ML102440277
| ML102440277 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 09/01/2010 |
| From: | Mel Gray Reactor Projects Branch 2 |
| To: | Peter Dietrich Entergy Nuclear Northeast |
| Gray, Mel NRC/RGNI/DRP/PB2/610-337-5209 | |
| References | |
| Download: ML102440277 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 415 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 1, 2010 Mr. Peter T. Dietrich Site Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093 SUB"IECT:
MID~CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN JAMES A. FITZPATRICK NUCLEAR POWER PLANT
Dear Mr. Dietrich:
On August 12, 2010, the Nuclear Regulatory Commission (NRC) staff completed its performance review of the James A. FitzPatrick Nuclear Power Plant. Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from July 1, 2009 through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter at the James A. FitzPatrick Nuclear Power Plant was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all Pis indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2011. The plan includes an inspection of your independent spent fuel storage installation. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.
Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
I n accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of thiS letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS Is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
P. Dietrich 2
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.
Sincerely, IJ;(//(X:t Mel Gray. Chief Reactor Projects ranch 2 Divisiol1 of Reactor Projects Docket No.
50~333 License No.
Attachment:
James A. FitzPatrick Inspection/Activity Plan ccw/enc/:
Distribution via ListServ
P. Dietrich 2
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5209 with any questions you may have regarding this letter or.the inspection plan.
Sincerely, IRAJ Mel Gray, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket No.
50-333 License No.
Attachment:
James A. FitzPatrick Inspection/Activity Plan cc w/encl:
Distribution via ListServ Distribution w/enel:
K. Kolek, Resident OA M. Oapas, Acting RA RidsNrrPM FitzPatrick Resource D. Lew, Acting ORA RidsNrrDorl Lp11-1 Resource J. Clifford, DRP ROPreports Resource@nrc.gov D. Collins, DRP DRS Branch Chiefs D. Roberts, DRS D. Screnci, PAO P. Wilson, DRS N. Sheehan, PAO L. Trocine, RI OEDO R. Barkley, ORA M. Gray, DRP N. McNamara, SLO B. Bickett, DRP D. Tifft, SLO S. McCarver, DRP A. Klett, NRR E. Knutson, DRP, SRI RidsNrrDirslpabResource S. Rutenkroger, DRP, RI SUNSI Review Complete: _-=8::.:8::....-_ (Reviewer's Initials)
DOCUMENT NAME: S:\\ROP-11 Mid-Cycle Review\\Branch 2\\JAF Me letter 2010.doc ML102440277 After declaring this document "An Official Agency Record u it will be released to the Public.
To receive a copy of this document, Indicate in the box; nc" =Copy without attachment/enclosure "E" =Copy with attachmenYenclosure "N" =No cop ICE RIIDRP E
SMcCarverl SM E
08124/201 0 OFFICIAL RECORD COpy
Page 1 of2 08125/2010 Report 22 i Unit i Number 13:13:46 Planned Dates Start End 06/21/2010 07/02/2010 0912012010 09/24/2010 09/27/2010 10/01/2010 09/27/2010 10/01/2010 09/27/2010 10/01/2010 09/27/2010 10/01/2010 09/27/2010 10/01/2010 11/15/2010 11/19/2010 11/29/2010 1210312010 03/07/2011 03/1112011 03/07/2011 03/1112011 04/11/2011 04/15/2011 05/09/2011 05/131201'1 05109/2011 05/1312011 05/09/2011 05/13/2011 05116/2011 05120/2011 06120/2011 06124/2011 06/20/2011 06/2412011 06/20/2011 06/2412011 OS/20/2011 06124/2011 06/20/2011 06124/2011 09/12/2011 09/1612011 09/2612011 09/30/2011 09/1212011 09116/2011 FitzPatrick Inspection I Activity Plan 07/01/2010 - 12131/2011 Title CDBI
- COMPONENT DESIGN BASES INSPECTION 6
IP 7111121 Component Design Bases Inspection 7111108G
- HP OUTAGE INSPECTION ACCESS/ALARAlAIRIPI IP 71124.01 Radiological Hazard Assessment and Exposure Controls IP 71124.02 Occupational ALARA Planning and Controls IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation IP 71151-0ROl Occupational Exposure Control Effectiveness IP 71151-PR01 RETS/ODCM Radiological Effluent 711528
- PI&R 5
IP 711528 Identification and Resolution of Problems IP 711528 Identification and Resolution of Problems 71124
- HP-INSTRUMENTS IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS IP 71124.05 Radiation Monitoring Instrumentation 71124
- HP-EFFLUENTS IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 71124
- HP*DOSE I REMP IISFSI 1
IP 60855 Operation Of An ISFSI IP 71124.04 Occupational Dose Assessment IP 71124.07 Radiological Environmental Monitoring Program TI-177
- MANAGING GAS ACCUMULATION IN ECCS 2
IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System EP EX
- EP EXERCISE INSPECTION 4
IP 7111401 Exercise Evaluation IP 7111404 Emergency Action Level and Emergency Plan Changes IP 71151-EPOl Drill/Exercise Performance IP 71151-EP02 ERO Drill Participation IP 71151-EP03 Alert & Notification System TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION 4
IP 71111 05T Fire Protection [Triennial]
IP 71111 05T Fire Protection [Triennial]
71124
- HP-ACCESS IP 71124.01 Radiological Hazard Assessment and Exposure Controls mils report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of2 FitzPatrick 08/2512010 13:13:46 Inspection 1Activity Plan Report 22 07/01/2010 - 12/31/2011 Planned Dates Start End Title 71124
- HP-ALARA & PI VERIFICATION 1
10/2412011 10/28/2011 IP 71124.02 Occupational ALARA Planning and Controls 10124/2011 10/2812011 IP 71151*0R01 Occupational Exposure Control Effectiveness 10124/2011 10/28f2011 IP 71151*PR01 RETS/ODCM Radiological Effluent his report does not include INPO and OUTAGE activities.
This report shows only on*site and announced inspection procedures.