ML19327B260

From kanterella
Jump to navigation Jump to search
Forwards Rev 23 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21 & 10CFR2.790(d))
ML19327B260
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/24/1989
From: Borst F
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
P-89405, NUDOCS 8910300015
Download: ML19327B260 (2)


Text

. . . - -

t _

- j

~

SAFEEUARDS INFORMATION l h Public Service

  • Th 16805 WCR 19 1/2, Platteville, Colorado .80651 ,

k October 24, 1989 I Fort St. Vrain Unit No. 1 ,

P-89405 U. S. Nuclear Regulatory Commission  ;

ATTN: Document Control Desk Washington, D.C. 20555 i Docket No. 50-267

SUBJECT:

Security Plan Revision 23

, 1 4

Dear Sirs:

In. accordance with the provisions of 10 CFR 50.54 (p), Revision 23 of the Fort St. Vrain Physical Security Plan with Appendix "B",

and Qualification Plan" and Appendix "C",

" Security Training

" Safeguards Contingency Plan" are submitted for review and approval i as the operational Security Plan for Fort St. Vrain, e

Appendix "A", " Security Plan for the Protection, Receipt and Storage of Special Nuclear Material and Special Security Measures During Refueling Operations", (Confidential), is being submitted as Revision 23, without changes, under separate cover.

The implementation schedule for specific changes is documented under t Attachment 1 to this letter. Those changes which are not specifically identified in Attachment I were implemented on the effective date of the document. Explanations of all changes are documented under Attachment 2 to this letter.

We request that the attached information be withheld from public ,

disclosure pursuant to the provisions of 10 CFR 2.790 (d) and 10 CFR 73.21.

m ENCLOSURE CONTAINS 7/ SAFEGUARDS INFORMATION UPON SEPARATION DES PAGE IS DECONTROLLED q

)

' Su no * ** eioni . SAFEGUARDS

%^ 3'"^ . l*** E _INEORMATION_ _ __ _

r

,f

,' SAFEEUARDS INFORMATION P-89405 October 24, 1989 If .you have sny questions concerning these matters, please contact Mr. M. H. Holmes at (303) 480-6960.

Sincerely, NWA J(>t SW Frederick . orst Nuclear Tra ing and Support Manager Fort St. Vrain Nuclear Generating Station FJB:BJB/dak g Attachments:

1 - Implemetation Schedule for Revision 23 of the Fort St. Vrain Physical Security Plan.

2 - Table of Changes to the Fort St. Vrain Physical Security Plan (Revision.23).

3 Fort St. Vrain Physical Security Plan (Revision 23).

4 - Appendix "B", " Security Training and Qualification Plan",

Fort St. Vrain Physical Security Plan, (. Revision 23).

5 - Appendix "C", " Safeguards Contingency Plan", Fort St. Vrain Physical Security Plan (Revision 23).

cc: Regional Administrator, Region IV Attn: Mr. T. F. Westerman, Chief Projects Section B p CONTADS SAFEGUARDS De0RMA110N UPON SEPARA110N THIS PAGE IS DN" SAFEGUARDS INFORMATION