James A. Fitzpatrick Annual Assessment Letter (Report 05000333/2011001)
ML12061A061
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/05/2012
From: Gray M K
Reactor Projects Branch 2
To: Michael Colomb
Entergy Nuclear Northeast
References
IR-11-001
Download: ML12061A061 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 March 5, 2012 Mr. Michael Colomb Site Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110

Lycoming, NY 13093

SUBJECT: ANNUAL ASSESSMENT LETTER FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2011001)

Dear Mr. Colomb:

On February 14, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the James A. FitzPatrick Nuclear Power Plant (FitzPatrick). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011 through December 31, 2011. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not

include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined that overall, FitzPatrick opera ted in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at FitzPatrick during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be

revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 71003, "Post-Approval Site Inspection for License Renewal," Temporary Instruction (TI)-182, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks," and TI-177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems." The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.

The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

On January 25, 2012, the NRC issued a Confirmatory Order which included a severity level III traditional enforcement violation associated with willfulfulness. Therefore, the NRC plans to conduct IP 92702, "Follow-up on Traditional Enforcement Actions including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders and Alternate Dispute Resolution Confirmatory Orders" to follow-up on actions as documented in the Confirmatory Order.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.

Sincerely,/RA/ Mel Gray, Chief Projects Branch 2 Division of Reactor Projects

Docket No. 50-333 License No. DPR-59

Enclosure:

James A. FitzPatrick Inspection/Activity Plan

cc w/encl: Distribution via ListServ

ML12061A061 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME MJennerich/SMc for BBickett/SMc for MGray DATE 02/27/12 02/27/12 03/01/12

Page 1 of 3 03/01/2012 09:38:49 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site FitzPatrick Inspection / Activity Plan 01/01/2012

-06/30/2013 2/27EXAM-FITZPATRICK INITIAL EXAM 3 1 FY12-FITZ INITIAL OPERATOR LICENSING EXAM U01843 01/23/2012 01/27/2012 1 FY12-FITZ INITIAL OPERATOR LICENSING EXAM U01843 02/27/2012 03/02/2012 71152B-PI&R 4 1 IP Problem Identification and Resolution 71152B 02/27/2012 03/02/2012 1 IP Problem Identification and Resolution 71152B 03/12/2012 03/16/2012 7111111B-FITZ ON-SITE REQUAL INSP W/ P/F RESULTS 2 1 IP Licensed Operator Requalification Program 7111111B 04/23/2012 04/27/2012 TI 182-DEGRADATION OF UNDERGROUND PIPING 1 1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 03/12/2012 03/16/2012 9/10 EXM-FITZPATRICK 2ND INITIAL EXAM 3 1 FY12- FITZ INITIAL OPERATOR LICENSING EXAM (2ND)

U01879 08/06/2012 08/10/2012 1 FY12- FITZ INITIAL OPERATOR LICENSING EXAM (2ND)

U01879 09/10/2012 09/14/2012 ISFSI-ISFSI LOADING 1 1 IP Operation Of An ISFSI 60855 04/01/2012 09/30/2012 MODS-PERMANENT PLANT MODIFICATIONS 3 1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/16/2012 04/20/2012 1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/30/2012 05/04/2012 EP PROGR-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing 7111402 05/07/2012 05/11/2012 1 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/07/2012 05/11/2012 1 IP Emergency Action Level and Emergency Plan Changes 7111404 05/07/2012 05/11/2012 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/07/2012 05/11/2012 71124-RADWASTE 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/30/2012 05/04/2012 7111107T-TRIENNIAL HEAT SINK 1 1 IP Heat Sink Performance 7111107T 05/14/2012 05/18/2012 TI-177-MANAGING GAS ACCUMULATION IN ECCS 3 1 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 05/21/2012 05/25/2012 71124-HP-ACCESS CONTROL 1 1 IP Operation Of An ISFSI 60855 06/04/2012 06/08/2012 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/04/2012 06/08/2012 1 IP Occupational ALARA Planning and Controls 71124.02 06/04/2012 06/08/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 03/01/2012 09:38:49 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site FitzPatrick Inspection / Activity Plan 01/01/2012

-06/30/2013 71124-HP-ACCESS CONTROL 1 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/04/2012 06/08/2012 1 IP Occupational Dose Assessment 71124.04 06/04/2012 06/08/2012 71124.05-RAD INSTRUMENTS INSPECTION 1 1 IP Radiation Monitoring Instrumentation 71124.05 07/09/2012 07/13/2012 71124.06-RETS INSPECTION 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/06/2012 08/10/2012 TI-185-VOLUNTARY GROUND WATER INITIATIVE FOLLOW 1 1 IP Follow-up on the Industry's Ground Water Protection Initiative 2515/185 08/06/2012 08/10/2012 71003-LR COMMITMENTS INSP - PHASE I 2 1 IP Post-Approval Site Inspection for License Renewal 71003 09/24/2012 09/28/2012 7111108G-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - BWR 7111108G 09/24/2012 09/28/2012 71124-HP-EXPOSURE CONTROLS & DOSE ASSESSMENT 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/24/2012 09/28/2012 1 IP Occupational ALARA Planning and Controls 71124.02 09/24/2012 09/28/2012 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/24/2012 09/28/2012 1 IP Occupational Dose Assessment 71124.04 09/24/2012 09/28/2012 1 IP Occupational Exposure Control Effectiveness 71151-OR01 09/24/2012 09/28/2012 1 IP RETS/ODCM Radiological Effluent 71151-PR01 09/24/2012 09/28/2012 92702-CONF. ORDER FOLLOWUP RIVERBEND ADR QA/QC 1 1 IP Followup On Corrective Actions For Violations And Deviations 92702 10/01/2012 12/31/2012 92702-CONF. ORDER FOLLOWUP FITZ ADR ACTION A-D 1 1 IP Followup On Corrective Actions For Violations And Deviations 92702 10/01/2012 12/31/2012 92702-CONF. ORDER FOLLOWUP FITZ ADR ACTION E-F 1 1 IP Followup On Corrective Actions For Violations And Deviations 92702 01/01/2013 03/31/2013 ISFSI-ISFSI LOADING 1 1 IP Operation Of An ISFSI 60855 03/01/2013 06/30/2013 71124-RADIATION SAFETY INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/25/2013 03/29/2013 1 IP Occupational ALARA Planning and Controls 71124.02 03/25/2013 03/29/2013 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/25/2013 03/29/2013 1 IP Occupational Dose Assessment 71124.04 03/25/2013 03/29/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 03/01/2012 09:38:49 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site FitzPatrick Inspection / Activity Plan 01/01/2012

-06/30/2013 7111121-CDBI 6 1 IP Component Design Bases Inspection 7111121 06/10/2013 06/14/2013 1 IP Component Design Bases Inspection 7111121 06/24/2013 06/28/2013 71124-RADIATION SAFETY INSPECTION 1 1 IP Radiological Environmental Monitoring Program 71124.07 06/03/2013 06/07/2013 1 IP Performance Indicator Verification 71151 06/03/2013 06/07/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.