September 3, 2013
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2013006)
Dear Mr. Coyle:
On August 14, 2013, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of the James A. FitzPatrick Nuclear Power Plant (FitzPatrick). The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2012, through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, FitzPatrick operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at FitzPatrick during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low safety significance (Green) and one performance indicator was of low to moderate safety significance (White) in the Initiating Events cornerstone. Specifically, the Unplanned Power Changes per 7,000 Critical Hours, performance indicator exceeded the Green/White threshold value as of fourth quarter of 2012. Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," after your staff has notified us of your readiness for this inspection. This inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition and cause were identified, and the corrective actions are sufficient to prevent recurrence.
The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In addition to the baseline inspections, the NRC will also perform Temporary Instruction 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping - Phase 2, IP 71003, Post-Approval Site Inspection for License Renewal - Phase 2, and IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants.
From July 1, 2012, through June 30, 2013, the NRC issued three severity level IV traditional enforcement violations associated with impeding the regulatory process. Therefore, the NRC also plans to conduct IP 92723, Follow-Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, after your staff has notified us of your readiness for this inspection. This inspection will also include a review of your corrective actions resulting from the IP 92723 inspection conducted in the fourth quarter of 2012 and documented in NRC Integrated Inspection Report 05000333/2012005.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Art Burritt at 610-337-5069 with any questions you have regarding this letter.
Sincerely,
/RA/
Darrell J. Roberts, Director
Division of Reactor Projects
Docket No. 50-333 License No. DPR-59
Enclosure:
FitzPatrick Inspection/Activity Plan
cc w/encl:
Distribution via ListServ
SUNSI Review
Non-Sensitive Sensitive
Publicly Available
Non-Publicly Available OFFICE klm RI/DRP RI/DRP RI/DRP
NAME SMcCarver/SCM ABurritt/ALB DRoberts/DJR
DATE 8/26/13 8/27/13 9/3/13
Page 1 of 2 08/01/2013 10:07:13 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site FitzPatrick Inspection / Activity Plan 07/01/2013 - 12/31/2014 7111121
- CDBI
1 IP Component Design Bases Inspection 7111121 07/08/2013 07/12/2013 EX INSP
- EP EXERCISE INSPECTION
1 IP Exercise Evaluation - Scenario Review 7111408 06/10/2013 08/16/2013
IP Exercise Evaluation 7111401 08/12/2013 08/16/2013 95001
- SUP. INSP. FOR ONE OR TWO WHITE INPUTS
1 IP Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 95001 08/15/2013 12/31/2013 TI 182
- DEGRAD UNDERGROUND PIPING - PHASE 2
1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 09/09/2013 09/13/2013 ISFSI
- ISFSI LOADING INSPECTION
1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 09/16/2013 09/20/2013 92723
- FOLLOWUP FOR THREE SL-IV TE VIOLATIONS
1 IP Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S 92723 10/01/2013 12/31/2013 71124
- RADIATION SAFETY INSPECTION
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/21/2013 10/25/2013
IP Occupational ALARA Planning and Controls 71124.02 10/21/2013 10/25/2013
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/21/2013 10/25/2013
IP Occupational Dose Assessment 71124.04 10/21/2013 10/25/2013
IP Performance Indicator Verification 71151 10/21/2013 10/25/2013 4/14EXAM
- FITZPATRICK INITIAL EXAM
1 FY14-FITZPATRICK INITIAL OPERATOR LICENSING EXAM U01887 03/17/2014 03/21/2014
FY14-FITZPATRICK INITIAL OPERATOR LICENSING EXAM U01887 04/14/2014 04/18/2014 7111111B
- FITZ REQUAL INSPECTION WITH P/F RESULTS
1 IP Licensed Operator Requalification Program 7111111B 04/28/2014 05/02/2014 71152B
- PI&R BIENNIAL
1 IP Problem Identification and Resolution 71152B 04/14/2014 04/19/2014
IP Problem Identification and Resolution 71152B 04/28/2014 05/03/2014 71124
- RADIATION SAFETY INSPECTION
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/07/2014 04/11/2014
IP Occupational ALARA Planning and Controls 71124.02 04/07/2014 04/11/2014
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/07/2014 04/11/2014
IP Occupational Dose Assessment 71124.04 04/07/2014 04/11/2014 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 2 of 2 08/01/2013 10:07:13 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site FitzPatrick Inspection / Activity Plan 07/01/2013 - 12/31/2014 8/18EXAM
- FITZPATRICK INITIAL EXAM (2)
1 FY14-FITZPATRICK INITIAL OPERATOR LICENSING EXAM (2ND)
U01888 07/21/2014 07/25/2014
FY14-FITZPATRICK INITIAL OPERATOR LICENSING EXAM (2ND)
U01888 08/18/2014 08/22/2014 71124.08
- RADWASTE
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 05/05/2014 05/09/2014 71124
- RADIATION SAFETY INSPECTION
1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/19/2014 05/23/2014
IP Performance Indicator Verification 71151 05/19/2014 05/23/2014 EP PROG
- EP PROGRAM INSPECTION
1 IP Alert and Notification System Testing 7111402 07/07/2014 07/11/2014
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 07/07/2014 07/11/2014
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 07/07/2014 07/11/2014 71003
- LR COMMITMENTS INSP PHASE 2
1 IP Post-Approval Site Inspection for License Renewal 71003 08/11/2014 08/15/2014
IP Post-Approval Site Inspection for License Renewal 71003 08/25/2014 08/29/2014 71124
- RADIATION SAFETY INSPECTION
1 IP Radiation Monitoring Instrumentation 71124.05 08/11/2014 08/15/2014 7111108G
- INSERVICE INSPECTION
1 IP Inservice Inspection Activities - BWR 7111108G 09/22/2014 09/26/2014 71124
- RADIATION SAFETY
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/06/2014 10/10/2014
IP Occupational ALARA Planning and Controls 71124.02 10/06/2014 10/10/2014
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/06/2014 10/10/2014
IP Occupational Dose Assessment 71124.04 10/06/2014 10/10/2014
IP Performance Indicator Verification 71151 10/06/2014 10/10/2014 TRI FI
- TRIENNIAL FIRE PROTECTION
1 IP Fire Protection [Triennial]
7111105T 11/03/2014 11/07/2014
IP Fire Protection [Triennial]
7111105T 11/17/2014 11/21/2014 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure