IR 05000333/2023420
| ML23173A072 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 06/26/2023 |
| From: | Clark J Security Performance Evaluation Branch |
| To: | Rhoades D Constellation Energy Generation, Constellation Nuclear |
| References | |
| IR 2023420 | |
| Download: ML23173A072 (1) | |
Text
SUBJECT:
JAMES A. FITZPATRICK NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000333/2023420
Dear David Rhoades:
On May 25, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at James A. FitzPatrick Nuclear Power Plant and discussed the results of this inspection with Tim Peter and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Docket No. 05000333 License No. DPR-59
Enclosure:
As stated
Inspection Report
Docket Number:
05000333
License Number:
Report Number:
Enterprise Identifier:
I-2023-420-0007
Licensee:
Constellation Energy Generation, LLC
Facility:
James A. FitzPatrick Nuclear Power Plant
Location:
Oswego, New York
Inspection Dates:
April 24, 2023, to May 25, 2023
Inspectors:
C. Roundtree, Team Leader, NSIR
T. Barry, Senior Physical Security Inspector, NSIR
C. Bustamante, Physical Security Inspector, NSIR
K. Hussar, Senior Physical Security Inspector, RI
Approved By:
Jefferson K. Clark, Chief
Security Performance Evaluation Branch
Division of Security Operations
Summary
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees
performance by conducting a security baseline inspection at James A. FitzPatrick Nuclear
Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight
Process is the NRCs program for overseeing the safe operation of commercial nuclear power
reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
Inspection Scopes
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared
complete when the IP requirements most appropriate to the inspection activity were met
consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for
Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and
records, observed activities, and interviewed personnel to assess licensee performance and
compliance with Commission rules and regulations, license conditions, site procedures, and
standards.
Safeguards
71130.03 - Contingency Response - Force-On-Force Testing
Contingency Response - Force-On-Force Testing (1 Sample)
(1)
NRC inspectors completed the Contingency Response - Force-on-Force (FOF)
Testing inspection procedure by evaluating the licensees performance in
implementing the physical protection program to detect, assess, interdict, and
neutralize threats up to, and including, the design basis threat of radiological
sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.
REPORT ATTACHMENTS
Supplemental Information for the report is considered Safeguards Information and is
located separately within the NRCs Safeguards Information Local Area Network and
Electronic Safe database (SLES), under NS125965.
Inspection Results
No findings were identified.
Exit Meetings and Debriefs
The inspectors verified no proprietary information was retained or documented in this report.
On May 25, 2023, the inspectors presented the security baseline inspection results to
Tim Peter and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
AR 04383426, AR 04383428, AR 04383431
11/10/2020
Corrective Action
Documents
Resulting from
Inspection
AR 04678805, 2023 NRC Security Triennial FOF Drill #1
5/16/2023
Corrective Action
Documents
Resulting from
Inspection
AR 04679024, 2023 NRC Triennial FOF Drill #2
5/17/2023
James A. FitzPatrick Physical Security Plan, Training and
Qualification Plan and Safeguards Contingency Plan
Revision 3
01/04/2023
SY-AA-150-1006-
F-01
Responder Timeline Worksheet
Revision 3,
08/04/2021
SY-JF-101-501
Protective Strategy
Revision 7
Procedures
SY-JF-101-502
James A FitzPatrick Nuclear Power Plant Critical Target Sets
Revision 4
09/27/2021