UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 1, 2009 Mr. Peter T. Dietrich Site Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

JAMES A. FITZPATRICK NUCLEAR POWER PLANT

Dear Mr. Dietrich:

On August 12, 2009, the NRC staff completed its performance review of the James A.

FitzPatrick Nuclear Power Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008, through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only - Security Information will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter of 2009 at the James A. FitzPatrick Nuclear Power Plant was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2010. The plan includes an inspection of your independent spent fuel storage installation. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

P. Dietrich 2

As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures as part of our biennial review of the ROP. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mel Gray, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket No. 50-333 License No. DPR-59

Attachment:

James A. FitzPatrick Inspection/Activity Plan cc w/encl:

Senior Vice President and COO, Entergy Nuclear Operations Vice President, Oversight, Entergy Nuclear Operations Senior Manager, Nuclear Safety and Licensing, Entergy Nuclear Operations Assistant General Counsel, Entergy Nuclear Operations E. Dorman, Acting Manager, Licensing, Entergy Nuclear Operations P. Eddy, New York State Department of Public Service P. Church, Oswego County Administrator Supervisor, Town of Scriba C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law S. Lousteau, Treasury Department, Entergy Services J. Spath, Program Director, New York State Energy Research and Development Authority F. Murray, President & CEO New York State Energy Research and Development Authority

P. Dietrich 2

As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures as part of our biennial review of the ROP. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mel Gray, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket No. 50-333 License No. DPR-59

Attachment:

James A. FitzPatrick Inspection/Activity Plan Distribution w/encl:

S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP D. Roberts, DRS P. Wilson, DRS DRS Branch Chiefs L. Scholl, DRS S. Barr, DRS D. Silk, DRS J. Trapp, DRS D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA M. Gray, DRP B. Bickett, DRP J. Heinly, DRP S. McCarver, DRP L. Trocine, RI OEDO R. Nelson, NRR M. Kowal, NRR A. Muniz, PM NRR J. Hughey, NRR G. Hunegs, DRP S. Rutenkroger, DRP K. Kolek, DRP D. Bearde, DRP Region I Docket Room (with concurrences)

ROPreports Resource (All IRs)

SUNSI Review Complete: bab (Reviewer=s Initials)

DOCUMENT NAME: G:\\DRP\\BRANCH2\\ROP\\ROP 10\\Fitz MC ltr FINAL ROP10.doc ML092440147 After declaring this document AAn Official Agency Record@ it will/will not be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME BBickett/mkg for MGray/mkg DATE 08/27/09 08/31/09 OFFICIAL RECORD COPY

P. Dietrich 2

Inspection / Activity Plan Page 1 of 2 08/26/2009 13:48:17 Report 22 07/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site FitzPatrick MODS

- PERMANENT PLANT MODIFICATIONS 3

1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 07/13/2009 07/17/2009 1

IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 07/27/2009 07/31/2009 7111107T

- HEAT SINK INSP 1

1 IP Heat Sink Performance 7111107T 08/31/2009 09/04/2009 71121

- OCC RAD SAFETY 1

1 IP Access Control to Radiologically Significant Areas 7112101 10/19/2009 10/23/2009 1

IP ALARA - Required 7112102-7112102R 10/19/2009 10/23/2009 1

IP Performance Indicator Verification 71151 10/19/2009 10/23/2009 5/03EXAM

- INITIAL OPERATOR LICENSING EXAM 6

1 FY10 - FITZPATRICK INITIAL OPERATOR LICENSING EXAM U01786 04/05/2010 04/09/2010 1

FY10 - FITZPATRICK INITIAL OPERATOR LICENSING EXAM U01786 05/03/2010 05/14/2010 7111111B

- REQUAL INSP WITH P/F RESULTS 3

1 IP Licensed Operator Requalification Program 7111111B 04/26/2010 04/30/2010 71122.02

- RW TRANSPORTATION 1

1 IP Radioactive Material Processing and Transportation 7112202 04/12/2010 04/16/2010 EP PROG

- EP PRPGRAM INSPECTION 1

1 IP Alert and Notification System Testing 7111402 05/23/2010 05/28/2010 1

IP Emergency Response Organization Augmentation Testing 7111403 05/23/2010 05/28/2010 1

IP Emergency Action Level and Emergency Plan Changes 7111404 05/23/2010 05/28/2010 1

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/23/2010 05/28/2010 1

IP Drill/Exercise Performance 71151-EP01 05/23/2010 05/28/2010 1

IP ERO Drill Participation 71151-EP02 05/23/2010 05/28/2010 1

IP Alert & Notification System 71151-EP03 05/23/2010 05/28/2010 CDBI

- COMPONENT DESIGN BASES INSPECTION 6

1 IP Component Design Bases Inspection 7111121 06/07/2010 06/11/2010 1

IP Component Design Bases Inspection 7111121 06/21/2010 07/02/2010 71121.01

- HP INSPECTION 1

1 IP Access Control to Radiologically Significant Areas 7112101 06/14/2010 06/18/2010 1

IP ALARA - Required 7112102-7112102R 06/14/2010 06/18/2010 7111108G

- INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - BWR 7111108G 09/20/2010 09/24/2010 71121.01

- HP OUTAGE INSPECTION 1

1 IP Access Control to Radiologically Significant Areas 7112101 09/20/2010 09/24/2010 1

IP ALARA - Required 7112102-7112102R 09/20/2010 09/24/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 08/26/2009 13:48:17 Report 22 07/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site FitzPatrick 71152B

- PI&R 4

1 IP Identification and Resolution of Problems 71152B 11/15/2010 11/19/2010 1

IP Identification and Resolution of Problems 71152B 11/29/2010 12/03/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.