ML20135A419

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-373/96-10 & 50-374/96-10 & Notice of Violation
ML20135A419
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 11/26/1996
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Subalusky W
COMMONWEALTH EDISON CO.
Shared Package
ML20135A422 List:
References
NUDOCS 9612030216
Download: ML20135A419 (2)


See also: IR 05000373/1996010

Text

. , - - - - - - - - - - - . - - . - - . _ - - - . - . - - - . - - . - . . -

,

.

! Novsuber 26, 1996 'O l

!

4

-

- Mr. W. T. Subalusky, Jr.

4 Site Vice President

! LaSalle County. Station

Commonwealth. Edison Company

i' 2601 N. 21st Road i

,

. Marseilles, IL- 61341

,

,. SUBJECT: NRC INSPECTION REPORT NO. 50-373/96010; 50-374/96010(DRP) '

AND NOTICE OF VIOLATION  :

L- Dear Mr. Subalusky: i

i  !

j' On September 13, 1996, the NRC completed an inspection at your LaSalle [

facility. The enclosed report presents the results of that inspection, i

! Based on the results of this inspection, the NRC has. determined.that a i

i violation of NRC requirements occurred. The violation is cited in the >

[ enclosed Notice of Violation (Notice) and the circumstances surrounding the

i violation are described in detail in the enclosed inspection report. The t

l- violation is of concern because it exemplifies weaknesses in your conduct of

i root cause analyses.

i You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. In your

j response, you should document the specific actions taken and any. additional r

t actions you plan to prevent recurrence. Your response may reference or I

! ' include previous docketed correspondence, if the correspondence adequately

'

addresses the required response. After reviewing your response to this )

i Notice, including your proposed corrective actions and the results of future

i -inspections', the NRC will determine whether further NRC enforcement action is

. necessary to ensure compliance with NRC regulatory requirements.

! In accordance with 10 CFR 2.790.of the NRC's " Rules of Practices," a copy of

, this-letter, its enclosure, and-your response will be placed in the NRC Public

.

Document Room (PDR).

1

Sincerely,

!

/s/ John A. Grobe for

James L. Caldwell, Acting Director

Division of Reactor Projects

DOCUMENT NAME: R:INSPRPTS\ POWERS \LASA\LAS96010.DRP

To receive a copy of this document, indicate in the be.u "C" = Copy w/o attach /enci "E" = Copy w/ attach /enct "N" = No copy

0FFICE DRP VW W El & DRP e I c- DRP /n// l l

NAME MMcBa'rg6rfsn Jor W sen CaldWFT73 robe

DATE 10/22196 10/z2796 80/lI/96

0FFICIAL RECORD COPY l

9612030216 961126

PDR ADOCK 05000373

G PDR &

i-

,v... .u _- ..+a.n. - , -..2-. - a -.= a - - a s a , -~

.

W. Subalusky -2-

Docket No: 50-373; 50-374

, . License No: NPF-11; NPF-18

Enclosures: -

'

1. -' Notice of Violation

2. Inspection Report 50-373/96010; 50-374/96010(DRP) '

cc w/ enc 1: D. A. Sager, Vice President,

Generation Support .

3

H. W. Keiser, Chief Nuclear

Operating Officer

D. J. Ray, Station Manager

-

J. Burns, Regulatory Assurance

4

Supervisor

' I. Johnson, Acting Nuclear

Regulatory Services Manager i

Richard Hubbard

Nathan Schloss, Economist  :

Office of the Attorney General

State Liaison Officer

'

Chairman, Illinois Commerce '

Commission

Document Control Desk-Licensing

.

Distribution:

Docket File w/ encl DRP w/ enc 1

PUBLIC IE-01 w/ encl - RIII PRR w/enci ,

,

OC/LFDCB w/ encl SRI LaSalle, Dresden,

CAAl w/ encl (E-mail) Quad Cities w/ encl- l

'

Project Manager, NRR w/ encl A. B. Beach, w/ enc 1

RACI (E-Mail) W. L. Axelson, w/ encl

B. L. Burgess, w/enci

!

I

,

!

.

,