAC-59644, NUDOCS 8509110299
Download: ML20135C095 (2)


Text

_ _ _ . . _ _ . _ _ _ _ _ _ _

I l

MISSISSIPPI POWER & LIGHT COMPANY

)) Helping Build Mississippi Edhhikhildd5 P. O . B O X 16 4 0, J A C K S O N, MISSISSIPPI 39215-1640 August 30, 1985 O. D. KINGSLE Y, J R.

vtCE PRESIDENT NUCLEAR OPERATIONS U. S. Nuclear Regulatory Commission j Office of Nuclear Reactor Regulation i Washington, D. C. 20555 Attention: Mr. Harold R. Denton, Director

Dear Mr. Denton:

SUBJECT:

Grand Gulf Nuclear Station Unit I Docket No. 50-416 License No. NPF-29 File: 0260/0840/L-860.0 Proposed Amendment to the Operating License (PCOL-85/14)

AECM-85/0270 In accordance with the provisions of 10 CFR 50.59 and 10 CFR 50.90, Mississippi Power & Light (MP&L) requests an amendment to License NPF-29, for Grand Gulf Nuclear Station (CGNS) Unit 1.

In accordance with the provisions of 10 CFR 50.30, three (3) signed originals and forty (40) copies of the requested amendment are enclosed. The attachment provides the complete technical justification and discussion to support the requested amendment. This amendment has been reviewed and accepted by the Plant Safety Review Committee (PSRC) and the Safety Review Committee (SRC) .

Based on the guidelines presented in 10 CFR 50.92, it is the opinion of MP&L that this proposed amendment involves no significant hazards considerations.

In accordance with the requirements of 10 CFR 170.22, we have determined that the proposed amendment is considered to be administrative in nature.

Based on the guidance provided by the Project Manager (NRC), we have determined that the application fee is $150. A remittance of $150 is attached to this letter.

1\

l C 0[

g9110299850830 p ADOCK 05000416 0Q L0 PDR ,\ Q

{

J16AECM85082901 - 1

. Member Middle South Utilities System

AECM 85/0270 Page 2 MP&L requests NRC approval of this amendment request as soon as

! possible. The two individuals referenced in this submittal will be utilized as Shif t Supervisors and these additional SRO licenses will allow progression toward a six shift rotation, provide for enhanced shift maintenance l coordination and allow contractor phase out.

Yours ly, l

l ODK:bms

! Attachments: GGNS PCOL-85/14 cc: Mr. J. B. Richard (w/a)

Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds (w/a)

Mr. H. L. Thomas (w/o)

Mr. R. C. Butcher (w/a)

Mr. James M. Taylor, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. J. Nelson Grace, Regional Administrator (w/a)

U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 Dr. Alton B. Cobb (w/a)

State Health Officer State Board of Health Box 1700 Jackson, Mississippi 39205 J16AECM85082901 - 2