ML20135A419

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-373/96-10 & 50-374/96-10 & Notice of Violation
ML20135A419
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 11/26/1996
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Subalusky W
COMMONWEALTH EDISON CO.
Shared Package
ML20135A422 List:
References
NUDOCS 9612030216
Download: ML20135A419 (2)


See also: IR 05000373/1996010

Text

. , - - - -

- - - - -

- - . - - . - - . _ - - - . - . - - - . - - . - . . -

.

,

!

Novsuber 26, 1996

'O l

!

-

4

-

Mr. W. T. Subalusky, Jr.

4

Site Vice President

!

LaSalle County. Station

Commonwealth. Edison Company

i'

2601 N. 21st Road

i

. Marseilles, IL- 61341

,

,

SUBJECT: NRC INSPECTION REPORT NO. 50-373/96010; 50-374/96010(DRP)

'

,.

AND NOTICE OF VIOLATION

L-

Dear Mr. Subalusky:

i

i

!

j'

On September 13, 1996, the NRC completed an inspection at your LaSalle

[

facility. The enclosed report presents the results of that inspection,

i

!

Based on the results of this inspection, the NRC has. determined.that a

i

i

violation of NRC requirements occurred. The violation is cited in the

>

[

enclosed Notice of Violation (Notice) and the circumstances surrounding the

i

violation are described in detail in the enclosed inspection report. The

t

l-

violation is of concern because it exemplifies weaknesses in your conduct of

i

root cause analyses.

i

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

j

response, you should document the specific actions taken and any. additional

r

t

actions you plan to prevent recurrence. Your response may reference or

!

' include previous docketed correspondence, if the correspondence adequately

)

'

addresses the required response. After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

i

i

-inspections', the NRC will determine whether further NRC enforcement action is

i

necessary to ensure compliance with NRC regulatory requirements.

.

!

In accordance with 10 CFR 2.790.of the NRC's " Rules of Practices," a copy of

this-letter, its enclosure, and-your response will be placed in the NRC Public

,

Document Room (PDR).

.

1

Sincerely,

!

/s/ John A. Grobe for

James L. Caldwell, Acting Director

Division of Reactor Projects

DOCUMENT NAME:

R:INSPRPTS\\ POWERS \\LASA\\LAS96010.DRP

To receive a copy of this document, indicate in the be.u "C" = Copy w/o attach /enci "E" = Copy w/ attach /enct "N" = No copy

0FFICE

DRP VW W El &

DRP e

I c- DRP /n//

l

l

NAME

MMcBa'rg6rfsn

Jor W sen

CaldWFT73 robe

DATE

10/22196

10/z2796

80/lI/96

0FFICIAL RECORD COPY

9612030216 961126

PDR

ADOCK 05000373

G

PDR

&

i-

,v...

.u

_-

..+a.n.

-

,

-..2-.

- a -.=

a

-

-

a

s

a

, -~

.

W. Subalusky

-2-

Docket No:

50-373; 50-374

,

. License No: NPF-11; NPF-18

Enclosures:

-

1. -' Notice of Violation

2.

Inspection Report 50-373/96010; 50-374/96010(DRP)

'

'

cc w/ enc 1:

D. A. Sager, Vice President,

Generation Support

.

3

H. W. Keiser, Chief Nuclear

Operating Officer

D. J. Ray, Station Manager

J. Burns, Regulatory Assurance

-

Supervisor

4

I. Johnson, Acting Nuclear

'

Regulatory Services Manager

i

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce

'

Commission

'

Document Control Desk-Licensing

.

Distribution:

Docket File w/ encl

DRP w/ enc 1

PUBLIC IE-01 w/ encl

- RIII PRR w/enci

,

OC/LFDCB w/ encl

SRI LaSalle, Dresden,

,

CAAl w/ encl (E-mail)

Quad Cities w/ encl-

l

Project Manager, NRR w/ encl

A. B. Beach, w/ enc 1

'

RACI (E-Mail)

W. L. Axelson, w/ encl

B. L. Burgess, w/enci

,

!

.

,