2013 Annual Assessment Letter for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2013001)(w/Inspection Plan)
ML14063A056
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/04/2014
From: Michael Scott
Division Reactor Projects I
To: Coyle L
Entergy Nuclear Northeast
Burritt A
References
IR-13-001
Download: ML14063A056 (5)


Text

March 4, 2014

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2013001)

Dear Mr. Coyle:

On February 13, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of James A. FitzPatrick Nuclear Power Plant (FitzPatrick). The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from January 1, 2013, through December 31, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, FitzPatrick operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at FitzPatrick during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (Green) and one performance indicator was of low to moderate safety significance (White) in the Initiating Events cornerstone. Specifically, the Unplanned Power Changes per 7,000 Critical Hours performance indicator exceeded the Green/White threshold value in the fourth quarter of 2012. In addition to baseline inspections, the NRC began a supplemental inspection for the White performance indicator on January 21, 2014, in accordance with Inspection Procedure (IP) 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area." As of the date of this letter, this inspection has not yet been completed. The NRC will notify you of the results of this inspection via a separate inspection report which will be publically available. The performance indicator will continue to be a White ROP Action Matrix input until the performance indicator results allow it to transition below the Green/White threshold. The NRC will notify you via separate correspondence when the plant will transition to the Licensee Response Column.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year (CY) 2014 will reflect this revision to Inspection Manual Chapter (IMC) 0310. The CY 2013 end-of-cycle assessments were conducted using the IMC 0310 guidance in effect in CY 2013 (dated October 28, 2011). Cross-cutting aspects identified in 2013 using the 2013 terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.

The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform IP 71003, Post-Approval Site Inspection for License Renewal - Phase 2, and IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Arthur Burritt at (610)337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/

Michael L. Scott Acting Director Division of Reactor Projects

Docket No.

50-333 License No. DPR-59

Enclosure:

Inspection Plan

cc w/encl:

Distribution via ListServ

ML14063A056

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE RI/DRP RI/DRP RI/DRP

NAME TSetzer/TCS ABurritt/ALB MScott/MLS

DATE 2/26/14 2/28/14 3/4/14

Page 1 of 2 02/25/2014 07:42:35 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site FitzPatrick Inspection / Activity Plan 01/01/2014 - 06/30/2015 4/14EXAM

- FITZPATRICK INITIAL EXAM

1 FY14-FITZPATRICK INITIAL OPERATOR LICENSING EXAM U01887 03/17/2014 03/21/2014

FY14-FITZPATRICK INITIAL OPERATOR LICENSING EXAM U01887 04/14/2014 04/18/2014 95001

- SUPPLEMENTAL INSPECTION

1 IP Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 95001 01/20/2014 01/24/2014 7111111B

- FITZ REQUAL INSPECTION WITH P/F RESULTS

1 IP Licensed Operator Requalification Program 7111111B 04/28/2014 05/02/2014 71152B

- PI&R BIENNIAL

1 IP Problem Identification and Resolution 71152B 04/14/2014 04/19/2014

IP Problem Identification and Resolution 71152B 04/28/2014 05/03/2014 71124

- RADIATION SAFETY INSPECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/07/2014 04/11/2014

IP Occupational ALARA Planning and Controls 71124.02 04/07/2014 04/11/2014

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/07/2014 04/11/2014

IP Occupational Dose Assessment 71124.04 04/07/2014 04/11/2014 71124.08

- RADWASTE

1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 05/05/2014 05/09/2014 8/18EXAM

- FITZPATRICK INITIAL EXAM (2)

1 FY14-FITZPATRICK INITIAL OPERATOR LICENSING EXAM (2ND)

U01888 08/25/2014 08/29/2014

FY14-FITZPATRICK INITIAL OPERATOR LICENSING EXAM (2ND)

U01888 09/22/2014 09/26/2014 71124

- RADIATION SAFETY INSPECTION

1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/19/2014 05/23/2014

IP Performance Indicator Verification 71151 05/19/2014 05/23/2014 EP PROG

- EP PROGRAM INSPECTION

1 IP Alert and Notification System Testing 7111402 07/07/2014 07/11/2014

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 07/07/2014 07/11/2014

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 07/07/2014 07/11/2014 71124

- RADIATION SAFETY INSPECTION

1 IP Radiation Monitoring Instrumentation 71124.05 07/14/2014 07/18/2014 71003

- LR COMMITMENTS INSP PHASE 2

1 IP Post-Approval Site Inspection for License Renewal 71003 08/11/2014 08/15/2014

IP Post-Approval Site Inspection for License Renewal 71003 08/25/2014 08/29/2014 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 02/25/2014 07:42:35 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site FitzPatrick Inspection / Activity Plan 01/01/2014 - 06/30/2015 TRI FI

- TRIENNIAL FIRE PROTECTION

1 IP Fire Protection [Triennial]

7111105T 09/15/2014 09/19/2014

IP Fire Protection [Triennial]

7111105T 09/29/2014 10/03/2014 71124

- RADIATION SAFETY

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/06/2014 10/10/2014

IP Occupational ALARA Planning and Controls 71124.02 10/06/2014 10/10/2014

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/06/2014 10/10/2014

IP Occupational Dose Assessment 71124.04 10/06/2014 10/10/2014

IP Performance Indicator Verification 71151 10/06/2014 10/10/2014 7111108G

- INSERVICE INSPECTION

1 IP Inservice Inspection Activities - BWR 7111108G 10/13/2014 10/17/2014 71124

- RAD SAFETY INSP

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/17/2014 11/21/2014

IP Occupational ALARA Planning and Controls 71124.02 11/17/2014 11/21/2014

IP Radiation Monitoring Instrumentation 71124.05 11/17/2014 11/21/2014 71124

- RAD SAFETY INSPECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/06/2015 04/10/2015

IP Occupational ALARA Planning and Controls 71124.02 04/06/2015 04/10/2015

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/06/2015 04/10/2015

IP Occupational Dose Assessment 71124.04 04/06/2015 04/10/2015

IP Performance Indicator Verification 71151 04/06/2015 04/10/2015 ISFSI

- ISFSI OPERATION INSPECTION

1 IP Operation Of An ISFSI 60855 04/13/2015 04/17/2015

IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 04/13/2015 04/17/2015 MODS

- PERMANENT PLANT MODIFICATIONS

1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 06/01/2015 06/05/2015 7111107T

- TRIENNIAL HEAT SINK

1 IP Heat Sink Performance 7111107T 06/08/2015 06/12/2015 MODS

- PERMANENT PLANT MODIFICATIONS

1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 06/15/2015 06/19/2015 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure