05000295/LER-1997-016, Forwards LER 97-016-00 Re Failure to Recognize That 125 Vdc Buses Were Inoperable During Inter Unit cross-tie.Event Investigation Is Ongoing & Corrective Actions Will Be Provided in Supplemental LER

From kanterella
Jump to navigation Jump to search
Forwards LER 97-016-00 Re Failure to Recognize That 125 Vdc Buses Were Inoperable During Inter Unit cross-tie.Event Investigation Is Ongoing & Corrective Actions Will Be Provided in Supplemental LER
ML20216J526
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 09/12/1997
From: Starkey R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20216J529 List:
References
NUDOCS 9709170353
Download: ML20216J526 (1)


LER-2097-016, Forwards LER 97-016-00 Re Failure to Recognize That 125 Vdc Buses Were Inoperable During Inter Unit cross-tie.Event Investigation Is Ongoing & Corrective Actions Will Be Provided in Supplemental LER
Event date:
Report date:
2952097016R00 - NRC Website

text

_ _ _ _ _ _ - .

n.nononnann sanon i onqum e /. ton f orm ratang %t.thoit o 3 01 Mul4 th lb 6ub n .nd

/mn,11_ (n on T9' a u 8 i- n, .>os .

Y September 12,1997 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20$$$

l l

The enclosed Licensee Event Report number I 97 016 Docket No. 50 000295 from Zion Generating Station is being transmitted to you in accordance with 10CFR$0.73 (a)(2)(ii),

which requires a 30 day written report when any event or condition that resulted in the condition of the nuclear power plant, including its principal safety bairiers, being seriously degraded, or that resulted in the nuclear power plant being:(A) In an unanalyred condition that significantly compromised plant safety;(11) in a condition that was outside the design basis of the plant; or (C) In a condition not covered by the plant's operating and emergency procedures.

The event investigation is ongoing and not complete at the time of this coirespondence. The enclosed LER provides the event insestigation for the esent. Conective actions will be provided in the supplemental LilR.

Attachment A provides the commitment for the submittal of the supplemental LER.

Very truly yourc.,

g. --

R. Starkey Station Manager Zion Generating Station RS/jb [ED 3

Enclosure:

Licensee Event Report ec: NRC Region ill Administrator NRC Resident inspector IDNS Resident inspector INPO Record Center lilinois Department of Nuclear Safety 9709170353 970912 lllll till iill "Ill11till 11 PDR ADOCK 05000295 l!Illii I