Security Baseline Inspection Report 05000333 2023420
ML23173A072
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/26/2023
From: Clark J
Security Performance Evaluation Branch
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2023420
Download: ML23173A072 (1)


Text

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000333/2023420

Dear David Rhoades:

On May 25, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at James A. FitzPatrick Nuclear Power Plant and discussed the results of this inspection with Tim Peter and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Docket No. 05000333 License No. DPR-59

Enclosure:

As stated

Inspection Report

Docket Number:

05000333

License Number:

DPR-59

Report Number:

05000333/2023420

Enterprise Identifier:

I-2023-420-0007

Licensee:

Constellation Energy Generation, LLC

Facility:

James A. FitzPatrick Nuclear Power Plant

Location:

Oswego, New York

Inspection Dates:

April 24, 2023, to May 25, 2023

Inspectors:

C. Roundtree, Team Leader, NSIR

T. Barry, Senior Physical Security Inspector, NSIR

C. Bustamante, Physical Security Inspector, NSIR

K. Hussar, Senior Physical Security Inspector, RI

Approved By:

Jefferson K. Clark, Chief

Security Performance Evaluation Branch

Division of Security Operations

Summary

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting a security baseline inspection at James A. FitzPatrick Nuclear

Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight

Process is the NRCs program for overseeing the safe operation of commercial nuclear power

reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

Inspection Scopes

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for

Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and

records, observed activities, and interviewed personnel to assess licensee performance and

compliance with Commission rules and regulations, license conditions, site procedures, and

standards.

Safeguards

71130.03 - Contingency Response - Force-On-Force Testing

Contingency Response - Force-On-Force Testing (1 Sample)

(1)

NRC inspectors completed the Contingency Response - Force-on-Force (FOF)

Testing inspection procedure by evaluating the licensees performance in

implementing the physical protection program to detect, assess, interdict, and

neutralize threats up to, and including, the design basis threat of radiological

sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.

REPORT ATTACHMENTS

Supplemental Information for the report is considered Safeguards Information and is

located separately within the NRCs Safeguards Information Local Area Network and

Electronic Safe database (SLES), under NS125965.

Inspection Results

No findings were identified.

Exit Meetings and Debriefs

The inspectors verified no proprietary information was retained or documented in this report.

On May 25, 2023, the inspectors presented the security baseline inspection results to

Tim Peter and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

AR 04383426, AR 04383428, AR 04383431

11/10/2020

Corrective Action

Documents

Resulting from

Inspection

AR 04678805, 2023 NRC Security Triennial FOF Drill #1

5/16/2023

Corrective Action

Documents

Resulting from

Inspection

AR 04679024, 2023 NRC Triennial FOF Drill #2

5/17/2023

James A. FitzPatrick Physical Security Plan, Training and

Qualification Plan and Safeguards Contingency Plan

Revision 3

01/04/2023

SY-AA-150-1006-

F-01

Responder Timeline Worksheet

Revision 3,

08/04/2021

SY-JF-101-501

Protective Strategy

Revision 7

71130.03

Procedures

SY-JF-101-502

James A FitzPatrick Nuclear Power Plant Critical Target Sets

Revision 4

09/27/2021