IR 05000333/2021005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for the James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2021005)
ML21242A023
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/01/2021
From: Erin Carfang
Division of Reactor Safety I
To: Rhoades D
Exelon Nuclear, Exelon Nuclear Generation Corp
References
IR 2021005
Download: ML21242A023 (5)


Text

September 1, 2021

SUBJECT:

UPDATED INSPECTION PLAN FOR THE JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2021005)

Dear Mr. Rhoades,

The enclosed inspection plan lists the inspections scheduled through June 30, 2023, for the James A. FitzPatrick Nuclear Power Plant (FitzPatrick). The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:

https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

In addition to the baseline inspection program, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs, effective January 1, 2021, as a result of a finding of low-to-moderate (White) safety significance, discussed in a letter to you dated April 20, 2021. This 95001 supplemental inspection will be scheduled following Exelons notification of readiness. This inspection is conducted to provide assurance that the root causes and contributing causes of any performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.

The NRC will also be performing an inspection of FitzPatricks license renewal program in accordance with Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, effective July 1, 2016.

The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5120 with any questions you have regarding this letter.

Sincerely, Digitally signed by Erin E.

Erin E. Carfang Date: 2021.09.01 Carfang 09:30:59 -04'00'

Erin E. Carfang, Chief Projects Branch 1 Division of Operating Reactor Safety Docket No. 50-333 License No. DPR-59 Enclosure:

FitzPatrick Inspection Plan Distribution via ListServ

ML21242A023 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DORS RI/DORS NAME BPinson ECarfang DATE 8/30/21 9/1/21

IP 22b Site Inspection Activity Plan FitzPatrick 07/01/2021 - 06/30/2023 Unit Start End Activity CAC Title Staff Count Rad Safety - ALARA 1 1 7/5/2021 7/9/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls HEAT SINK INSPECTION 1 1 7/25/2021 8/28/2021 IP 71111.07T 000700 Heat Sink Performance FY21 FITZPATRICK Initial Exam 6 1 8/8/2021 8/20/2021 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

EP EXERCISE INSPECTION - FITZPATRICK 5 1 8/30/2021 9/3/2021 IP 71114.01 000716 Exercise Evaluation 1 8/30/2021 9/3/2021 IP 71151 001397 Performance Indicator Verification RP Radwaste and Transportation / RP Performance Indicators (71124.08 / 71151) - FP 1 1 8/30/2021 9/3/2021 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Evaluations of Changes, Tests and Experiments 3 1 9/20/2021 9/24/2021 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments RP Airborne Rad Control / Occupational Dose Assess (71124.03 / 71124.04) - FP 1 1 2/14/2022 2/18/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 2/14/2022 2/18/2022 IP 71124.04 000728 Occupational Dose Assessment RP Instrumentation 71124.05 - FP 1 1 4/4/2022 4/8/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation Access Auth, Access Control, FFD, SPR, PI- FP 3 1 4/18/2022 4/22/2022 IP 71130.01 000733 Access Authorization 1 4/18/2022 4/22/2022 IP 71130.02 000734 Access Control 1 4/18/2022 4/22/2022 IP 71130.08 000740 Fitness For Duty Program 1 4/18/2022 4/22/2022 IP 71130.09 001656 Security Plan Changes 1 4/18/2022 4/22/2022 IP 71151 001338 Performance Indicator Verification Design Basis Assurance Inspection - Teams - Fitzpatrick 6 1 5/2/2022 5/20/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

Fitz Requal Inspection with P/F Results 2 1 5/9/2022 5/13/2022 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1 5/9/2022 5/13/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance RP Rad Environmental Monitoring Prog. 71124.07 - FP 1 1 7/18/2022 7/22/2022 IP 71124.07 000731 Radiological Environmental Monitoring Program Prepared on 8/25/2021 6:03:47 PM 1 of 2

IP 22b Site Inspection Activity Plan EP PROGRAM INSPECTION - FITZPATRICK 1 1 8/8/2022 8/12/2022 IP 71114.02 000717 Alert and Notification System Testing 1 8/8/2022 8/12/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 8/8/2022 8/12/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 8/8/2022 8/12/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 8/8/2022 8/12/2022 IP 71151 001397 Performance Indicator Verification Inservice Inspection - Fitzpatrick 1 1 9/26/2022 9/30/2022 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP Rad Hazard and Control / PIs (71124.01 / 71151) - FP 1 1 9/26/2022 9/30/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Fitzpatrick - Fire Protection 3 1 3/6/2023 3/10/2023 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1 3/20/2023 3/24/2023 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

Rad Safety - Radiological Hazards 1 1 3/6/2023 3/10/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls FORCE-ON-FORCE PLANNING AND EXERCISE - FP 4 1 4/24/2023 4/28/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1 5/15/2023 5/19/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing License Renewal Phase 4 - Fitzpatrick 4 1 6/5/2023 6/9/2023 IP 71003 000687 Post-Approval Site Inspection for License Renewal EP EXERCISE INSPECTION - FITZPATRICK 5 1 6/19/2023 6/23/2023 IP 71114.01 000716 Exercise Evaluation 1 6/19/2023 6/23/2023 IP 71151 001397 Performance Indicator Verification Prepared on 8/25/2021 6:03:47 PM 2 of 2