05000245/LER-1996-039, Forwards LER 96-039-02 Re IST of Valves Not Being Performed IAW Program & ASME Code Requirements.Suppl of Completion of Commitments Provided

From kanterella
(Redirected from 05000245/LER-1996-039)
Jump to navigation Jump to search
Forwards LER 96-039-02 Re IST of Valves Not Being Performed IAW Program & ASME Code Requirements.Suppl of Completion of Commitments Provided
ML20216C042
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/02/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20216C047 List:
References
B16703, NUDOCS 9709080213
Download: ML20216C042 (2)


LER-2096-039, Forwards LER 96-039-02 Re IST of Valves Not Being Performed IAW Program & ASME Code Requirements.Suppl of Completion of Commitments Provided
Event date:
Report date:
2452096039R00 - NRC Website

text

. _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ - - _ _ - - - - - _ _ _ _ - - - - - - - -- - --- -

Nonalua4 '"")"t""""**'"'"'d'""'"

hhyd / NuelearEnergy mi+.n, wa. ., n .n soi ..n brilwet Niu lrar l'.ncrp Conipan)

P O. Ika 1.'8 4 strsford. Ul Ob3n's-0128 (Ni0) 447 l?41 l'at (800) 444 4277

'ihe %rtimt Utilitic, %>atrin i

SEP - 2 1997 Docket No 50-245 p16703 Re: 10CFR50.73(a)(2)(i)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 This letter forwards a supplemental Licensee Event Report (LER) 96-039-02 documenting an event that occurred at Millstone Nuclear Power Station, Unit No.1 on June 4,1996. This LER is submitted pursuant to 10CFR50.73(a)(2)(i).

This supplement documents the completion of Commitment Nos. B15784-2, B15784-3, and B15784-4. Commitment B15784 2 committed to revise the cold shutdown surveillance procedure (SP608.35) for valve 1-AC-51 to require individual testing of the valve. Commitment B15784-4 committed to create an instructional document to give guidance on developing and implementing IST Programs. Commitment B15784 3 committed to resolve the Pressure Isolation Valve (PlV) designation of valves 1-SD-1, 1-SD 2A,1-SD-2B and 1 SD-5.

Northeast Nuclear Energy Company has determined that these valves will not be designated as PlVs. Procedural controls have been implemented to restrict cross connecting the Shutdown Cooling (SDC) system to the Spent Fuel Cooling (SFPC) system whenever reactor coolant temperature is greater than 212 degrees F or primary containment is required. The cause of the event has been modified to clarify the personnel error issue.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY .

' [,<I[

k r 1O P.D. Hinnenka'mp ( ___.)

t, L s >

Director, Unit Operations

Attachment:

LER 96-039-02 9709000213 970902 PDR S

ADOCK 05000245 PDR

{\.\{}{L[\h'kkkhkh 3 ,,,,,,, ,, , . . , ,

'U. S. Nuclear Regulatory Commission

,1116703 / Page 2 cc: H. J. Miller, Region i Administrator T. A. Eastick, Senior Resident inspector, Millstone Unit No.1 S. Dembek, NRC Project Manager, Millstone Unit No.1 ('

W. D. Travers, Ph.d Director, Special Projects Office l

. . , . . . . .., . . ... 4 . ~ . . . . . . . - ...- .

U