Forwards List of Submittals Pending NRR Review Re Grand Gulf Licensing Activities
ML20059L451
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/14/1990
From: Meisner M
ENTERGY OPERATIONS, INC.
To: Quay T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AECM-90-0174, AECM-90-174, NUDOCS 9009270018
Download: ML20059L451 (5)


Text

- - -

p. . .

ggg-u=. m.

~-

~ Ente.eg a Oper ons- rw ats- us niso Tv 601-437 2000 - ,

September 14.-1990 i

, :l

'U.S.' Nuclear Regulatory Commission i Document Control Desk; a Attention: Mr. T. R. Quay  ;

-Mail Station P1-137-r Washington, D.C. 20555 H

Dear Ted:

l

SUBJECT:

Grand Gulf Nuclear Station Unit 1 '

Docket No. 50-416 License No NPF-29 -

Licensing. Activities

AECM-90/0174 L

I appreciate'the time you spent with me last week reviewing Entergy Operations - Grand Gulf licensing activities. Our discussions were particularly helpful for me. in my new position here.

As you requested, I have prepared a 3rioritized list of submittals pending NRR. review, tYou'll note that we lave taken some care to define our i priority. levels.

l It may be worthwhile _ to update this list periodically. As long as we= -r find it mutually beneficial, I'll provide you with revisions when significant-

~

changes or: additions-occur.

l I look forward to working closely with you and Les in the future.

i i

!- 1 5 uly,  ;

1 k> a - -

fr . J. Meisner l 9009270018 900914 rector, Nuclear Licensing 4 PDR ADOCK 0500041Sp  :

P- PNUg s

MJM:be Attachments }

.cc: (See Page-2) 0 ? ? 5."!

AEC91013/SNLICFLR .

(//  !

AECM-90/0174 7'

Page 2 cc: Mr. D. C. Hintz (w/a) - i Mr. T. H. Cloninger (w/a)

Mr. R.-B. McGehee (w/a).

  • Mr. N. S. Reynolds-(w/a)

Mr. H. L'. Thomas (w/o)-

Mr. H. O. Christensen (w/a)

Mr. Stewart D. Ebneter (w/a)

Regional Administrator U.S. Nuclear Regulatory Commission Region-11 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. L. L. Kintner, Project Manager (w/a) -

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission M/sil Stop 11D21 Washington, D.C. 20555 l

.i

'i t

b AEC91013/SNLICFLR

~ Attachment ~1 to-

'*- - c' AECM-90/0174:

OUTSTANDING GGNS SUBMITTALS-Definition of Priority Categories Priority- Description 1 Required to resolve immediate plant safety concern.

2- Required to prevent plant shutdown, derating, startup or outage extension; target date based upon latest effective date which would prevent impact.

3 Change to current technical specifications, commitments, requirements, etc., which provides operational benefit consistent with safety; target date (if applicable) is based upon maximizing expected benefit.

4 Change to current technical specifications, commitments, requirements, etc., for which. adequate administrative controls are in effect to address safety concerns, or which is r.eeded for resolution of long term issues;-target date is generally not applicable and overall schedule is based on NRR prioritization-and resource availability.

p

-j-- '

,i o

l-

'1 b &

ed '

, , AEC91013/SNLICFLR

y ,

~

.+

v Attachment 2 to.. ' l s

sAECH-90/0174 OUTSTAN011Ni GG'NS SUBMITTALS ' .!

~

Initial- .

-Target 1

l Submittal Subject Date Notes  !

Priority 1 1 1

None l Priority 2 j

.02/16/90- Defer neutron monitoring to 11/15/90 l RF05 04/27/90 ADHRS 09/24/90 06/08/90: Cycle 5. reload report 11/01/90 .;

06/28/90' Relief request I-00010 10/01/90 Weld inspection

/.

k 07/09/90 Relief request I-00018 10/01/90 u Pressure boundary. testing ,

08/10/90 ESF battery surveillance 10/18/90 i

L Priority 3 05/19/87' Fire protection program- 12/01/90 1 Shortly. Vendor QA organization change- 11/19/90 2 s

L if Priority 4- ,

^^-

01/26/89 Light Loads .NA 3.

04/26/90- RPV P/T Limits NA

'05/04/90 RWCU Leak' Detection NA  ;

4

05/07/90 Control' Room. Isolation Valves NA 3
06/19/89 SLCS NA 3 j

--08/09/90 Vice President Title Change NA 1: i l- AEC91013/SNLICFLR a g

--(

__2;_1____ _ _ _ i. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ . _ _ _ ---

~~

n 4

-3 i:<

... Attachment 3 to

't "

1.- Target date coincidesLwith annual FSAR update; current fire protection technical specifications will be relocated to FSAR. l

2. Submittal should be made during week of 9/17. Will request NRR approval to centralize the reporting of site vendor QA organizations.
3. -Discussions-appear to be at an impasse. Re-evaluation of positions and i elevation of-issues to a higher level of licensee and NRR managerent may be warranted.

l l  :!

. I L- i l

l.

i 1

l i

L  !

L 'l L

.i i

V 4

o a

i AEC91013/SNLICFLR

't

l t, t

._. 2