Security Baseline Inspection Report 05000333/2021402
ML21159A094
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/09/2021
From: Fred Bower
Decommissioning, ISFSI, and Reactor Health Physics Branch
To: Rhoades D
Exelon Generation Co LLC, Exelon Nuclear
References
IR 2021402
Download: ML21159A094 (8)


Text

June 9, 2021

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000333/2021402

Dear Mr. Rhoades:

On May 13, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at James A. Fitzpatrick Nuclear Power Plant and discussed the results of this inspection with Mr. Patrick Navin, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report. Remote inspections were completed on May 7, 2021, and on-site inspections were completed on May 13, 2021.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Fred L. Bower, III, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security

Docket No. 05000333 License No. DPR-59

Enclosure:

As stated

Inspection Report

Docket Number:

05000333

License Number:

DPR-59

Report Number:

05000333/2021402

Enterprise Identifier: I-2021-402-0037

Licensee:

Exelon Generation Company

Facility:

James A. FitzPatrick Nuclear Power Plant

Location:

Oswego, NY

Inspection Dates:

May 3, 2021 to May 13, 2021

Inspectors:

K. Hussar, Senior Physical Security Inspector

D. Caron, Senior Physical Security Inspector

S. McCarver, Physical Security Inspector

J. Rey, Physical Security Inspector

M. Ordoyne, Physical Security Inspector (Training)

G. Stock, Senior Resident Inspector

Approved By:

Fred L. Bower, III, Chief

Security, Emergency Preparedness and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at James A. FitzPatrick Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection on May 3, 2021, unless otherwise noted. Additionally, remote inspections were completed on May 3-7, 2021. On-site inspections were completed on May 10-13, 2021. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: 9 Requirements (02.06 a - d, 02.07 a, 02.08 a, d, f, g)
  • Tier III: 2 Requirements (02.09, 02.10)

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following inspection elements:

Protective Strategy Evaluation (2 Samples)

(1)

  • Tier I: All Requirements
  • Tier II: 15 Requirements (02.05 a, 02.06 a, d, f, g, h, i, j, k, l, m, n, 02.07 a, b, c)
  • Tier III: 4 Requirements (02.08, 02.09 a, 02.10 a, 02.11 a)

(2)

  • The inspectors evaluated the Security Performance Evaluation Program.

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following inspection elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2)since the last performance of this IP and PSP Revision 22 remains current.

71130.14 - Review of Power Reactor Target Sets

The inspectors evaluated the security target set program through completion of the following inspection elements:

Review of Power Reactor Target Sets (1 Sample)

(1) 02.02 (a-d, f), 02.03, 02.04 (a-b),

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 03.17)

=

The inspectors verified licensee performance indicators submittals listed below:

(1) January 1, 2020 through March 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On May 13, 2021, the inspectors presented the security baseline inspection results to Mr. Patrick Navin, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Procedures

SY-AA-101-112

Exelon Security Search Processes

Revision 37

SY-AA-101-120

Control of Security Access Control Devices

Revision 9

SY-AA-101-130

Security Responsibilities for Station Personnel

Revision 26

SY-JF-101-115

Controlling Turnstiles, Gates, Bypass Doors and Active

Vehicle Barriers

Revision 5

SY-JF-101-117

Security Owner Controlled Area and PA Access Controls

Revision 4

71130.05

Calculations

JAF-CALC-04-

00464

Standoff Distance Evaluation Per NRC Order of April 29,

2003 and Implementation Guidance of May 8, 2004

Revision 4

JAF-CALC-04-

00476

Design of Reinforced Concrete Block for Use as a Vehicle

Barrier System

Revision 4

JAF-CALC-10-

00001-EC-55575

Unattended Passage Time to Defeat Calculation Markup

2/25/2015

JAF-CALC-10-

00001/ENGFTZ015-

CALC-012

Unattended Passage Time to Defeat Calculation

Revision 0

JAF-CALC-19-

00024

Kontech BBRE and 10' and 20' Towers - Blast Responses

Revision 0

JAF-CALC-SEC- 04439

Standoff Distance Review Per NRC Order of 02-25-2002

ICM

Revision 0,

1, and 2

Corrective Action

Documents

AR 4374272 AR

4368646

Corrective Action

Documents

Resulting from

Inspection

AR 04423092 AR

04423088

Miscellaneous

20 Quarterly Security Drills

20

Procedures

SY-JF-101-501

Protective Strategy

Revision 7

71130.14

Corrective Action

Documents

AR 04245194 AR

04403401 AR

04422158

Procedures

SY-JF-101-502

Target Sets

Revision 3

SY-JF-101-502-

Target Set Identification Process

Revision 0

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1001

71151

Procedures

LS-AA-2160

Protected Area Security Equipment Performance Index

Revision 5