Annual Assessment Letter 2005001-Fitzpatrick
ML050610511
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/02/2005
From: Brian Mcdermott
Reactor Projects Branch 2
To: Ted Sullivan
Entergy Nuclear Northeast
References
IR-05-001
Download: ML050610511 (5)


Text

March 2, 2005 Mr. Theodore Sullivan Site Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093

SUBJECT:

ANNUAL ASSESSMENT LETTER - JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2005001)

Dear Mr. Sullivan:

On February 10, 2005, the NRC staff completed its end-of-cycle plant performance assessment for the James A. FitzPatrick Nuclear Power Plant. The end-of-cycle review for FitzPatrick involved the participation of the reactor technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2004. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Overall, FitzPatrick operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct the reactor oversight process (ROP) baseline inspections at your facility through September 30, 2006.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2006. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspectors arriving onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review meeting.

Mr. Theodore Sullivan 2

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610)337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Brian J. McDermott, Chief Projects Branch 2 Division of Reactor Projects Docket No.

50-333 License No.

DPR-59

Enclosure:

FitzPatrick Nuclear Power Plant Inspection/ Activity Plan cc w/encl:

G. Taylor, CEO, Entergy Operations M. Kansler, President, Entergy K. Mulligan, General Manager, Plant Operations D. Pace, VP Engineering B. OGrady, VP Operations Support M. Colomb, Director of Oversight S. Bono, Director, Nuclear Safety Assurance A. Halliday, Manager, Regulatory Compliance J. Fulton, Assistant General Counsel Supervisor, Town of Scriba S. Lyman, Oswego County Administrator C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law P. Eddy, Electric Division, Department of Public Service, State of New York P. Smith, President, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority S. Lousteau, Treasury Department T. Judson, Central New York Citizens Awareness Network

Mr. Theodore Sullivan 3

Distribution w/encl: (VIA E-MAIL)

Region I Docket Room (with concurrences)

S. Collins, RA J. Wiggins, DRA B. McDermott, DRP D. Jackson, DRP S. Lee, OEDO Coordinator R. Laufer, NRR R. Clark, NRR P. Tam, NRR L. Cline, DRP - NRC Senior Resident Inspector D. Dempsey, DRP, Resident Inspector K. Kolek, Resident OA C. ODaniell, DRP N. Sheehan, PAO W. Lanning, DRS Director J. Lubinski, Acting DRS Deputy Director R. Lorson, DRS J. Rogge, DRS L. Doerflein, DRS R. Conte, DRS H. Gray, DRS T. Moslak, DRS P. Frechette, DRS D. Silk, DRS RidsNRRDipmlipb@nrc.gov Institute of Nuclear Power Operations (INPO)

DOCUMENT NAME: G:\\DRP\\BRANCH2\\ROP-5 Files\\Fitz ROP5 Annual Assessment Ltr Rev1.wpd SISP Review Complete: ______bjm____ (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME LCline BMcDermott DATE 03/01/05 03/02/05 OFFICIAL RECORD COPY

FitzPatrick Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2005 16:43:27 Report 22 4

TRI FIRE

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 03/14/2005 03/18/2005 Fire Protection IP 7111105T 1

Baseline Inspections 03/28/2005 04/01/2005 Fire Protection IP 7111105T 1

1 PIR SAMP

- PIR SAMPLE ON RX VSL DRAINDOWN Baseline Inspections 04/04/2005 04/08/2005 Identification and Resolution of Problems IP 71152 1

4 5/16 EXM

- OPERATOR LICENSING INITIAL EXAMS Not Applicable 04/18/2005 04/22/2005 FITZPATRICK INITIAL EXAM (5/9-13/05)

U01525 1

Not Applicable 05/16/2005 05/20/2005 FITZPATRICK INITIAL EXAM (5/9-13/05)

U01525 1

1 7112202

- PUB RAD SAFETY - RADWASTE Baseline Inspections 05/02/2005 05/06/2005 Radioactive Material Processing and Transportation IP 7112202 1

1 7112201

- PUB RAD SAFETY - RETS Baseline Inspections 05/23/2005 05/27/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1

1 7111107B

- HEAT SINK Baseline Inspections 06/13/2005 06/17/2005 Heat Sink Performance IP 7111107B 1

1 7112203

- PUB RAD SAFETY - REMP Baseline Inspections 06/13/2005 06/17/2005 Radiological Environmental Monitoring Program IP 7112203 1

6 7111121

- SSDI Baseline Inspections 08/01/2005 08/05/2005 Safety System Design and Performance Capability IP 7111121 1

Baseline Inspections 08/15/2005 08/19/2005 Safety System Design and Performance Capability IP 7111121 1

1 71121

- OCC RAD SAFETY Baseline Inspections 08/29/2005 09/02/2005 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 08/29/2005 09/02/2005 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 08/29/2005 09/02/2005 Identification and Resolution of Problems IP 71152 1

2 7111401

- EXERCISE & EP PI INSPECTION Baseline Inspections 11/15/2005 11/19/2005 Exercise Evaluation IP 7111401 1

Baseline Inspections 11/15/2005 11/19/2005 Performance Indicator Verification IP 71151 1

3 MODS

- MODS & 50.59 Baseline Inspections 11/14/2005 11/18/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 1

Baseline Inspections 11/14/2005 11/18/2005 Permanent Plant Modifications IP 7111117B 1

1 7111112B

- MAINTENANCE RULE Baseline Inspections 12/12/2005 12/16/2005 Maintenance Effectiveness IP 7111112B 1

3 5/15 EXM

- OPERATOR LICENSING INITIAL EXAMS Not Applicable 04/17/2006 04/21/2006 FITZPATRICK INITIAL EXAM (3/07)

U01599 1

Not Applicable 05/15/2006 05/19/2006 FITZPATRICK INITIAL EXAM (3/07)

U01599 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

FitzPatrick Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2005 16:43:27 Report 22 3

7111111B

- LICENSED OPERATOR REQUAL RROGRAM Baseline Inspections 05/01/2006 05/05/2006 Licensed Operator Requalification Program IP 7111111B 1

Baseline Inspections 05/08/2006 05/12/2006 Licensed Operator Requalification Program IP 7111111B 1

4 71152B

- PI&R Baseline Inspections 07/10/2006 07/14/2006 Identification and Resolution of Problems IP 71152B 1

Baseline Inspections 07/24/2006 07/28/2006 Identification and Resolution of Problems IP 71152B 1

1 71114

- EP PRGM INSP & PI VERIFICATION Baseline Inspections 07/31/2006 08/04/2006 Alert and Notification System Testing IP 7111402 1

Baseline Inspections 07/31/2006 08/04/2006 Emergency Response Organization Augmentation Testing IP 7111403 1

Baseline Inspections 07/31/2006 08/04/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1

Baseline Inspections 07/31/2006 08/04/2006 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1

Baseline Inspections 07/31/2006 08/04/2006 Performance Indicator Verification IP 71151 1

1 71121

- OCC RAD SAFETY Baseline Inspections 09/18/2006 09/22/2006 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 09/18/2006 09/22/2006 ALARA Planning and Controls IP 7112102 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.