August 28, 2017
SUBJECT:
UPDATED INSPECTION PLAN FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2017005)
Dear Mr. Hanson:
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for the James A. FitzPatrick Nuclear Power Plant. The U.S. Nuclear Regulatory Commission (NRC)
provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
In addition to normal baseline inspections, the NRC will be performing Inspection Procedure 60855.1, Operation of an ISFSI at Operating Plants.
Please contact me at 610-337-5069 with any questions you have regarding this letter.
Sincerely,
/RA/
Arthur L. Burritt, Chief Reactor Projects Branch 5 Division of Reactor Projects
Docket No. 50-333 License No. DPR-59
Enclosure:
Inspection Plan
cc: Distribution via ListServ
SUNSI Review
Non-Sensitive Sensitive
Publicly Available
Non-Publicly Available OFFICE RI/DRP RI/DRP
NAME MCatts ABurritt
DATE 8/14/17 8/15/17
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site FitzPatrick Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 1 of 3 07/18/2017 06:59:57 11/13EXM
- FITZPATRICK INITIAL OL EXAM
1 FY18-FITZ INITIAL OPERATOR LICENSING EXAM U01939 09/18/2017 09/22/2017
FY18-FITZ INITIAL OPERATOR LICENSING EXAM U01939 10/16/2017 10/20/2017 71152B
- PI&R BIENNIAL
1 IP Problem Identification and Resolution 71152B 07/17/2017 07/21/2017
IP Problem Identification and Resolution 71152B 07/31/2017 08/04/2017 EP
- EP EXERCISE EVALUATION
1 IP Exercise Evaluation 7111401 07/24/2017 07/28/2017
IP Performance Indicator Verification 71151 07/24/2017 07/28/2017 71124
- RAD SAFETY INSPECTION
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/21/2017 08/25/2017
IP Occupational ALARA Planning and Controls 71124.02 08/21/2017 08/25/2017
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 08/21/2017 08/25/2017 ISFSI
- ISFSI OPERATIONAL INSPECTION
1 IP Operation Of An ISFSI 60855 10/02/2017 10/06/2017
IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 10/02/2017 10/06/2017 71124
- RAD SAFETY INSPECTION
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/09/2017 10/13/2017
IP Occupational ALARA Planning and Controls 71124.02 10/09/2017 10/13/2017
IP Occupational Dose Assessment 71124.04 10/09/2017 10/13/2017 5/21EXAM
- FITZPATRICK INITIAL OL EXAM
1 FY18 FITZPATRICK EXAM (MAY 2018)
U01981 04/23/2018 04/27/2018
FY18 FITZPATRICK EXAM (MAY 2018)
U01981 05/21/2018 05/25/2018 7111111B
- FITZ REQUAL INSP W/ P/F RESULTS
1 IP Licensed Operator Requalification Program - Annual Review 7111111A 05/07/2018 05/11/2018
IP Licensed Operator Requalification Program 7111111B 05/07/2018 05/11/2018 71124
- HP
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/26/2018 03/30/2018
IP Occupational ALARA Planning and Controls 71124.02 03/26/2018 03/30/2018 7111117T
- 50.59 PROCESS
1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 03/26/2018 03/30/2018 71124.08
- RADWASTE
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 05/14/2018 05/18/2018 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site FitzPatrick Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 2 of 3 07/18/2017 06:59:57 71124
- RETS
1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/21/2018 05/25/2018 HEAT
- TRIENNIAL HEAT SINK
1 IP Heat Sink Performance 7111107T 06/11/2018 06/15/2018 EP
- EP PROGRAM INSPECTION
1 IP Alert and Notification System Testing 7111402 07/16/2018 07/20/2018
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 07/16/2018 07/20/2018
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 07/16/2018 07/20/2018
IP Performance Indicator Verification 71151 07/16/2018 07/20/2018 71124
- RAD INSTRUMENTATION
1 IP Radiation Monitoring Instrumentation 71124.05 08/13/2018 08/17/2018
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 08/13/2018 08/17/2018 71124
- RAD SAFETY INSPECTION
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/24/2018 09/28/2018
IP Occupational ALARA Planning and Controls 71124.02 09/24/2018 09/28/2018
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/24/2018 09/28/2018
IP Occupational Dose Assessment 71124.04 09/24/2018 09/28/2018
IP Occupational Exposure Control Effectiveness 71151-OR01 09/24/2018 09/28/2018 U1 ISI
- UNIT 1 INSERVICE INSPECTION
1 IP Inservice Inspection Activities - BWR 7111108G 09/24/2018 09/28/2018 71152B
- PI&R BIENNIAL
1 IP Problem Identification and Resolution 71152B 04/22/2019 04/26/2019
IP Problem Identification and Resolution 71152B 05/06/2019 05/10/2019 71124
- RAD SAFETY 01,02,03,04
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/22/2019 04/26/2019
IP Occupational ALARA Planning and Controls 71124.02 04/22/2019 04/26/2019
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/22/2019 04/26/2019
IP Occupational Dose Assessment 71124.04 04/22/2019 04/26/2019 EP
- EP EXERCISE INSPECTION
1 IP Exercise Evaluation - Scenario Review 7111408 04/24/2019 06/28/2019
IP Exercise Evaluation 7111401 06/24/2019 06/28/2019
IP Performance Indicator Verification 71151 06/24/2019 06/28/2019 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site FitzPatrick Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 3 of 3 07/18/2017 06:59:57 71124
- RAD SAFETY 01,02,03,04
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/24/2019 06/28/2019
IP Occupational ALARA Planning and Controls 71124.02 06/24/2019 06/28/2019
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/24/2019 06/28/2019
IP Occupational Dose Assessment 71124.04 06/24/2019 06/28/2019 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.