05000295/LER-1997-012, Forwards LER 97-012-00,which Documents 970423 Event That Occurred at Zion Generating Station.Commitments Made by Util,Listed

From kanterella
Jump to navigation Jump to search
Forwards LER 97-012-00,which Documents 970423 Event That Occurred at Zion Generating Station.Commitments Made by Util,Listed
ML20141K950
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 05/23/1997
From: Starkey R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141K952 List:
References
NUDOCS 9706020156
Download: ML20141K950 (1)


LER-2097-012, Forwards LER 97-012-00,which Documents 970423 Event That Occurred at Zion Generating Station.Commitments Made by Util,Listed
Event date:
Report date:
2952097012R00 - NRC Website

text

'

i g*"""' (-(lilHIHHl% C.4lll1 l1.}l%on Contpdn}

Zion Generating Station 101 Shiloh liouleurd

, /jort. lL (a)99 2'9' Tcl 8 I' ~ 46-208 6 l May 23, 1997 U.S. Nuclear Regulatory Commission l Document Control Desk Washington, DC 20555 l

l The enclosed Licensee Event Report number 97-012. Docket No. 50-295/DPR-39

from Zion Generating Station is being transmitted to you in accordance with l 10CFR50.73(a)(2)(i)(B) which requires a 30 day written report when any i

operation or condition occurs that is prohibited by the plant's Technical Speci fications.

Corrective Actions include:

! 1. The low level readiness test procedure (PT-15C) will be changed prior to the next performance to include the manufacturer's acceptance criteria.

2. The high level readiness test procedure (TSS-15.6.105) will be changed l prior to the next performance to include the updated manufacturer's acceptance criteria.
3. Technical Specification amendment policies in place now require detailed review and personal accountability for changes to the Technical l Specification to ensure compliance.
4. The onsite vendor manual for the Hydrogen Recombiner will be updated to reflect the new vendor recommendations. I S. Management's expectations for maintaining procedural and Technical Specification compliance were communicated to personnel during a series of meetings conducted in the fall of 1996.
6. The results of the 1995 Technical Specification Compliance Self Assessment will be reviewed to ensure that other findings have been appropriately addressed, i

Very truly yours, f$

-R. Starkey Station Manager '

Zion Generating Station j1 ~d~d }

l RS/js

Enclosure:

Licensee Event Report l

cc: NRC Region III Administrator NRC Resident Inspector llllllllllllllllllllllllllllll[lll IDNS Resident Inspector =-

3 00 05 7 INP0 Record -Center Illinois Department of Nuclear Safety 9706020156 970523 PDR ADOCK 05000295 S PDR