05000295/LER-1997-024, Forwards LER 97-024-00,per 10CFR50.73(a)(2)(i)(B). Commitments Made by Util,Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 97-024-00,per 10CFR50.73(a)(2)(i)(B). Commitments Made by Util,Encl
ML20203G113
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 12/12/1997
From: Starkey R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20203G118 List:
References
NUDOCS 9712180051
Download: ML20203G113 (2)


LER-2097-024, Forwards LER 97-024-00,per 10CFR50.73(a)(2)(i)(B). Commitments Made by Util,Encl
Event date:
Report date:
2952097024R00 - NRC Website

text

g *= ' o.mmonu cati namn o.miun>

<;k- - Zhnt Generating Nation 101 Milloit ik pulcutti -

n,n. n uun 2797

.% 1 M47-716 20Mi

(;

December 12,1997 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

- Enclosed is Licensee Event 1.eport (LER) number 1-97-024, Docket No. 50-000295 that is being submitted pursuant to 10CFR50.73 (a)(2)(i)(B), which requires a 30 day written report when any operation or condition occurs that is prohibited by the plant's Technical Specification.

Attachment A provides commitments associated with this correspondence.

Very truly yours, hR.Starkey-Station Manager Zion Generating Station RS!jb -

Enclosures:

Licensee Event Report Regulatory Commitment List xc: NRC Region til Administrator NRC Zion Resident Inspector I Illirais Department of Nuclear Safety hj l

, , , IDNS Resident inspector li y C 9 -

9712190051'971212 PDR -ADOCK 05000295-ll.. ll I.lli.RI.llll,lll.l sia, e.,_,

4 -

ATI'ACilMENT A REGULATORY COMMITMENTS The following identifies those actions committed to by Comed in this document. Any other actions discussed is this submittal represent intended or planned actions by Comed. They are described to the NRC for the NRC's information and are not regulatory commitments.

Regulatory Commitments Tracking Number The Instrument Maintenance Department will revise the appropriate 29518097SCAQ00015-01 surveillance procedures to ensure that the pressurizer pressure channel is adequately tested.

The pressurizer pressure "B" bistable will be tested prior to Unit 2 29518097SCAQ00015-02 mode change.

To prevent recurrence, the System Engineering Department will 29518097SCAQ00015-03 perform a review of Instrument Maintenance procedures to account for adequate overlap testing of other similar Eagle 21 bistable outputs. Any testing required as a result of this review will be completed prior to improved Technical Specification implementation.