Forwards LER 97-006-00 Per 10CFR50.73(a)92)(ii)(B) Which Requires 30 Day Written Rept When Any Event or Condition Occurs That Resulted in Condition of Nuclear Power Plant. Regulatory Commitments Encl
ML20199K239
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 11/24/1997
From: Starkey R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199K245 List:
References
NUDOCS 9712010055
Download: ML20199K239 (2)


LER-2097-006, Forwards LER 97-006-00 Per 10CFR50.73(a)92)(ii)(B) Which Requires 30 Day Written Rept When Any Event or Condition Occurs That Resulted in Condition of Nuclear Power Plant. Regulatory Commitments Encl
Event date:
Report date:
3042097006R00 - NRC Website

text

- . _ _ _ _ _ _ __ _ . _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

. o.mnu,nmai. nw,n o,n,r..un y hon breirratmg Atetton l9l \!tils dl Ib ,L,Irt df d

- iv,n n mm re m n e .u.wu November 24,1997 U.S. Nuclear llegulatory Commission Document Control Desk Washington, DC 20555 Enclosed is Licensee Event 1'eport (LElt) number 2-97-006, Docket No. 50-000304 that is being submitted pursuant to 10CFR50.73(a)(2)(li)(II) which requires a 30 day writ'rn report when any event or condition occurs that resulted in the condition of the nur' ear power plant, including its principle safety barriers, being seriously degraded, or that resulted in the nuclear power plant being in a condition that was outside the design basis of the plant.

Attachment A provides commitments associated with this correspondence.

Very tr y irs, ,

/s A <

.S //.,4 yy Statl fanager Ziot Generating Stat on itS/jb

Enclosures:

Licensee Event Report Regulatory Commitment List xc: NRC Region til Administrator Wh)  ;

NRC Zion Resident inspector lilinois Department of Nuclear Safety IDNS Resident inspector 9712010055 971124 '

PDR ADOCK 05000304' 8 PDR .

s t nkom u,miwo

.Y

I ATTACilSIENT A l REGULATORY COSISilTAlENTS  !

i i

The Ibilowing identifies those actions committed to by Comlid in this document. Any other actions discussed is this submittal represent intended or planned actions by Comed. They are described to the NRC lbr the NRC's infbrmation and are not regulatory commitments.

Regulatory Conimitments Tracking Number Upon completion of the PAD development, a plant by plant assessment will be 304180975CAQ00010-01 performed with the modilled PAD model, using plant specific conditions.

Westinghouse will complete a plant specific assessment of compliance at least two weeks 30418097SCAQ00010-02 prior to reaching the 12*& sercening criterion (i.e., prior to Dec. 18, 1998).

7.lon Station to submit a supplems i to this LI R. 304180975CAQ00010-03